Professional Documents
Culture Documents
Apporved by:
Controlled Document AITM-066, Rev 1. - 05/03/14
Lifting Device Pre-use Inspection Checklist
Document your inspection at least once per week.!!
Pre-use inspections of cranes, slings, and magnets shall be performed before each shift or use.
Operater: Date:
Apporved by:
Controlled Document AITM-066, Rev 1. - 05/03/14
Lifting Device Maintenance Log
Note: Only trained and qualified individuals may perform maintenance or repairs on lifting devices!!
Operater: Month/Year:
Changed tires
Oil changed
Accelerator repaired
Lubricate body components
Grease the mast.
Change light bulbs.
Apporved by:
Controlled Document AITM-066, Rev 1. - 05/03/14
Lifting Device Repair Log
Date
Date Lifting Device Description of Repair (s) being performed Completed
Vendor
1
1
1
1
1
1
1
1
Approved by:
Controlled Document AITM - 066, Rev. 1 - 05/03/14