Check-List for Completed Valve / Flow Meter Chamber [Rev 0: 01-07-2020]

Contract No. KWSP2/W-3-…… Date of Overall Completion of the Chamber: ………………….

Chamber Type Air Valve / Washout Valve / Isolation Valve / Butterfly Valve / Flow Meter /……………………

Pipeline Primary / Secondary / Tertiary Type/Size:……………………. DMA:……………

Chainage (if on primary or secondary pipeline):………………………………………………….

Location description:………………………………………………………………………………

Valve Valve Size:……… Valve Details (if any): ……………………………………………….. .

Dimensions Length x Width x Height (Internal):………………………………….

Chamber Concrete Grade:……… Results satisfactory: ☐: Yes ☐: No ☐: N/A

Manhole Sizes (1)……………………………… (2)……………………………….

Foundation preparation Inspected / Satisfactory? : ☐: Yes ☐: No

Concrete / Reinforcement / Curing As per drawing / Satisfactory? : ☐: Yes ☐: No


Construction
Manhole covers setting Correctly installed and working? : ☐: Yes ☐: No

Pipework connections and valves Installed / checked? : ☐: Yes ☐: No

Surround backfilled and compacted? : ☐: Yes ☐: No

Completion Finished top level matches with road level? ☐: Yes ☐: No

Excess material / debris removed and site restored and tidy? ☐: Yes ☐: No

Photo /
Comments

OIC (CGC) ..………………..… Inspector (NJS) ..……………….… PE/SPE (NJS) ..…..…………