Barangay VIEJO
Municipality PAGSANGHAN
Province SAMAR
Region VIII
PROGRAM OF WORKS
Equipment Needed:
Source of Fund
Breakdown Estimated Project Cost Community Local Government units
CDD Grant TOTAL COST
In-kind BLGU In-kind BLGU Cash MLGU Cash
A. Direct Cost
Material Cost: 161,791.00 133,950.00 295,741.00
Equipment:
Labor Cost:
a. Project Supervisor 18,900.00 18,900.00
b. Skilled Men 23,400.00 23,400.00
c. Skilled Women
d. Unskilled Men 20,375.00 20,375.00
e. Unskilled Women 12,625.00 12,625.00
Frieght and Handling: 12,380.00 12,380.00
Sub-Total A 249,471.00 - 133,950.00 - 383,421.00
B. Indirect Cost
Overhead Expenses
a. Administrative Supervision 9,375.00 9,375.00
b. Administrative Expenses 16,050.00 16,050.00
Contingencies 5,054.00 5,054.00
Miscellaneous Expenses
Contractors Profit
VAT Components
Other Necessary Indirect Cost
a. Bond Premium 3,375.00 3,375.00 6,750.00
b. Sub-Project Marker 13,375.00 13,375.00
Sub-Total B 31,179.00 - 3,375.00 16,050.00 - 50,604.00
-
TOTAL Estimated Cost 280,650.00 - 3,375.00 150,000.00 - 434,025.00
Land Cost
Grand Total 280,650.00 - 3,375.00 150,000.00 - 434,025.00
KALAHI-CIDSS NCDDP PMNP
Barangay VIEJO
Municipality PAGSANGHAN
Province SAMAR
Region VIII
PROGRAM OF WORKS
Equipment Needed:
280,650.00 - 3,375.00 150,000.00 - 434,025.00
- - - - - -
KALAHI-CIDSS NCDDP PMNP
Barangay VIEJO
Municipality PAGSANGHAN
Province SAMAR
Region VIII
PROGRAM OF WORKS
Equipment Needed:
Prepared by: Reviewed by:
ACT-Area Coordinator
Recommending Approval:
Noted by:
Sub-Total 5,480.00
Sub-Total -
No. of No. of Days
Labor Derivation Quantity Manpower
C Manpower to Complete
(Subsidiary Work Description) Required Capability
Assigned the Works
Fabrication and Installation 10.56 35.00 4.00 1.00
Crew: 1-carpenters, 2-laborers sq.m. sq.m./day crew
Sub-Total 1.00
Sub-Total
Sub-Total 2,050.00
Sub-Total 4,145.00
Sub-Total -
No. of No. of Days
Labor Derivation Quantity Manpower
C Manpower to Complete
(Subsidiary Work Description) Required Capability
Assigned the Works
Clearing and removal for existing structure 24.00 150.00 4.00 2.00
sq.m. sq./man-day
Sub-Total 2.00
Sub-Total
Sub-Total 4,400.00
Sub-Total 8,300.00
Sub-Total -
No. of No. of Days
Labor Derivation Quantity Manpower
C Manpower to Complete
(Subsidiary Work Description) Required Capability
Assigned the Works
Structure excavation (for chb laying) 0.32 1.50 4.00 2.00
cu.m. cu.m./man-day
Sub-Total 2.00
Sub-Total
Sub-Total 4,400.00
Sub-Total 37,000.00
Sub-Total -
No. of
Labor Derivation Quantity Manpower No. of Days to
C Manpower
(Subsidiary Work Description) Required Capability Complete
Assigned
Tamping floor slab and gravel bed 1.26 2.50 cu.m/m-day 2.00 1.00
Compacting of filling materials 1.26 2.00 cu.m/m-day 2.00 2.00
Sub-Total 3.00
Sub-Total 2,400.00
Sub-Total 6,600.00
Sub-Total 44,860.00
Sub-Total -
No. of No. of Days to
Labor Derivation Quantity Manpower
C Manpower Complete the
(Subsidiary Work Description) Required Capability
Assigned Works
Concrete Mixing and Pouring 35.00 bags 35.00 bags/crew/day 1.00 crew 2.00
1 crew = 2 Mason, 8 Laborer
Cutting and installation of RSB 7.00 kgs. 60.00 kgs./day 1.00 gang 2.00
1 gang = 1 steelman, 1 laborer
Sub-Total 4.00
Sub-Total -
Sub-Total 13,150.00
Sub-Total 135,520.00
Sub-Total -
No. of No. of Days to
Labor Derivation Quantity Manpower
C Manpower Complete the
(Subsidiary Work Description) Required Capability
Assigned Works
CHB Installation 180.00 150.00 2.00 2.00
1 crew: 2 masons & 4 laborers CHB/crew/day
Plastering 103.60 12.00 3.00 3.00
1 Crew : 2 Masons and 4 Laborers sq.m./crew/day (1 side only)
Tiles Works 48sq.m 12.00 3.00 3.00
1 Crew : 2 Masons and 2 Laborers sq.m/crew/day
Sub-Total 8.00
Sub-Total 5,480.00
Sub-Total 22,500.00
Sub-Total -
No. of No. of Days to
Labor Derivation Quantity Manpower
C Manpower Complete the
(Subsidiary Work Description) Required Capability
Assigned Works
Installation for Doors
1 crew : 1PS, 2 CARPENTERS AND 2 LABORER 3.36 1.00 4.00 2.00
Installation for Windows sq.m / crew/ day
1 crew : 1PS, 1 windows installer AND 2 LABORER 1.44 1.00 3.00 1.00
sq.m / crew/ day
Sub-Total 3.00
Sub-Total 4,500.00
Sub-Total 12,000.00
Sub-Total 11,665.00
Sub-Total -
No. of No. of Days to
Labor Derivation Quantity Manpower
C Manpower Complete the
(Subsidiary Work Description) Required Capability
Assigned Works
PAINTING 80.40 sq.m 35.00 sq.m./day 1.00 crew 3.00
Crew: 1 Project Supervisor, 1 Painter, 1 Laborer
Sub-Total 3.00
Sub-Total
Sub-Total 7,950.00
Sub-Total 26,271.00
Sub-Total -
No. of No. of Days
Labor Derivation Quantity Manpower
C Manpower to Complete
(Subsidiary Work Description) Required Capability
Assigned the Works
Fabrication and Installation 10.56 35.00 1.00 1.00
Crew: 1-carpenters, 2-laborers sq.m. sq.m./day crew
Sub-Total 1.00
Sub-Total
Sub-Total 2,050.00
OVERHEAD EXPENSES
a. Time Keeper / Bodegero 25.00 days 375.00 9,375.00
Sub- Total 9,375.00
b. Administrative Expenses
CVs Transportation Allowance 1.00 lot 5,000.00 5,000.00
CVs Meals Allowance 1.00 lot 3,000.00 3,000.00
Office Supply 1.00 lot 2,500.00 2,500.00
2'x4' Tarpaulin for BDC-TWG Structure 1.00 lot 750.00 750.00
CVs Insurance 1.00 lot 1,300.00 1,300.00
Photocopy 1.00 lot 2,000.00 2,000.00
Community Volunter Insurance 15.00 lot 100.00 1,500.00
Sub-Total 16,050.00
Sub-Total 13,375.00
Length = 4.00 m
Width = 1.00 m
depth= 0.15 m
Area = 0.60 cu.m
CEILINGS
Length= 8.00 m
Width= 6.00 m
Area= 48.00 sq.m
As a general rule, 1 litre of paint will cover between 6 and 6.5 metres squared of wall.
4 4 4 4 4 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1.964%
Spl 1 SP Signboard/Billboard 1 1.96% ₱ 7,530.00
1.114%
1.114%
100 Clearing and Removal of Existing Structure 2 2.23% ₱ 8,545.00
102 Excavation: (for chb 4") 2 3.31% ₱ 12,700.00
1.656%
1.656%
74.04%
201
3.999%
3.999%
3.999%
Embankment 3 12.00% ₱ 46,000.00
311
3.782%
3.782%
3.782%
3.782%
Portland Cement Concrete Pavement 4 15.13% ₱ 58,010.00
704.3 Masonry Works 8 42.69% ₱ 163,700.00
5.337%
5.337%
5.337%
5.337%
5.337%
5.337%
5.337%
5.337%
42.02%
404
3.391%
1.705% 3.391%
1.705% 3.391%
Doors and Windows 3 10.17% ₱ 39,000.00
405
1.705%
Painting Works 3 5.12% ₱ 19,615.00
18.89%
Spl 2
7.386%
Construction Safety and Health 1 7.39% ₱ 28,321.00
- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CERTIFICATION
THIS IS TO CERTIFY, that the proposed location of the sub-project of Brgy. Veijo,
Pagsanghan Samar of KALAHI CIDSS NCDDP - PMNP for Improvement of Day Care Center
requires manual handling of materials from point "A" to site location.
Reasons/s: The only way to get to the location of the sub-project from point "A" is to cross
a hanging bridge that is not passable by any vehicle. Manual handling of materials is required
during the actual sub-project implementation.
The following is the list of materials and cost of handling incurred during the preparation of
the technical documents, and cost estimate, and agreed upon during the community consultation
meeting.
Item
Item Description Quantity Unit Unit Cost
No.
1 # 16 Tie Wire - kg 5.00
2 10mmø X 6.0m, RSB G-40 26.00 pc 20.00
3 16mmø X 6.0m, RSB G-40 - #N/A #N/A
4 200 Liter Blue Plastic Drum 1.00 pc 100.00
5 2'x4' Tarpaulin for BDC-TWG Structure 1.00 lot -
6 2'x4' Tarpaulin for Warning Signs 2.00 lot 5.00
7 3/4" X 4' X 8' Marine Plywood 2.00 sheet 20.00
8 3/4" X 4' X 8' Phenolic Board 2.00 sheet 50.00
9 4' x 8' Tarpaulin for Project Signboard 1.00 pc 5.00
10 Aggregate Base Course Materials - cu.m. 300.00
11 Alcohol 1.00 gal 10.00
12 Asphalt Sealant in Bag-25kg - box 50.00
13 Blue Sack Sakoline - meter 2.00
14 Coco Lumber 2"X2"X10' 34.00 pc 30.00
15 Coco Lumber 2"X4"X10' - #N/A #N/A
16 Coco Lumber 2"X8"X10' - #N/A #N/A
17 Common Wire Nail 1 1/2" 3.00 kg 5.00
18 Common Wire Nail 2" 6.00 kg 5.00
19 Common Wire Nail 3" 9.00 kg 5.00
20 Common Wire Nail 4" 1.00 kg 5.00
21 Concrete Nail 2" - #N/A #N/A
22 Concrete Slump Test Set Equipment - set 100.00
23 Construction Hard Hat 15.00 pc 5.00
24 Crushed Gravel (3/4'') 8.50 cu.m. 300.00
25 Crow Bar 24" 1.00 pc 20.00
26 Face Mask 5.00 box 2.00
27 Flat Bar 1/4"x2"x6m - pc 40.00
28 Hacksaw Blade 3.00 pc 2.00
29 Hacksaw 1.00 pc 3.00
30 Heavy Duty Hand Gloves 52.00 pair 2.00
31 Nylon String 1.00 roll 5.00
32 Paint Brush 2" 2.00 pc 2.00
33 Plastic Container (20 liters) 4.00 pc 20.00
34 Portland Cement Type 1P 40 kgs 45.00 bag 20.00
35 QDE Paint - White Color 1.00 liter 15.00
36 Rubber Boots 15.00 pair 5.00
37 Washed Sand 4.50 cu.m. 300.00
38 Bolo Knife - #N/A #N/A
39 Empty Sack (Rice Sack 50 kg) - #N/A #N/A
40 Wheelbarrow (Heavy Duty) 72L capacity 1.00 pc 100.00
41 Trench Shovel 2.00 pc 20.00
42 Flat Shovel - pc 20.00
43 Square Mouth Shovel 6.00 pc 20.00
44 Steel tube Pipe 40mmX3.2mmX3.0m - pc 20.00
45 Sub-Project Marker 1.00 set -
46 Steel Filing 3 layers Cabinet - set -
The certification is issued to KALAHI CIDSS NCDDP - AF of Phase 2 for what legal purposes it
may serve. Issued this ___ of September 2023 in Brgy. Engr609, Koan, Samar.
_____________________ ____________________
PIT BDC-TWG
Noted by:
______________________ __________________________
ACT – Technical Facilitator Municipal Engineer
_________________________ __________________________
Area Coordinator Brgy. Chairperson
KALAHI- CIDSS NCDDP Additional Financing
MANPOWER SCHEDULE
No. of Laborers
WEEK
Req'd Programed
Item No. Work Item / Activity Name Position
Man - Days 5 6 7 8 9 10
Male Female
M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S
Overall Supervision Project Supervisor 1.00 25.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Timekeeper/Bodegera Unskilled Laborer 1.00 25.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
100 Clearing and Removal of Existing Structure Unskilled Laborer 2.00 2.00 2.00 1 1 1
102 Excavation: (for chb 4") Unskilled Laborer 2.00 2.00 2.00 1 1 1 1 1
201 Embankment
EQUIPMENT SCHEDULE
Name of Proposed Subproject: Rehabilitation of existing Day Care Center
Location: Brgy.Viejo,Pagsanghan,Samar
Brgy.
0 2.7 0
0 32.4 0
CBPM 2021 Form A-3 Emergency Community Procurement Plan
Package 2 : (Steel Filing 3 layers Cabinet) Supplier 1: Store Name, Brgy/Street Name, Payment for
Municipality/City
Community Supplier 2: Store Name, Brgy/Street this package is
Steel Filing 3 layers Cabinet - set 15,000.00 - Shopping for October 2023 charge to First
Goods Name, Municipality/City Tranche of CDD
Supplier 3: Store Name, GRANT
Sub-Total for Package 2 = - Brgy/Street Name, Municipality/City
Package 3 : (Slump Test Set Appartus) Supplier 1: Store Name, Brgy/Street Name,
Municipality/City Payment for
Community Supplier 2: Store Name, Brgy/Street this package is
Concrete Slump Test Set Equipment - set 10,000.00 - Shopping for October 2023 Name, Municipality/City charge to First
Goods Supplier 3: Store Name, Tranche of CDD
Sub-Total for Package 3 = - Brgy/Street Name, Municipality/City GRANT
Package 4 : (Sub-Project Marker) Supplier 1: Store Name, Brgy/Street Name, Payment for
Community Municipality/City this package is
Sub-Project Marker 1.00 Shopping for Supplier 2: Store Name, Brgy/Street
October 2023 Name, charge to First
set 5,000.00 5,000.00
Goods Municipality/City Tranche of CDD
Supplier 3: Store Name, GRANT
Sub-Total for Package 4 = 5,000.00 Brgy/Street Name, Municipality/City
Package 5 : (Construction Materials for the Sub-
Project)
# 16 Tie Wire - kg 200.00 -
10mmø X 6.0m, RSB G-40 26.00 pc 265.00 6,890.00
16mmø X 6.0m, RSB G-40 - #N/A #N/A #N/A
200 Liter Blue Plastic Drum 1.00 pc 1,900.00 1,900.00
3/4" X 4' X 8' Marine Plywood 2.00 sheet 1,700.00 3,400.00
3/4" X 4' X 8' Phenolic Board 2.00 sheet 1,950.00 3,900.00
Aggregate Base Course Materials - cu.m. 1,950.00 -
Alcohol 1.00 gal 431.00 431.00
Asphalt Sealant in Bag-25kg - box 3,000.00 -
Blue Sack Sakoline - meter 180.00 -
Bolo Knife - #N/A #N/A #N/A
Coco Lumber 2"X2"X10' 34.00 pc 180.00 6,120.00
Coco Lumber 2"X4"X10' - #N/A #N/A #N/A
Coco Lumber 2"X8"X10' - #N/A #N/A #N/A
Common Wire Nail 1 1/2" 3.00 kg 90.00 270.00
Common Wire Nail 2" 6.00 kg 90.00 540.00
Common Wire Nail 3" 9.00 kg 90.00 810.00
Common Wire Nail 4" 1.00 kg 90.00 90.00 Supplier 1: Store Name, Brgy/Street Name, Payment for
Municipality/City this package is
Concrete Nail 2" - #N/A #N/A #N/A Community charge to First
Construction Hard Hat 15.00 pc 300.00 4,500.00 Shopping for Supplier 2: Store Name, Brgy/Street
October 2023 Name, Tranche of CDD
Goods Municipality/City GRANT and LCC
Crow Bar 24" 1.00 pc 750.00 750.00 Supplier 3: Store Name,
Crushed Gravel (3/4'') 8.50 cu.m. 2,750.00 23,375.00 Brgy/Street Name, Municipality/City of the MLGU
and BLGU
Empty Sack (Rice Sack 50 kg) - #N/A #N/A #N/A
Face Mask 5.00 box 80.00 400.00
Flat Bar 1/4"x2"x6m - pc 850.00 -
Flat Shovel - pc 400.00 -
Hacksaw 1.00 pc 300.00 300.00
Hacksaw Blade 3.00 pc 65.00 195.00
Heavy Duty Hand Gloves 52.00 pair 150.00 7,800.00
Nylon String 1.00 roll 220.00 220.00
Paint Brush 2" 2.00 pc 80.00 160.00
Plastic Container (20 liters) 4.00 pc 320.00 1,280.00
Portland Cement Type 1P 40 kgs 45.00 bag 320.00 14,400.00
QDE Paint - White Color 1.00 liter 250.00 250.00
Rubber Boots 15.00 pair 600.00 9,000.00
Square Mouth Shovel 6.00 pc 450.00 2,700.00
Steel tube Pipe 40mmX3.2mmX3.0m - pc 600.00 -
Trench Shovel 2.00 pc 450.00 900.00
Washed Sand 4.50 cu.m. 1,800.00 8,100.00
Wheelbarrow (Heavy Duty) 72L capacity 1.00 pc 4,000.00 4,000.00
Sub-Total for Package 5 = #N/A
A. Direct Cost:
Equipment - - - -
B. Indirect Cost:
Administrative
9,375.00 9,375.00 - -
Supervision
Administrative
16,050.00 - 16,050.00 -
Expenses
NOTE: The outputs are up to a maximum disposal site distance of 10.00 meters.
STRUCTURAL EXCAVATION
Common Excavation 1.50 cu./manday
Loose Rock 0.50 cu./manday
Hard Rock 0.30 cu.m/manday
Spreading & Compaction of selected Filling & Gravel Bedding 4.30 cu.m/manday
Soil Poisoning 300.00 sq.m/manday
EMBANKMENT
a.Placing
Common Excavation 4.00 cu./manday
Hard Rock 2.50 cu./manday
STRUCTURAL CONCRETE
Crew: 2 Masons; 8 Laborers; 1 Project Supervisor 35.00 bags/crew/day
SCAFFOLDINGS
Crew: 1 Project Supervisor, 2 Carpenters, 4 Laborers
Fabrication and Installation 35.00 sq.m/crew/day
Stripping 60.00 sq.m/crew/day
FORMWORKS
Crew: 1 Project Supervisor, 2 Carpenters, 4 Laborers
Fabrication and Installation 35.00 sq.m/crew/day
Stripping 60.00 sq.m/crew/day
CARPENTRY
Crew of 1 Foreman, 2 Carpenters and 1 Helper
a. Roof Framing ( 1 storey building) 10.00 sq.m./crew/day
b. Ceiling 15.00 sq.m./crew/day
c. Partition
c.1 Movable 3.50 sq.m./crew/day
c.2 Fixed 7.00 sq.m./crew/day
d. Exterior Walls 58.00 sq.m./crew/day
e.Metal Furring and Panel Board Installation 11.52 per crew / day
(1 Skilled & 2 Helper)
MASONRY WORKS
a. CHB Installation 230.00 CHB/crew/day
Crew of 2 Masons and 3 Laborers
b. Plastering 12.00 sq.m./crew/day (1 side only)
Crew of 2 Masons and 2 Laborers
STONE MASONRY
Crew: 1 Project Supervisor, 2 Masons, 10 Laborers 6.00 cu.m/crew/day
GROUTED RIPRAP
Crew: 1 Project Supervisor, 2 Masons, 10 Laborers 7.50 cu.m./crew/day
PAINTING
Crew: 1 Project Supervisor, 1 Painter, 1 Laborer
Paint Roller 125 sq.m./crew/day
Paint Brush 50 sq.m./crew/day
STEEL WORKS
Crew: 1 Project Supervisor, 1 Welder, 3 Laborers
Truss fabrication and installation 35 sq.m./crew/day
Railings fabrication & installation 20 ln.m./crew/day
EQUIPMENT CAPABILITY OUTPUT
b. Solid Rock
1 Unit Air compressor with jackhammer/day
based on perpendicular boring at a maximum
height of
Common Earth 150.00 meters
Loose Rock 100.00 boreholes
STRUCTURAL EXCAVATION
0.225 cu.m Backhoe 120.00 cu.m/day ( commom earth)
Jackhammer 20.00 ft./hr ( loose rock)
8.00 ft./hr ( hard rock)
EMBANKMENT
Placing - one unit road grader, cu.m./day 500.00 cu.m./day (common excavation)
Compaction
Portable plate compactor 50.00 cu.m./day (common excavation)
1 Tonner Road Roller 100.00 cu.m./day (common excavation)
9 – 11 Tonner Road Roller 300.00 cu.m./day (common excavation)
Water Truck 8,000.00 sq.m./day (common excavation)
SUB-GRADE PREPARATION
b. 6" CHB
Materials Factor
Cement 4.2
Coarse Sand 0.35
Boulders 1
Materials Factor
Cement 4.5
Coarse Sand 0.23
Boulders 0.75
Materials Factor
Cement 9
Coarse Sand 0.5
3/4 Gravel 0.8
TECHNICAL FACILITATOR'S INDIVIDUAL WORK PLAN
F.Y. 2023
Name : engr609
Municipality : Koan, Samar
Area of Responsible
Concern Deliverables Activities Task Start End Person
1. Procurement
Training/ Actual
Procurement 1.1. Act as Resource Person and Facilitator during
Procurement Training in 21 barangays and teach the
1.1. Accomplished Procurement
1.1. Procurement Training CVs and teach the CVs in accomplishing Procurement 11/14/2022 12/14/2022 TF, AC AND CEF
Forms by the Partcipants
Forms and Community-Based Procurement
Processes.
2.2. Pre-Construction 2.2. Pre-Construction 2.2.4. Discuss the BDC-TWG Rules, Regulations, and CVs, WORKERS,
2/14/2023 2/14/2023
Conference Minutes Conference Norms in Sub-Project Implementation. BLGU, A/MCT
2.3.2. Ensure that the MIT recorded all the in & out of
construction materials.
2.3.5. Assist in monitoring the plan versus actual daily MIT, PIT, PT, AIT,
2.3. Monitoring of the Sub- physical and financial accomplishment using the BDC-TWG
4/11/2023 5/5/2023
Project Implemenatation WSPPR. CHAIRMAN,
BLGU, A/MCT
3. Downloading of
Funds (2nd 3.1.1. Ensure that JIR is accomplished before the
Tranche) request also the material testing is done.
3.1. Preparation of
Documents for Request 3.1.2. Make a Comparative Matrix in each SP.
3.1. RFR (2nd Tranche) 5/1/2023 5/5/2023 TF, MFA AND AC
for Download of 2nd
Tranche
3.1.3. Make a Certificate of Cost to Complete based
on the Comparative Matrix, WSPPR, Updated ESMP,
and Geotagged Photos.
4. Operation and 4.1.1. Formation of O&M 4.1.1. Discuss to the O&M Group their Roles &
Maintenance BDC-TWG
Group Functions.
Training / O&M CHAIRMAN, O&M
Planning 4.1. O&M Action Plan 4/24/2023 4/28.2023
GROUP, BLGU,
4.1.2. Give insights on how to maintain the Sub-
4.1.2. O&M Training A/MCT
Projects according to their types.
5. Final Inspection 5.1. Final Inspection Report
5.1.1. Invite the RPMO Rep., ME, AC, CEF, Brgy.
Cap., MIAC Rep, CVs, for Joint Inspection if the
Physical Accomplishment is at 100%.
BDC-TWG
5.1. Conduct Final CHAIRMAN, PIT,
Inspection after confirming BLGU REP.,
5/25/2023 5/25/2023
the 100% completion of 5.1.2. Ensure compliance with issues and MIAC REP.,
SP concerns/recommendations written in FIR. RPMO REP., AC,
TF AND CEF
Spl 1 Sub-Project Signboard 7,530.00 2.32% 7,530.00 2.32% 100.00% 1.00 1.00
100 Clearing and Grubbing 8,545.00 2.63% 197,603.13 60.84% 2312.50% 555.00 24.00
Excavation: (Roadway
102 12,700.00 3.91% ### 1695.36% ### 138.75 0.32
Excavation)
201 Aggregate Base Course 46,000.00 14.16% ### 623.82% 4404.76% 55.50 1.26
Spl 2 Construction Safety and 28,321.00 8.72% 28,321.00 8.72% 100.00% 1.00 1.00
Health
Note:
Unit
DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 % DAY 7 DAY 8 DAY 9 DAY 10 DAY 11
1.00
lot
2.32% 2.32%
200.00 200.00 155.00
sq.m.
21.92% 21.92% 16.99% 60.84%
20.00 20.00 20.00 20.00 20.00 38.75
cu.m.
### ### ### ### ### ### ###
10.00
cu.m.
###
cu.m
sq.m.
1.00
lot
8.72% 8.72%
###
k2 Week 3 Week 4
DAY 12 % DAY 13 DAY 14 DAY 15 DAY 16 DAY 17 DAY 18 % DAY 19 DAY 20 DAY 21 DAY 22
###
10.00 10.00 25.50
### ### ### ### ###
26.00
###
7.00 7.00 7.00 7.00 7.00 7.00 13.50
31.50% 31.50% 31.50% 31.50% ### 31.50% 31.50% 60.75%
### ###
Week 4 Week 5 Week 6
DAY 23 DAY 24 % DAY 25 DAY 26 DAY 27 DAY 28 DAY 29 DAY 30 % DAY 31 DAY 32 DAY 33
26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00
### ### ### ### ### ### ### ### ### ### ### ### ###
###
### ###
Week 6 Week 7
26.00
### ###
### 0.00%
CBIM 2021 Form B-3
Barangay Sub-project Work Schedule Physical Progress Report
Physical Target : 48.00 s### Total SP Cost : 434,025.00 Date Started : August 8, 2023 PROJECT SUPERVISOR 700.00
Region : VIII Direct cost : 383,421.00 Duration : 58 WD (inc. proc.) Male 600.00
SKILLED
Province : Samar Indirect Cost : 50,604.00 No. of Suspension : Female 600.00
Municipality : Pagsanghan Contingency Cost : 5,054.00 Target Completion Date : October 2, 2023 Male 375.00
UNSKILLED
Barangay : Viejo Mode of Implementation : CFA Revised Completion Date : Female 375.00
I. SCOPE OF WORK TO BE DONE
ACTUAL SUB-PROJECT IMPLEMENTATION (DURATION)
WEIGHT
Previous Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
Physical Actual
ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT Target Accomp. Aug. 7-12, 2023 Aug. 14-19, 2022 Aug. 21-26, 2022 Aug. 28-Sep. 2, 2023 Sep. 4-9, 2023 Sep. 11-16, 2023
(%)
M T W THF S % M T W THF S % M T W THF S % M T W THF S % M T W THF S % M T W THF S %
Planned
1.96%
1.96%
Sub-Project
Spl 1 Signboard 1.00 lot 7,530.00 2.32%
Actual
2.32%
2.32%
Clearing and
16.99% Err:509
Planned
1.11%
1.11%
Err:509
100 Removal of 24.00 sq.m. 8,545.00 2.63%
21.92%
21.92%
Existing Structure Actual 60.84%
244.38% Err:509
244.38% Err:509
244.38% Err:509
Planned Err:509 Err:509
244.38% Err:509
244.38% Err:509
Excavation: (for
102 chb 4") 0.32 cu.m. 12,700.00 3.91%
473.48%
Actual 488.75% 1206.61%
112.40% Err:509
112.40% Err:509
Planned Err:509
201 Embankment 1.26 cu.m. 46,000.00 14.16%
112.40%
286.62%
Actual 224.80% 399.02%
Portland Cement
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
773.93% Err:509
Err:509
Planned Err:509 Err:509 Err:509
311 Concrete 0.60 cu.m 58,010.00 17.86%
Pavement Actual 2321.79% 4643.57% 3095.71%
31.50% Err:509
31.50% Err:509
31.50% Err:509
31.50% Err:509
31.50% Err:509
31.50% Err:509
60.75% Err:509
Planned Err:509 Err:509
704.3 Masonry Works 11.20 sq.m. 163,700.00 50.40%
Actual 126.00% 123.75%
Planned
7.39%
7.39%
Construction
Spl 2 Safety and Health 1.00 lot 28,321.00 8.72%
Actual
8.72%
8.72%
II.
PERIODIC Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
PLANNED PHYSICAL PROGRESS (%)
PHYSICAL
Page 37 of 41
CBIM 2021 Form B-3
Barangay Sub-project Work Schedule Physical Progress Report
Nagkamay-ada hin kawarayan hin tubig han ika tulo ka semna tungod nga
Paghingayad hin Suspension Report han adlaw nga waray trabaho tungod sa wara tubig nga
nawarayan hin koneksyon tikang sa source, rason nga nag hinay an trabaho magagamit, ngan mangita hin mag aayus sa koneskyon sa tubig bulig han locaal nga officials
ngan pag buhos
Page 38 of 41
CBIM 2021 Form B-9
Joint Inspection Report
Cost Sharing:
CDD Project/Program : CDD Project/Program :
Community : Community :
Barangay Unit : Barangay Unit :
Municipal/Others : Municipal/Others :
FINDINGS:
Spl 1 Sub-Project Signboard 1.00 lot 7,530.00 7,530.00 2.32% 1.00 lot 7,530.00 2.32% - -
100 Clearing and Removal of 24.00 sq.m. 356.04 8,545.00 2.63% 555.00 sq.m. 197,603.13 60.84% (531.00) (189,058.13)
Existing Structure
102 Excavation: (for chb 4") 0.32 cu.m. 39,687.50 12,700.00 3.91% 138.75 cu.m. ### 1695.36% (138.43) (5,493,940.63)
201 Embankment 1.26 cu.m. 36,507.94 46,000.00 14.16% 55.50 cu.m. ### 623.82% (54.24) (1,980,190.48)
311 Portland Cement Concrete 0.60 cu.m 96,683.33 58,010.00 17.86% 338.00 cu.m ### 10061.07% (337.40) (32,620,956.67)
Pavement
704.3 Masonry Works 11.20 sq.m. 14,616.07 163,700.00 50.40% 55.50 sq.m. 811,191.96 249.75% (44.30) (647,491.96)
During the site inspection, together represented with other stakeholders from Brgys and LGU of Koan, agreed
with a conclusion on the outcome of the sub-project found accepted on the workmanship made by the Pakyaw
Laborer. All the scope of work is based on the approved plan and specification accomplished by the workers.
The sub-project has good workmanship and is acceptable in accordance with the approved plans and standards.
V. FINANCIAL:
Releases Disbursed
Grant:
MLCC:
Page 39 of 41
CBIM 2021 Form B-9
Joint Inspection Report
a. Environment:
1. Mayda mga kodal nga maruruba
2. Pagkamay-ada hin basura nga nagkakalat
b. Others:
c. Environment:
3. Mayda mga koan na ginhimo.
4. Pagkamay-ada hin koan para diri magkalat
d. Others:
INSPECTORATE TEAM:
(Barangay Chairperson)
Date of Inspection:
Triggers to conduct Joint Inspection for sub-projects: When the sub-project accomplished almost 90% physical accomplishment (Particularly for Community Force Account Mode), the
Technical Facilitator should advise the BDC-TWG to request for the Joint Inspection Team (JIT). In cases where in a particular municipality, more sub-projects reach the triggers, schedules of
the JIT should be coordinated by the ACT with the communities.
Page 40 of 41
Updated
Approved Brgy. Certificate of Sub-
Copy of Site Approved Final Environmental Geotagged Geotagged Geotagged Copy of Sub-Project Notarized Operation Resolution Project
Variation As-Built and Social Sub-Project Mutual and Functionality Closing of Booking of
Municipality Barangay Program of Validation Inspection Photos: Photos: On- Photos: Completion allocation Completion and
Work Report Order (if Plan Report Safeguard Proposed going Completed Concept Report Form Partnership Maintenanc fund for the Audit Report Acceptance/ Turn Accounts Assets
applicable) Management Forms Agreement e Program
(POW) O&M Over Certificate
Plan