Department Of Urban Development & Building Construction Babarmahal, Kathmandu
SUMMARY OF COST
S.N. Description of works Amount (NRs) Remarks
A General Item 1,392,980.00 -
B Pavement Works 115,542,692.89 143834.03% C Drainage and Associated work 100,840,251.74 D Bio-engineering works 30,000.00 37.35% E Structural/ Side Drain/ Cross Drainage 4,661,449.56 5802.83% F Outlet Protrction Work 589,648.47 734.03% G Structure Work 39,781,985.50 49522.85% H Day Works 617,927.50 100%(I) VAT @13% of Base Cost 80,330.57 II=13% of I Contingency @ 5% of Base Cost 30,896.37 III=5% 0f I Total Cost including VAT & Contingency 729,154.44 IV=I+II+III Price adjustment Contingency @ 10% of Base Cost 61,792.75 V Physical Contingency @ 10% of Base cost 61,792.75 VI Grand Total Cost 852,739.94 VII=IV+V+VI Grand Total Cost 318,166,130.09 VIII=IV/4.5641