The document is a check list for work that needs to be completed prior to ceiling closure in the E Learning Room located on the ground floor of the main fire station. It lists work for HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, and fire safety systems. Verification of fire stopping and water leak testing is also required before the ceiling can be closed.
The document is a check list for work that needs to be completed prior to ceiling closure in the E Learning Room located on the ground floor of the main fire station. It lists work for HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, and fire safety systems. Verification of fire stopping and water leak testing is also required before the ceiling can be closed.
The document is a check list for work that needs to be completed prior to ceiling closure in the E Learning Room located on the ground floor of the main fire station. It lists work for HVAC, drainage, plumbing, fire fighting, power distribution, lighting, security, and fire safety systems. Verification of fire stopping and water leak testing is also required before the ceiling can be closed.
2 Lighting System 3 Lighting Control System 4 Power Monitoring System 5 Central Battery System 6 Emergency Power System 7 Power Distribution System 8 Lighting System 9 Lighting Control System 10 Power Monitoring System 11 Central Battery System
1 Building Management System
2 Access Control System 3 CCTV System 4 Fire Alarm System 5 Audio Visual System 6 Structured Cabling System 7 Wireless LAN 8 Others 9 Fire stop for head of all joints 10 Fire stop for through penetration joints 11 Water Leak Test for Water Proofing 12 Building Management System 13 Access Control System 14 CCTV System 15 Fire Alarm System 16 Audio Visual System 17 Structured Cabling System
1 Fire stop for head of all joints
2 Fire stop for through penetration joints 3 Water Leak Test for Water Proofing