Professional Documents
Culture Documents
No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 614.3448524 812.2543865 476.6823598 467.1893456 124.1678592 39.39414708 8.442872072 39.15505259 0 354.5380841 410.8815446 296.930225215
2 Hari Hujan ( n ) 20 26 25 24 10 3 1 2 2 12 20 10
3 Jumlah Hari 1/2 Bulan Pertama (hari) 15 15 15 15 15 15 15 15 15 15 15 15
4 Jumlah Hari 1/2 Bulan Kedua (hari) 16 14 15 15 16 15 16 16 15 16 15 16
5 Kecepatan Angin (U) 2.17 2.00 1.83 1.85 2.35 3.12 3.79 4.09 3.64 2.80 2.05 2.06
6 Suhu (T) 24.55 24.32 24.28 24.54 24.86 24.57 24.34 24.62 25.59 26.31 25.64 24.71
7 Kelembapan Udara (RH) 86.82 89.66 89.76 88.28 83.34 79.45 75.65 71.50 70.97 73.00 81.39 85.62
8 Penyinaran Matahari (n/N) 46.32 41.27 47.39 52.01 60.87 66.63 71.88 73.72 62.37 51.93 43.63 43.11
9 Tekanan Udara (P) 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.54 99.54 99.54 99.53
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
10 Eto (mm/hr) 2.32 3.40 3.63 3.71 3.91 4.07 4.47 5.03 5.02 4.58 3.74 3.44
11 Etm (mm/bln) = Hr x Eto 46.47 88.43 90.79 88.95 39.05 12.21 4.47 10.06 10.04 55.00 74.82 34.37
C LIMITED EVAPOTRANSPIRASI (mm/bln)
12 Exposed Surface (m ; %) 35 35 35 35 35 35 35 35 35 35 35 35
13 n (jumlah hari hujan) 20 26 25 24 10 3 1 2 2 12 20 10
14 DE/Epm = ( m/20) (18-n) : (%) -3.50 -14.00 -12.25 -10.50 14.00 26.25 29.75 28.00 28.00 10.50 -3.50 14.00
15 DE (mm/bln) Row 15 x 11 -1.63 -12.38 -11.12 -9.34 5.47 3.20 1.33 2.82 2.81 5.77 -2.62 4.81
16 E actual (mm/bln) = Epm - DE Row 15 - 11 48.10 100.81 101.91 98.29 33.58 9.00 3.14 7.24 7.23 49.22 77.44 29.56
D WATER SURPLUS (mm/bulan)
17 P - Ea ; (mm/bulan) Row 1 - 16 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 -7.23 305.32 333.45 267.37
18 SMS = ISMS + (P - Ea) ; (mm/bulan) Raw 17 x 19 766.24 911.45 574.77 568.90 290.58 230.39 205.30 231.91 192.77 505.32 533.45 467.37
19 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
20 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.23 0.00 0.00 0.00
21 Water Surplus (mm/bulan) = (P - Ea) + SS Row 17 + 20 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 0.00 305.32 333.45 267.37
E TOTAL RUN OFF (mm/bulan)
22 Koefisien Infiltrasi ( if ) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
23 Infiltrasi ( i ) = Ws x if ; (mm/bln) Row 22 x 21 113.25 142.29 74.95 73.78 18.12 6.08 1.06 6.38 0.00 61.06 66.69 53.47
24 Konstanta Resesi Aliran ( K ) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
25 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
26 (0.5 x (1 + K) x i ) 109.29 137.31 72.33 71.20 17.48 5.87 1.02 6.16 0.00 58.93 64.36 51.60
27 K x (Gsom) Row 24 x 28 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91
28 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 270.20 298.22 233.24 232.11 178.40 166.78 161.94 167.07 160.91 219.84 225.27 212.52
29 DGS (mm/bln) = GS - Gsom 97.17 125.20 60.22 59.09 5.37 -6.25 -11.09 -5.95 -12.11 46.81 52.24 39.49
30 Base Flow (mm/bln) = i - DGS Row 23 - 29 16.08 17.09 14.74 14.69 12.75 12.32 12.15 12.34 12.11 14.25 14.45 13.98
31 Direct Run Off (mm/bln) = Ws - i Row 21 - 23 550.17 694.36 360.04 354.21 77.84 18.07 -6.85 19.58 -12.11 291.07 319.00 253.39
32 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 12.41678592 3.939414708 0.844287207 3.915505259 0 0 0 0
33 Total Run Off (mm/bln) = Bflow + DRO + SRO Row 30 + 31 + 32 566.24 711.45 374.77 368.90 103.00 34.33 6.15 35.83 0.00 305.32 333.45 267.37
34 Luas Tangkapan Hujan (km²) 48.5 0.262611155 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5
35 Stream Flow 1/2 Bulan Pertama (m³/dt) Konversi 21.19 0.14 14.03 13.81 3.85 1.28 0.23 1.34 0.00 11.43 12.48 10.01
DEBIT ANDALAN - TAHUN 2000
No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 614.3448524 812.2543865 476.6823598 467.1893456 124.1678592 39.39414708 8.442872072 39.15505259 0 354.5380841 410.8815446 296.930225215
2 Hari Hujan ( n ) 20 26 25 24 10 3 1 2 2 12 20 10
3 Jumlah Hari 1/2 Bulan Pertama (hari) 15 15 15 15 15 15 15 15 15 15 15 15
4 Jumlah Hari 1/2 Bulan Kedua (hari) 16 14 15 15 16 15 16 16 15 16 15 16
5 Kecepatan Angin (U) 2.17 2.00 1.83 1.85 2.35 3.12 3.79 4.09 3.64 2.80 2.05 2.06
6 Suhu (T) 24.55 24.32 24.28 24.54 24.86 24.57 24.34 24.62 25.59 26.31 25.64 24.71
7 Kelembapan Udara (RH) 86.82 89.66 89.76 88.28 83.34 79.45 75.65 71.50 70.97 73.00 81.39 85.62
8 Penyinaran Matahari (n/N) 46.32 41.27 47.39 52.01 60.87 66.63 71.88 73.72 62.37 51.93 43.63 43.11
9 Tekanan Udara (P) 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.54 99.54 99.54 99.53
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
10 Eto (mm/hr) 2.32 3.40 3.63 3.71 3.91 4.07 4.47 5.03 5.02 4.58 3.74 3.44
11 Etm (mm/bln) = Hr x Eto 46.47 88.43 90.79 88.95 39.05 12.21 4.47 10.06 10.04 55.00 74.82 34.37
C LIMITED EVAPOTRANSPIRASI (mm/bln)
12 Exposed Surface (m ; %) 35 35 35 35 35 35 35 35 35 35 35 35
13 n (jumlah hari hujan) 20 26 25 24 10 3 1 2 2 12 20 10
14 DE/Epm = ( m/20) (18-n) : (%) -3.50 -14.00 -12.25 -10.50 14.00 26.25 29.75 28.00 28.00 10.50 -3.50 14.00
15 DE (mm/bln) Row 15 x 11 -1.63 -12.38 -11.12 -9.34 5.47 3.20 1.33 2.82 2.81 5.77 -2.62 4.81
16 E actual (mm/bln) = Epm - DE Row 15 - 11 48.10 100.81 101.91 98.29 33.58 9.00 3.14 7.24 7.23 49.22 77.44 29.56
D WATER SURPLUS (mm/bulan)
17 P - Ea ; (mm/bulan) Row 1 - 16 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 -7.23 305.32 333.45 267.37
18 SMS = ISMS + (P - Ea) ; (mm/bulan) Raw 17 x 19 766.24 911.45 574.77 568.90 290.58 230.39 205.30 231.91 192.77 505.32 533.45 467.37
19 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
20 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.23 0.00 0.00 0.00
21 Water Surplus (mm/bulan) = (P - Ea) + SS Row 17 + 20 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 0.00 305.32 333.45 267.37
E TOTAL RUN OFF (mm/bulan)
22 Koefisien Infiltrasi ( if ) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
23 Infiltrasi ( i ) = Ws x if ; (mm/bln) Row 22 x 21 113.25 142.29 74.95 73.78 18.12 6.08 1.06 6.38 0.00 61.06 66.69 53.47
24 Konstanta Resesi Aliran ( K ) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
25 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
26 (0.5 x (1 + K) x i ) 109.29 137.31 72.33 71.20 17.48 5.87 1.02 6.16 0.00 58.93 64.36 51.60
27 K x (Gsom) Row 24 x 28 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91
28 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 270.20 298.22 233.24 232.11 178.40 166.78 161.94 167.07 160.91 219.84 225.27 212.52
29 DGS (mm/bln) = GS - Gsom 97.17 125.20 60.22 59.09 5.37 -6.25 -11.09 -5.95 -12.11 46.81 52.24 39.49
30 Base Flow (mm/bln) = i - DGS Row 23 - 29 16.08 17.09 14.74 14.69 12.75 12.32 12.15 12.34 12.11 14.25 14.45 13.98
31 Direct Run Off (mm/bln) = Ws - i Row 21 - 23 550.17 694.36 360.04 354.21 77.84 18.07 -6.85 19.58 -12.11 291.07 319.00 253.39
32 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 12.41678592 3.939414708 0.844287207 3.915505259 0 0 0 0
33 Total Run Off (mm/bln) = Bflow + DRO + SRO Row 30 + 31 + 32 566.24 711.45 374.77 368.90 103.00 34.33 6.15 35.83 0.00 305.32 333.45 267.37
34 Luas Tangkapan Hujan (km²) 48.5 46.28990541 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5
35 Stream Flow 1/2 Bulan Pertama (m³/dt) Konversi 21.19 25.41 14.03 13.81 3.85 1.28 0.23 1.34 0.00 11.43 12.48 10.01
DEBIT ANDALAN - TAHUN 2000
No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 614.3448524 812.2543865 476.6823598 467.1893456 124.1678592 39.39414708 8.442872072 39.15505259 0 354.5380841 410.8815446 296.930225215
2 Hari Hujan ( n ) 20 26 25 24 10 3 1 2 2 12 20 10
3 Jumlah Hari 1/2 Bulan Pertama (hari) 15 15 15 15 15 15 15 15 15 15 15 15
4 Jumlah Hari 1/2 Bulan Kedua (hari) 16 14 15 15 16 15 16 16 15 16 15 16
5 Kecepatan Angin (U) 2.17 2.00 1.83 1.85 2.35 3.12 3.79 4.09 3.64 2.80 2.05 2.06
6 Suhu (T) 24.55 24.32 24.28 24.54 24.86 24.57 24.34 24.62 25.59 26.31 25.64 24.71
7 Kelembapan Udara (RH) 86.82 89.66 89.76 88.28 83.34 79.45 75.65 71.50 70.97 73.00 81.39 85.62
8 Penyinaran Matahari (n/N) 46.32 41.27 47.39 52.01 60.87 66.63 71.88 73.72 62.37 51.93 43.63 43.11
9 Tekanan Udara (P) 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.54 99.54 99.54 99.53
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
10 Eto (mm/hr) 2.32 3.40 3.63 3.71 3.91 4.07 4.47 5.03 5.02 4.58 3.74 3.44
11 Etm (mm/bln) = Hr x Eto 46.47 88.43 90.79 88.95 39.05 12.21 4.47 10.06 10.04 55.00 74.82 34.37
C LIMITED EVAPOTRANSPIRASI (mm/bln)
12 Exposed Surface (m ; %) 35 35 35 35 35 35 35 35 35 35 35 35
13 n (jumlah hari hujan) 20 26 25 24 10 3 1 2 2 12 20 10
14 DE/Epm = ( m/20) (18-n) : (%) -3.50 -14.00 -12.25 -10.50 14.00 26.25 29.75 28.00 28.00 10.50 -3.50 14.00
15 DE (mm/bln) Row 15 x 11 -1.63 -12.38 -11.12 -9.34 5.47 3.20 1.33 2.82 2.81 5.77 -2.62 4.81
16 E actual (mm/bln) = Epm - DE Row 15 - 11 48.10 100.81 101.91 98.29 33.58 9.00 3.14 7.24 7.23 49.22 77.44 29.56
D WATER SURPLUS (mm/bulan)
17 P - Ea ; (mm/bulan) Row 1 - 16 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 -7.23 305.32 333.45 267.37
18 SMS = ISMS + (P - Ea) ; (mm/bulan) Raw 17 x 19 766.24 911.45 574.77 568.90 290.58 230.39 205.30 231.91 192.77 505.32 533.45 467.37
19 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
20 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.23 0.00 0.00 0.00
21 Water Surplus (mm/bulan) = (P - Ea) + SS Row 17 + 20 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 0.00 305.32 333.45 267.37
E TOTAL RUN OFF (mm/bulan)
22 Koefisien Infiltrasi ( if ) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
23 Infiltrasi ( i ) = Ws x if ; (mm/bln) Row 22 x 21 113.25 142.29 74.95 73.78 18.12 6.08 1.06 6.38 0.00 61.06 66.69 53.47
24 Konstanta Resesi Aliran ( K ) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
25 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
26 (0.5 x (1 + K) x i ) 109.29 137.31 72.33 71.20 17.48 5.87 1.02 6.16 0.00 58.93 64.36 51.60
27 K x (Gsom) Row 24 x 28 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91
28 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 270.20 298.22 233.24 232.11 178.40 166.78 161.94 167.07 160.91 219.84 225.27 212.52
29 DGS (mm/bln) = GS - Gsom 97.17 125.20 60.22 59.09 5.37 -6.25 -11.09 -5.95 -12.11 46.81 52.24 39.49
30 Base Flow (mm/bln) = i - DGS Row 23 - 29 16.08 17.09 14.74 14.69 12.75 12.32 12.15 12.34 12.11 14.25 14.45 13.98
31 Direct Run Off (mm/bln) = Ws - i Row 21 - 23 550.17 694.36 360.04 354.21 77.84 18.07 -6.85 19.58 -12.11 291.07 319.00 253.39
32 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 12.41678592 3.939414708 0.844287207 3.915505259 0 0 0 0
33 Total Run Off (mm/bln) = Bflow + DRO + SRO Row 30 + 31 + 32 566.24 711.45 374.77 368.90 103.00 34.33 6.15 35.83 0.00 305.32 333.45 267.37
34 Luas Tangkapan Hujan (km²) 48.5 0.584895013 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5
35 Stream Flow 1/2 Bulan Pertama (m³/dt) Konversi 21.19 0.32 14.03 13.81 3.85 1.28 0.23 1.34 0.00 11.43 12.48 10.01
DEBIT ANDALAN - TAHUN 2000
No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 614.3448524 812.2543865 476.6823598 467.1893456 124.1678592 39.39414708 8.442872072 39.15505259 0 354.5380841 410.8815446 296.930225215
2 Hari Hujan ( n ) 20 26 25 24 10 3 1 2 2 12 20 10
3 Jumlah Hari 1/2 Bulan Pertama (hari) 15 15 15 15 15 15 15 15 15 15 15 15
4 Jumlah Hari 1/2 Bulan Kedua (hari) 16 14 15 15 16 15 16 16 15 16 15 16
5 Kecepatan Angin (U) 2.17 2.00 1.83 1.85 2.35 3.12 3.79 4.09 3.64 2.80 2.05 2.06
6 Suhu (T) 24.55 24.32 24.28 24.54 24.86 24.57 24.34 24.62 25.59 26.31 25.64 24.71
7 Kelembapan Udara (RH) 86.82 89.66 89.76 88.28 83.34 79.45 75.65 71.50 70.97 73.00 81.39 85.62
8 Penyinaran Matahari (n/N) 46.32 41.27 47.39 52.01 60.87 66.63 71.88 73.72 62.37 51.93 43.63 43.11
9 Tekanan Udara (P) 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.53 99.54 99.54 99.54 99.53
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
10 Eto (mm/hr) 2.32 3.40 3.63 3.71 3.91 4.07 4.47 5.03 5.02 4.58 3.74 3.44
11 Etm (mm/bln) = Hr x Eto 46.47 88.43 90.79 88.95 39.05 12.21 4.47 10.06 10.04 55.00 74.82 34.37
C LIMITED EVAPOTRANSPIRASI (mm/bln)
12 Exposed Surface (m ; %) 35 35 35 35 35 35 35 35 35 35 35 35
13 n (jumlah hari hujan) 20 26 25 24 10 3 1 2 2 12 20 10
14 DE/Epm = ( m/20) (18-n) : (%) -3.50 -14.00 -12.25 -10.50 14.00 26.25 29.75 28.00 28.00 10.50 -3.50 14.00
15 DE (mm/bln) Row 15 x 11 -1.63 -12.38 -11.12 -9.34 5.47 3.20 1.33 2.82 2.81 5.77 -2.62 4.81
16 E actual (mm/bln) = Epm - DE Row 15 - 11 48.10 100.81 101.91 98.29 33.58 9.00 3.14 7.24 7.23 49.22 77.44 29.56
D WATER SURPLUS (mm/bulan)
17 P - Ea ; (mm/bulan) Row 1 - 16 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 -7.23 305.32 333.45 267.37
18 SMS = ISMS + (P - Ea) ; (mm/bulan) Raw 17 x 19 766.24 911.45 574.77 568.90 290.58 230.39 205.30 231.91 192.77 505.32 533.45 467.37
19 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
20 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.23 0.00 0.00 0.00
21 Water Surplus (mm/bulan) = (P - Ea) + SS Row 17 + 20 566.24 711.45 374.77 368.90 90.58 30.39 5.30 31.91 0.00 305.32 333.45 267.37
E TOTAL RUN OFF (mm/bulan)
22 Koefisien Infiltrasi ( if ) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
23 Infiltrasi ( i ) = Ws x if ; (mm/bln) Row 22 x 21 113.25 142.29 74.95 73.78 18.12 6.08 1.06 6.38 0.00 61.06 66.69 53.47
24 Konstanta Resesi Aliran ( K ) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
25 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
26 (0.5 x (1 + K) x i ) 109.29 137.31 72.33 71.20 17.48 5.87 1.02 6.16 0.00 58.93 64.36 51.60
27 K x (Gsom) Row 24 x 28 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91 160.91
28 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 270.20 298.22 233.24 232.11 178.40 166.78 161.94 167.07 160.91 219.84 225.27 212.52
29 DGS (mm/bln) = GS - Gsom 97.17 125.20 60.22 59.09 5.37 -6.25 -11.09 -5.95 -12.11 46.81 52.24 39.49
30 Base Flow (mm/bln) = i - DGS Row 23 - 29 16.08 17.09 14.74 14.69 12.75 12.32 12.15 12.34 12.11 14.25 14.45 13.98
31 Direct Run Off (mm/bln) = Ws - i Row 21 - 23 550.17 694.36 360.04 354.21 77.84 18.07 -6.85 19.58 -12.11 291.07 319.00 253.39
32 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 12.41678592 3.939414708 0.844287207 3.915505259 0 0 0 0
33 Total Run Off (mm/bln) = Bflow + DRO + SRO Row 30 + 31 + 32 566.24 711.45 374.77 368.90 103.00 34.33 6.15 35.83 0.00 305.32 333.45 267.37
34 Luas Tangkapan Hujan (km²) 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5 48.5
35 Stream Flow 1/2 Bulan Pertama (m³/dt) Konversi 21.19 26.62 14.03 13.81 3.85 1.28 0.23 1.34 0.00 11.43 12.48 10.01
Perhitungan Indeks Erosivitas Hujan
Satuan Januari Februari Maret April Mei Juni
Rb cm 44.50 48.41 47.40 32.65 17.66 10.40
N Hari 19 19 18 16 8 5
Rm cm 6.94 8.56 8.17 5.54 3.22 2.70
EI30 421.65 521.27 508.80 279.22 138.43 83.14
ndeks Erosivitas Hujan
Juli Agustus September Oktober NovemberDesember Nilai R
6.00 1.87 6.40 17.11 38.38 41.48
3 1 3 7 16 18
2.12 0.41 2.50 5.59 7.23 7.71 14.698555458
47.90 8.31 56.54 189.81 390.71 419.80 3,065.58
R 3643.98073 mm/tahun
Perhitungan Vq
No Nama DAS R (mm/tahun) A (m2) CN Vq (m3)
1 DAS1 3644 262611.2 0.3623 346703.0
2 DAS2 3644 46289905.4 0.3623 61112591.3
3 DAS3 3644 584895.0 0.3623 772186.7
47137411.6
Perhitungan Qp 47698258.66
No Nama DAS Qp (m3/s)
1 DAS1 0.15
2 DAS2 27.23
3 DAS3 0.34
R MUSLE
No Nama DAS a Vq Qp b
1 DAS1 11.8 346702.98093029 0.15 0.56
2 DAS2 11.8 61112591.3 27.23 0.56
3 DAS3 11.8 772186.71166482 0.34 0.56
L 17.5 km
17500 m
S 0.06
Tc 106.393971 menit
1.77323285 jam
Tp 1.18806601 jam
R MUSLE
R No Nama DAS a Vq Qp b
5248.0 1 DAS1 11.8 346.7 0.15 0.56
1720711.4 2 DAS2 11.8 61112.6 27.23 0.56
12867.4 3 DAS3 11.8 772.2 0.34 0.56
70.239
I C Q
8.7798185375 0.3623 0.232227
8.7798185375 0.3623 40.93407
8.7798185375 0.3623 0.517222
Vq (m3)
346.7
61112.6
772.2
R
109.6 pang leutikna
35950.8 badagna
268.8 sedeng
USLE
Luas Catchment (Ha)
Tingkat Bahaya Erosi Jumlah Median
Penyaring
Sangat Ringan < 15 ton/Ha/tahun 7.5 3432.51152975097
Ringan 15-60 ton/Ha/tahun 37.5 993.306779733002
Sedang 60-180 ton/Ha/tahun 120 338.715132924
Berat 180-480 ton/Ha/tahun 330 5.292423952
Sangat Berat > 480 ton/Ha/tahun 500 0
Jumlah 4769.82586635997
MUSLE
Luas Catchment (Ha)
Tingkat Bahaya Erosi Jumlah
Median Penyaring
Sangat Ringan < 15 ton/Ha/tahun 7.5 2333.31609182501
Ringan 15-60 ton/Ha/tahun 37.5 803.802496335998
Sedang 60-180 ton/Ha/tahun 120 856.684239515998
Berat 180-480 ton/Ha/tahun 330 460.071165666
Sangat Berat > 480 ton/Ha/tahun 500 37.017220226
Jumlah 4490.89121356901
#NAME?
Laju Erosi (ton/tahun) Erosi Lahan
Metode
Penyaring ton/Ha/tahun ton/tahun
8409.897577231 USLE 24.3 80167.15240583
36170.996175719 MUSLE 67.4 283554
34289.614784636
1296.64386824 Potensi Sedimen (SDR) (m3/t
Metode SDR SDR (%)
0 USLE
80167.152405826 USDA SCS 33.4 19114.73878369
Auerswald &
15.8 9056.066372187
Bavarian Watersheds
10 Boyce 12.9 7389.968024016
Laju Erosi (ton/tahun) Vanoni 26.0 14892.91810062
Penyaring
9571
20822
100670
131825
20666
283554
A 47137411.581235
SDR
Metode USDA SCS 0.33381046343891
33.381046343891
Auerswald & Bavarian Watersheds
0.158150720595393
15.8150720595393
10 Boyce 0.129054792681785
12.9054792681785
Vanoni 0.260082648755135
26.0082648755135
Erosi Lahan Laju Erosi
kg/tahun m3/tahun mm/tahun
80167152.405826 57262.2517184472 1.21479414752682
283554000 202538.571428571 4.29676905528687
30 40 50 60
un