RE: COST ESTIMATES:-


1. FOR WATER PROOFING OF NALINYAS’ GRAVE AT KASUBI TOMBS.
2. BUILDING AND FINISHING IN TERRAZZO THE GRAVE AT NATETE.

I bring to you greetings in the name of our Lord Jesus Christ. It is my


sincere hope that you are fine.

I herewith annex to this letter are the two submissions as requested


Cost Estimates for the above respectively.

I will be waiting for you positive reply.

Yours faithfully,

………………………………………………………………..
Omulangira Peter Wakaalo Mukasa Binaisa
BILLS OF QUANTITIES FOR :-
Date 7th May 2019 By 0754812856
Item Description Quantity required Rate (UGx) Amount Remark

A. WATER PROOFING OF NALINYAS’ GRAVE AT KASUBI TOMBS


1. Cement 10 bags 31,000/= 310,000/=
2. Lake-Sand ELF 1trip 180,000/= 180,000/= 130000
3. River-Sand ELF 1trip 150,000/= 150,000/= 120000
4. Clay Bricks 1,000pcs 200,000/= 200,000/= 270000
5. Aggregate ELF1trip 150,000/= 150,000/= 160000
6. Dpc 500g 70,000/= 70,000/=
7. Pick Axe 1pc 15,000/= 15,000/=
8. Spade 1pc 15,000/= 15,000/=
9. Hoe 1pc 10,000/= 10,000/=
Sub total 1 1,100,000/=

Add Labour 400,000/=


Grand Total 1,500,000/=

B. BUILDING AND FINISHING IN TERRAZZO THE GRAVE AT NATETE


1. Cement 10 bags 31,000/= 310,000/=
2. Lake-Sand ELF 1trip 180,000/= 180,000/=
3. River-Sand ELF 1trip 150,000/= 150,000/=
4. Clay Bricks 1,000pcs 200,000/= 200,000/=
5. Aggregate ELF1trip 150,000/= 150,000/=
6. Terrazzo/Generator/
Grinder etc item 1,000,000/= 1,000,000/=
Sub total 2 1,990,000/=
Add Labour 600,000/=
Grand Total 2,590,000/=