The document is a check list for work that needs to be completed prior to ceiling closure at the main fire station. It lists items related to HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, communication, and fire protection systems that must be checked off as complete before closing the ceiling of the E Learning Room located on the ground floor.
The document is a check list for work that needs to be completed prior to ceiling closure at the main fire station. It lists items related to HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, communication, and fire protection systems that must be checked off as complete before closing the ceiling of the E Learning Room located on the ground floor.
The document is a check list for work that needs to be completed prior to ceiling closure at the main fire station. It lists items related to HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, communication, and fire protection systems that must be checked off as complete before closing the ceiling of the E Learning Room located on the ground floor.
2 Lighting System 3 Lighting Control System 4 Power Monitoring System 5 Central Battery System 6 Emergency Power System 7 Power Distribution System 8 Lighting System 9 Lighting Control System 10 Power Monitoring System 11 Central Battery System
1 Building Management System
2 Access Control System 3 CCTV System 4 Fire Alarm System 5 Audio Visual System 6 Structured Cabling System 7 Wireless LAN 8 Others 9 Fire stop for head of all joints 10 Fire stop for through penetration joints 11 Water Leak Test for Water Proofing 12 Building Management System 13 Access Control System 14 CCTV System 15 Fire Alarm System 16 Audio Visual System 17 Structured Cabling System
1 Fire stop for head of all joints
2 Fire stop for through penetration joints 3 Water Leak Test for Water Proofing