SUMMARY OF COST

S.N. Description of works Amount (NRs) Remarks

A General Item 1,392,980.00 -


B Pavement Works 115,542,692.89 143834.03%
C Drainage and Associated work 100,840,251.74
D Bio-engineering works 30,000.00 37.35%
E Structural/ Side Drain/ Cross Drainage 4,661,449.56 5802.83%
F Outlet Protrction Work 589,648.47 734.03%
G Structure Work 39,781,985.50 49522.85%
H Day Works 617,927.50 100%(I)
VAT @13% of Base Cost 80,330.57 II=13% of I
Contingency @ 5% of Base Cost 30,896.37 III=5% 0f I
Total Cost including VAT & Contingency 729,154.44 IV=I+II+III
Price adjustment Contingency @ 10% of Base Cost 61,792.75 V
Physical Contingency @ 10% of Base cost 61,792.75 VI
Grand Total Cost 852,739.94 VII=IV+V+VI
Grand Total Cost 318,166,130.09 VIII=IV/4.5641