Making redundancy is the best solution by creating more than one link with different
route, so that our NE can be protected from any incident occurred from one of the
link ,like fiber cut.
2. General problem
When any incident happens in OF link:
3. Specific problem
Due to link unprotected, when any incident happened in our OF link, many NE were down
From Adama - Modjo – Bishoftu
NE which is not link protected and affected due to some incident happen in Adama city.
NE which is affected due to some incident happen from Herero to Dinsho route, more
than 140 sites affected (Goba, Bala Robe, Ginner….).
At Adama city
From MSAG 51 to site 211020 new fibers installed underground so that site 211020
and its down link sites are protected.
From MSAG 15 to site 211047 new fibers installed underground so that site 211047
and its down link sites are protected.
Optical fiber re-habitation for SP link from Herero to Dinsho and OPGW backhaul from
Dodolla to Adaba, Since SP link fiber is detolarated and highly loss and Bale Robe route
was working with DWDM link only.
Bishoftu DWDM NE
10 GE
OPGW FIBER
Adama SSR 2
Microwave
Debrebirhan
Patch cord (LC-LC) 2 From AW4, item code: NW01.01832
Adama
GEM8 (tunable) 1 Existing at Bishoftu BB DWDM NE ID: 157, Slot: [0-1-
5], idle
Core swich
MSAG-23
211043
MSAG65
MSAG-25 211045
211047
MSAG-02
MSAG-15
211054
Core swich
211075
211022
211083
211084
211090
211020
MSAG-51
Meki Alemtena
Dodola 211301 211225
211288 20km
GE
70km
Ziway
SSR02
34km
Ziway
SSR01
80km
Herero Dinsho
67km 34km 178km
Robe Goba
SSR02 211380
19km
Robe
SSR01
Nazereth
Nazereth SSR02
SSR01
Costumers are not losing network and so that we keep our company image and
costumers complain.
The company not loss revenue generated from those protected sites.
7 Challenges
The wire was dropped from EEPCO tower Adama to Bishoftu and it was very difficult
to install overhead. This challenge was resisted and the wire was installed overhead
and makes it functional.
Since the fiber from Herero to Dinsho about 67 km was installed during project and
not fully functional, it was damaged and the performance was degraded, also OPGW
backhaul from Dodolla to Adaba re-habitation of fiber was done day to night to
make it fully functional.