You are on page 1of 3

“Contractor”

Plot No. F-32, Gali No. 1,


Ganga Vihar, Delhi-110094

RAJESH PARAS SUGANDH KUMAR


CONTRACT MANAGER DIRECTOR OF COMPANY
Mob.: 7599165261 Mob.:, 7011214775

Email: designconstruction77@gmail.com
Web: https://www.indiamart.com/company

LABOUR RATE LIST 2018(DELHI/NCR)

S.NO. ITEM RATE PER SQ. FT.


1. Oil Bond Without Putty 7.50
2. Oil Bond With Putty 11.25
3. Plastic Paint/3 in One 22.50
4. Velvet Touch/Royal Shi ne 31.00
5. Apex Without Base/ Whether Shield 15.00
6. Apex With Base/Whether Shield 22.50
7. Wall Putty Exterior per Coat 4.00
8. Wall Putty Interior per Coat 4.00
9. Grill Paint Enamel 25.00
10. Red Oxide 7.50
11. Enamel Paint 25.00
12. Sprit Polish 55.00
13. Melamine Polish(Natural) 68.00
14. P.U Polish(Natural) 85.00
15. Coloured Polish 115.00
16. Duco Paint(N.C. Base) 85.00
17. P.U. Duco Metallic Paint (P.U Base) 125.00
18. Wood Pallete P.U 125.00
19. Emporeo P.U Polish & Paint 150.00
20. Polister P.U 305.00

WITH MATERIAL RATE LIST 2018(DELHI/NCR)

S.NO. ITEM RATE PER SQ. FT.


1. Oil Bond Without Putty 15.00
2. Oil Bond With Putty 20.00
3. Plastic Paint/3 in One 43.00
4. Velvet Touch/Royal Shine 60.00
5. Apex Without Base/ Whether Shield 25.00
6. Apex With Base/Whether Shield 41.00
7. Wall Putty Exterior per Coat 8.00
8. Wall Putty Interior per Coat 7.50
9. Grill Paint Enamel 52.00
10. Red Oxide 15.00
11. Enamel Paint 52.00
12. Sprit Polish 100.00
13. Melamine Polish(Natural) 143.00
14. P.U Polish(Natural) 185.00
15. Coloured Polish 227.00
16. Duco Paint(N.C. Base) 180.00
17. P.U. Duco Metallic Paint (P.U Base) 270.00
18. Wood Pallete P.U 270.00
19. Emporeo P.U Polish & Paint 280.00
20. Polister P.U 675.00
Terms and Condition:-
● Material use will be branded Company (Asian,Burger,ICI Dulix,Birla,etc.).

● Measurement of Chaukhats,moulding & Margin will be measured in Running

feet.

● Measuremenr of Chaukhat will be measured in Running feet in Petam side.

● The rate list valid upto 6 months in the working time.If you extend the above

work 10% charge will be extra.

● The Measurement (Interior & Exterior) depend on the Numbers of colours &

the designing work.false walls and ceiling will be two time.

● Doors and Chaukhats measurement depends on designing.

● Rubbing and Buffing of polish will be extra charge.

● 25% Payment in advance and remaining payment will be weekly as per work.

● Cleaning Charge will be extra.

● Water,Electricity, Store room and Accomodation for labour provide by client.

You might also like