You are on page 1of 34

BÜCHI Pump Unit C-601/C-610

Prelim. SM 96080, chapter 3


Service Manual

Service S Service Parts / Matrix


Service M Mechanical Components and Routine Maintenance
Service E Electronic Components and Test Instruction
Service D Electronic Diagrams
BÜCHI Pump Unit C-601/C-610
Prelim. SM 96080, chapter 3
Service S

Service S Service Parts / Matrix


Service M Mechanical Components and Routine Maintenance
Service E Electronic Components and Test Instruction
Service D Electronic Diagrams
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Matrix / Service Parts


electrical components versus versions 120V 230V
50/60 50/60
Pos. Description Bezeichnung Code-No.
_______________________________________________________________________________________

Pump C-601:
-- Pump C-601 cpl. 120V - 230V 44100 x x
(power supply switching automatically 120 - 230V)

-- C-601-GS-1 motor control PCB * 44224 x x


-- C-601-GS-2 power supply PCB 44285 x x

* different to C-605

Controller C-610:
-- Controller C-610 cpl. 44200

-- C-610-GS-1 display/mc PCB 44229


-- C-610-GS-2 connector PCB 44234

This Service Manual (SM) is addressed to qualified Service Persons only. It is part of the Operating
Instruction (OI) and the notes, warnings and descriptions therein must be respected. Before servicing
the instrument, please read the Operating Instruction!
All available Spare Parts are mentioned in the Operating Instruction, all available Service Parts are
mentioned in this Service Manual!

_______________________________________________________________________________________

C-601 0308
SM 96080-3-01
B 1 1
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Pump C-601 (old)

Pumpenkopf kpl.
Pump Head (old):
Pump head cpl. new see next page --
Pump seal (radial seal 11,28) (ET) 19390
Ball valve intake cpl. (valve 1) (ET) 44355
Ball valve delivery cpl. (valve 2) (ET) 44120

(see Operating Instruction: Spare Parts ET)

Ventildichtung
Set valve gasket PTFE 2.7/8.6/0.3 (ET) .
for ball valves
(44128 single)

(see Operating Instruction: Spare Parts ET)

Kolben Hinterspülung kpl.


(alt) Piston 'back rinsing' (old):
Back rinsing cpl. --
incl.: Supporting ring;
Gasket 'back rinsing';
Connections;

Kolbenführung kpl. (alt)


Guide for piston unit cpl. (old): --
incl.:
Bearing; Housing;

Kolben kpl.
Piston Unit: 44112
Piston unit cpl.
incl.: Compression spring;
Piston Ring for piston; Gliding ring;

ATTENTION
The pump head has been modified since March 2008:
• see next page

_______________________________________________________________________________________

C-601 0308
SM 96080-3-02
B 1 4
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Pump C-601 (new)

Pumpenkopf rechts kpl.


Pump Head (new):
Pump head right cpl. (new) 44110
incl.:
Pump seal (radial seal 11,28) (ET) 19390
Ball valve intake cpl. (valve 1) (ET) 44355
Ball valve delivery cpl. (valve 2) (ET) 44120
(see Operating Instruction: Spare Parts ET)

Pumpenkopf links kpl.


Pump head left cpl. (new) 51125

Ventildichtung
Set valve gasket PTFE 2.7/8.6/0.3 (ET) .
(44128 single)
Kolben Hinterspülung kpl.
(neu) Piston guide and back rinsing (new):
Set ‘back rinsing’ cpl. (new) 54042
incl.:
Guide for piston; Supporting ring;

Kolben kpl.
Piston Unit: 44112
Piston unit cpl.
incl.:
Compression spring;
Piston Ring for piston; Gliding ring;

Verteilkopf (neu)
Distribution head new cpl. 054051
Set including:
Distribution head
Ball bearing
Disc

ATTENTION
The pump head has been modified since March 2008:
• new pump head with new connections
• new back rinsing with different supporting ring
• new distribution head

_______________________________________________________________________________________

C-601 0308
SM 96080-3-02
B 1 4
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Pump C-601 (3)

Schrittmotor Drive Unit:


Stepping motor:
Stepping motor cpl. 44255

Zahnriemenrad 1
Pulley '1' for belt (motor) 44152

Zahnriemenrad 2
Pulley '2' for belt (eccentric module) 44153

Zahnriemen
Belt 44154

Drehzahlgeberset
Set for 'Tachometer' 40132
Hallsensor incl.:
Hall sensor
Magnetscheibe
Magnet disk

Exzentermodul kpl. Eccentric Module:


Eccentric Module cpl. 44130
incl.:
Ball bearing 10 *30 *9 - 2Z
Ball bearing 17 *30 *7 - 2Z (2*)
Eccentric
Gliding ring

_______________________________________________________________________________________

C-601 0308
SM 96080-3-02
B 2 4
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Pump C-601 (4)

C-601-GS-1 Motorsteuerung Electronic:


C-601-GS-1 motor control PCB 44224
(different to C-605)

C-601-GS-2 Schaltnetzteil
C-601-GS-2 power supply PCB 44285
(90V – 250VAC / 65W / 27V)

DC Axiallüfter
Ventilator DC 24V 44189

Gerätesteckdose
Mains socket 44290

Wippschalter
Mains switch 13477

_______________________________________________________________________________________

C-601 0308
SM 96080-3-02
B 3 4
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Pump C-601 (5)

Diverse:
Set Feet (4*) 44331
Set Puffer (4*) 44330

Schnellkleber
Set Loctite 406/770 44185
(fast glue and primer)

Pumpen Antrieb
Pump Unit cpl. 51123

Schlauch Fitting Set


Tube fitting set (ET) 44021
(Sorter Box full of useful connecting-
parts for the tubing’s)
See Operating Instruction

_______________________________________________________________________________________

C-601 0308
SM 96080-3-02
B 4 4
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Parts Controller C-610

PCB's Electronic:
C-610-GS-1 Display/MC PCB 44229
C-610-GS-2 Connector PCB 44234

Unterteil Mechanic:
C-610 Lower part Controller 44174

Knopf und Deckel


Fenster Knob and cover 37680 / 37681
Window 44216

Folie
Foil C-610 44202

_______________________________________________________________________________________

C-601 0308
SM 96080-3-03
B 1 1
BÜCHI Pump Unit C-601/C-610
Prelim. SM 96080, chapter 3
Service M

Service S Service Parts / Matrix


Service M Mechanical Components and Routine Maintenance
Service E Electronic Components and Test Instruction
Service D Electronic Diagrams
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic

Description of the mechanical parts


Bezeichnungen der mechanischen Teile:
Description of the mechanical parts:

 Distribution head
 Pump head
 Eccentric unit
 Suction Tube (inlet)
 Pressure Tube (outlet)

  For connection see Operating Instruction!




Before opening the instrument, always disconnect power plug!


_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 1 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic (2)

Pump head and piston guide (old)


Removing the pump head and the piston guide:
C-601 Pumpenkopf und Kolbenführung (alt)
• remove all connections to the pump head
• remove the cover for the pump head
• remove the screws 2*M4/20mm / Pzd 1*80
• remove the pump head cpl. from the housing
>replacing the radial seal, see OI, chapter 7
>replacing the ball valves, see OI, chapter 7
• remove the piston support for the 'back rinsing'
• remove the guide for the piston unit
• remove the screws 2*M3/6mm / Torx T10
• remove the screws slowly and turn by turn
>Attention: watch for spring
>piston unit cpl. can be replaced now

Sketch von Kolbenführung und Pumpenkopf (alt) 1. Eccentric (old type sketch only)
C-601 Kolbenführung und Pumpenkopf
(Sketch only 603)
2. Piston unit cpl.
3. Guide for piston unit
4. Gasket for the piston 'back rinsing'
5. Support for piston 'back rinsing'
6. Radial seal
1 2 3 4 5 6 7 7. Pump head cpl.

Opening the C-601


Öffnen des Gerätes
Removing the top cover of C- C-601:
• remove the screw 1* M4/24mm / Torx T20
>(from the top - marked with No. 1 - see left)
• remove the screws 2* M4/12mm / Torx T20
>(from the bottom - marked with No. 1 - see left)
• lift up the top cover of the C-601

>you have access to other parts now

For Part No., see the pages before and/ or in your Operating Instruction!
_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 2 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic (3)

Pump head and piston guide (new)


Removing the pump head and the piston guide:
C-601 Pumpenkopf und Kolbenführung (neu)
• remove all connections to the pump head
• remove the cover at the pump head
• remove the screws 2*M4/20mm / Pzd 1*80
• remove the pump head cpl. from the housing
>replacing the radial seal, see OI, chapter 7
>replacing the ball valves, see OI, chapter 7
• remove the guide for the piston unit
• remove the screws 2*M3/6mm / Torx T10
• remove the screws slowly and turn by turn
>Attention: watch for spring
>piston unit cpl. can be replaced now

Sketch von Kolbenführung und Pumpenkopf (neu) 1. Eccentric (new type -sketch only)
2. Piston unit cpl.
3. Guide for piston unit with ‘back rinsing’
4. Supporting ring
5. ---
6. Radial seal
7. Pump head cpl.

Opening the C-601


(see page before)

ATTENTION
The pump head has been modified since March 2008:
• new pump head with new connections
• new back rinsing with different supporting ring
• new guide for piston

For Part No., see the pages before and/ or in your Operating Instruction!
_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 3 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic (4)

Motor / Belt / Tachometer


Elektronik - Ansicht von oben
Removing the motor / belt / tachometer:
tachometer:
>Att.: always mark the positions of the mech. parts!
• remove the screws 4*M4/8mm / Pzd 1*80
from the holder of the motor
>the motor or the motor pulley can be replaced now
>Att.: the pulley for the motor is smaller then the
pulley for the Eccentric!
• remove the screws 3*M4/12mm / Torx T20
from the bottom, holding the Eccentric unit
• lift up the Eccentric unit
>the belt can be replaced now
>Att.: check the tension of the belt for refitting
>the hall sensor can be replaced now

Eccentric Unit
C-601 Exzenter - Ansicht von oben
Removing the Eccentric:
Eccentric:
• remove the screws 3*M4/12mm / Torx T20
from the top cover of the Eccentric
>upper ball bearing from the Eccentric could be
replaced now with an extraction tool (if defective)
• remove all pump heads as described above
• remove the magnet disc for the hall sensor
• remove the pulley for the belt on the Eccentric
• pull of the pulley (watch for the distance from the
housing)
>the cpl. Eccentric incl. ball bearings can be
pushed out now

C-601 Eccentric - Ansicht kpl.

Attention: Always mark the position of mechanical parts for refitting!


_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 4 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic (5)

Distribution head (old)


Verteilkopf kpl. (alt)
Removing the distribution
distribution head:
>Att.: always mark the positions of mech. parts!
• remove the screws 3*M4/12mm / Torx T20
• remove all connection to the distribution head
• lift up the distribution head
• remove the screws 3*M3/6mm / Torx T10
• clean with alcohol
• dry with pressured air

Distribution head (new)


Verteilkopf kpl. (neu)
Removing the distribution head:
>Att.: always mark the positions of mech. parts!
• remove the screws 3*M4/12mm / Torx T20
• remove all connection to the distribution head
• lift up the distribution head
• remove the screws 2*M3/6mm / Torx T10
• new head can not be dismantled
• clean with alcohol
• dry with pressured air

ATTENTION
The pump head has been modified since March 2008:
• new distribution head

_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 5 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Mechanic (6)

Troubleshooting

Malfunction Possible cause Remedy


_______________________________________________________________________________________

air bubbles in the hoses ball valves clogged clean with alcohol
dry with pressured air
replace valves

-------------------------------------------------------------------------------------------------------------------------------------
flow rate not ok hoses clogged replace hoses
(after trying to calibrated) ball valves clogged replace valves
gasket defective replace gaskets
leakage check where leak and repair

Note: flow rate can vary up to 10% if you work with low pressure or high pressure!

-------------------------------------------------------------------------------------------------------------------------------------

pressure build up not ok see above see above

-------------------------------------------------------------------------------------------------------------------------------------

leakage of solvent check: see above


where is the leak?
possible cause: connections
see above

-------------------------------------------------------------------------------------------------------------------------------------

_______________________________________________________________________________________

C-601 0308
SM 96080-3-04
B 6 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Routine Maintenance

Instrument : C-601 / C-610 230VAC


SNR :
Date :
SW Version :
Sign. :
_______________________________________________________________________________________

Note
This description is addressed to qualified service persons only. It is part of the Service Manual (SM)
and the Operating Instruction (OI). The warnings and descriptions therein must be respected. Before
maintaining C-601 please read chapter 7 of your OI, some maintenance steps are already described!
Remember: Pump C-601 can be run only with Pump Controller/Manager connected!

Attention
After the routine maintenance:
Only connect the C-601 to mains supply which is grounded properly! Otherwise the unit will not be
safe and C-601 may not work correctly! Make sure the mains voltage is 230VAC +/-15%!
Never run the pump without solvent connected for more then 3 min.!

Introduction
The following benefits result from a regular routine maintenance operation:
• the safety of operability of the unit is ensured
• faulty functions can be recognized at an early stage
• requirements set by quality management standards and regulations can be used efficiently

Maintenance Intervals
The routine maintenance operation should be carried out at least once a year. The maintenance
operation should be carried out before an OQ (Operational Qualification) is performed (except first
OQ). The maintenance operation should be carried out before a repair as far as possible.

Replacing parts
The service live of some parts are limited to a certain time and should be replaced after this time has
expired. The live time of these parts and all the replacement procedure are described in this Service
Manual! The disposal of parts is described in your OI, chapter 7!

Parts needed
Following parts should be ordered before performing a maintenance operation:
• 3* radial seal for the pump heads .
• 3* ball valve intake (inlet) for the pump heads .
• 3* ball valve delivery (outlet) for the pump heads .
• (see OI) replace all 3 seals always at once .

Tools needed
Following basic tools are needed:
• rag moistened with alcohol to clean housing
• basic electronic tools
• tools supplied with the pump: torx allen wrench T10 and T20, Turix wrench
and torx allen wrench T6 / Philips screwdrivers
_______________________________________________________________________________________

C-601 0308
SM 96080-3-05
A 1 3
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Routine Maintenance (2)

Check list
1. Cleaning and visual control
2. Functional Test

1. Cleaning and visual control


Always:
• Cleaning / cleaning the tubing system with distilled water
• Piston 'back rinsing'
• Checking / changing the seals
• Checking / changing the valves
• Checking / changing the suction and the pressure tubing
• Checking the mains earth connections
• Housing and installation

After 3 years:
• clean: as described on the following page
• replace: as described on the following page

Cleaning / Cleaning the tubing system with distilled water


The cleaning is already described in your Operating Instruction, chapter 7!
It is advisable to do the cleaning with distilled water before starting to make a routine maintenance:
• connect a H20 tank filled with distilled water to the input of the C-601
• make a few 'simulations of pumping' to fill and clean all hoses with water
• Attention: Do not forget to connect correctly again at the end of the routine maintenance!

Routine Maintenance - 'Cleaning'  OK  NOK

Piston 'back rinsing'


The piston 'back rinsing' is already described in your Operating Instruction, chapter 7!
Please follow the instruction therein.

Routine Maintenance - 'Piston


'Piston back rinsing'  OK  NOK

Checking / Changing the seals


Checking / changing the seals is already described in your Operating Instruction, chapter 7!
Please follow the instruction therein.

Routine Maintenance - 'Checking the seals'  OK  NOK

Checking / Changing the valves


Checking /changing the valves is already described in your Operating Instruction, chapter 7!
Please follow the instruction therein.

Routine Maintenance - 'Checking the valves'  OK  NOK

_______________________________________________________________________________________

C-601 0308
SM 96080-3-05
A 2 3
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Routine Maintenance (3)

Checking / Changing the tubing


Checking / changing the tubing is already described in your Operating Instruction, chapter 7!
Please follow the instruction therein.

Routine Maintenance - 'Checking the tubing'  OK  NOK

Checking the mains earth connections


• open the top panel of the unit
• check the earth connection of the mains input
• check the earth connection of the housing
• only connect the instrument to mains supply which is properly grounded!
• reassemble the unit

Routine Maintenance
Maintenance - 'Mains Earth Connection'  OK  NOK

Checking the housing and installation


• clean the housing with a rag moistened with alcohol
• connect all hoses correctly again at the end of the routine maintenance
• see Operation Instruction for correct installation

Routine Maintenance - 'Housing and Installation'  OK  NOK

2. Functional Test

After any 'Maintenance Operation' has been done, a test according to the ‘Test Instruction’
described in this SM should be performed!

Follow the Test Instructions:


Function Test

_______________________________________________________________________________________

C-601 0308
SM 96080-3-05
A 3 3
BÜCHI Pump Unit C-601/C-610
Prelim. SM 96080, chapter 3
Service E

Service S Service Parts / Matrix


Service M Mechanical Components and Routine Maintenance
Service E Electronic Components and Test Instruction
Service D Electronic Diagrams
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic

Replacing the C-601-GS-2 power supply PCB


C-601 Power Supply PCB
• remove all cables from the PCB
• remove the screws 4*M3/5mm / Torx T10 from the
corners of the PCB

>check: 1* fuse 4AT
>Power supply PCB can be replaced now

+ UN -
Power Supply
I
Measuring Voltages:
RE
Output -> 27VDC
UN / V RE/ (25°) IN / A PN / W

27 --- 2.5 65

Replacing the C-601-GS-1 motor control PCB


C-601-GS-1 PCB
• remove all cables from the PCB
• remove the nuts 4*M3 from the corners of the PCB

>check LED display 'VCC', in the middle of the PCB
>Motor control PCB can be replaced now

Note:
If it is not possible to remove the GS-1 PCB,
one screw M4/8mm / Torx T20 from the bottom
cover may have to be loosened!

Attention:
on the GS-1 side of the electronic chassis,
+ UN -
C-601-GS-1
only 8mm screws are to be used!
I
Measuring Voltages:
RE
Input -> 27VDC
UN / V RE/ (25°) IN / A PN / W

27 --- -- --

Before opening the instrument, always disconnect power plug!


_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 1 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic (2)

Replacing the 'Stepping Motor'


Schrittmotor

• how to change the motor is already described in


the pages before

Step motor
Measuring Voltages:
Input -> 24VDC<
UN / V RE/ (25°) IN / A PN / W

24 ~ 2 (U-V) <3 dep.

Replacing the Ventilator


Lüfter

• remove the cable from the PCB


• remove the screws 4* M3/22mm / Pzd 1*80
from the back of the ventilator

+ UN -
Ventilator (with integr. electronic)
I
Measuring Voltages:
RE
Input -> 24VDC<
UN / V RE/ (25°) IN / A PN / W

24 (M) < 0.1 1

_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 2 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic (3)

Check on Pump C-601

Check supply voltages:


+
J4 27V +/- 0.5V
MP AGND
+
MP 12V +/- 0.5V
+
MP 5V +/- 0.3V (VCC)
Caution: PCB and pressure sensor are factory adjusted.

Caution:

The pump must not be operated longer than 3 minutes under dry conditions! For adjustments and
check in the pressure sensor electronic, disconnect the pump electrically! Switch off the instrument, if
anything is connected or disconnected! For adjustments and check in the motor control electronic,
the pump must be operated under wet conditions! (suitable solvent or distilled water)

_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 3 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic (4)

Replacing the C-610-GS-1/2 PCB's


PCB
Removing the PCB's:
• remove screws 4*M3/10mm / Torx T10
on the corners of the bottom cover
• lift up the cover
>PCB's can be replaced now

>Check: input 24V/5V/+U

_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 4 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic (5)

Troubleshooting Electronic

Malfunction Possible cause Remedy


_______________________________________________________________________________________

C-601 not working at all mains connection missing check mains input
mains switch defective replace mains switch
fuse F1 on power supply PCB check fuse F1
fuse F2 on motor control PCB check fuse F2 ( not fitted )
+12VDC missing check PCB
+ 5VDC missing check PCB

-------------------------------------------------------------------------------------------------------------------------------------

C-601 pump not starting pump controller not connected or defective

-------------------------------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------------------------

C-610 not working at all connection from C-601 missing check connection
+12VDC missing check PCB
+ 5VDC missing check PCB
wrong Pump Module check if C-601
-------------------------------------------------------------------------------------------------------------------------------------

For more information see also in your Operating Instruction:


Troubleshooting and Maintenance!
_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 5 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Service Electronic (6)

Error Messages on C-610

All Error Messages are described in your OI and explained on the display!

For example:
Error 02 : Bad connection to pump!
Check: - Cable connection
-
-

_______________________________________________________________________________________

C-601 0308
SM 96080-3-06
B 6 6
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Test Instruction

Instrument : Pump Module C-601


Instrument : Pump Controller C-610
SNR / Voltage :
SW Version : Pump Controller:
Date :
Sign. :
Test : after repair / maintenance
_______________________________________________________________________________________

Note
This Test Instruction is addressed to qualified service persons only. It is part of the Service Manual
(SM) and the Operating Instruction (OI). The warnings and descriptions therein must be respected.
Before testing the instrument, please read chapter 3 of your OI. The Pump C-601 is not working
without the Pump Controller or the Pump Manager, the Pump C-605 is not working without the Pump
Manager. The SW Version of the Pump Controller can be checked on the display.

Attention
Only connect the instrument to mains supply which is grounded properly! Otherwise the unit will not
be safe and may not work correctly! Make sure the mains voltage is 230VAC +/-15%! Never run the
pump without solvent connected for more then 3 min.!

Preparation
Prepare and connect the unit as shown below!

Test Setup

Test Setup

1 flask filled with solvent 2 input distribution head


3 pump unit 4 output distribution head
5 manometer min. 10 bar 6 collecting flask
7 output hose 8 pump controller

_______________________________________________________________________________________

C-601 0308
SM 96080-3-08
B 1 2
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Test Instruction (2)

Check list
1. Function Test
2. Visual Test

1. Function Test

Function Test for Pump C-


C-601 with Pump Controller C-
C-610!

Checking and/or calibrating the delivery rate

The controlling and calibration of the delivery rate is already described in your Operating Instruction.

Checking the pressure rate

• connect the C-601 / C-610 according to the Test Setup on page before
- use a filled column or similar for pressure build-up
- connect a manometer min. 10 bar
- use distilled water for solvent

• switch on / start the pump


• adjust the flow to approx. 100 ml
• adjust the pressure to approx. 10 bar
> pressure rate can be measured now with the manometer
> leaks can be checked while pressure is rising
• switch off pump

Test result - 'Function test'  OK  NOK

Note:
This is only a test for the Pump used as a 'stand-alone' unit including the Controller!
Other components from the Büchi Sepacore System should be connected for a complete test!

2. Visual Test

Instrument  OK  NOK
Installation  OK  NOK
Accessories  OK  NOK

_______________________________________________________________________________________

C-601 0308
SM 96080-3-08
B 2 2
BÜCHI Pump Unit C-601/C-610
Prelim. SM 96080, chapter 3
Service D

Service S Service Parts / Matrix


Service M Mechanical Components and Routine Maintenance
Service E Electronic Components and Test Instruction
Service D Electronic Diagrams
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Diagrams Pump C-601

Block Diagram C-601 SZ044221

Wiring Diagram C-601 EZ044289

PS Step M

C-601 – C-605

_______________________________________________________________________________________

C-601 0308
SM 96080-3-09
B 1 2
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Diagrams Pump C-601

C-601-ES-1 Motorensteuerung SZ044221

C-601-GS-1 Motorensteuerung EZ044220

_______________________________________________________________________________________

C-601 0308
SM 96080-3-09
B 2 2
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Diagrams Controller C-610

C-610-ES-1 Display / MP Print SZ044226

C-610-GS-1 Display / MP Print SZ044225

_______________________________________________________________________________________

C-601 0308
SM 96080-3-10
B 1 2
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Diagrams Controller C-610

C-610-ES-2 Buchsenprint SZ044231

C-610-GS-2 Buchsenprint EZ044230

_______________________________________________________________________________________

C-601 0308
SM 96080-3-10
B 2 2
BÜCHI Pump Unit C-601/C-610
_______________________________________________________________________________________

Electronic-Diagrams

All Electronic Diagrams must be ordered separately if needed!

Please see under the ‘list of contents’ (chapter 0) for Electronic Diagrams available.

_______________________________________________________________________________________

C-601 0308
SM 96080-3-11
B 1 1

You might also like