The urea granulation unit have a net rated capacity of 1670 MTPD
of granulated urea.
b) Composition
V The raw material is melt urea from urea wet plant of following
analysis.
() P. ~11 r
Cone. Urea + Biuret 96 .10% b.w v--- CO.iif. ~ 'S("v;
Temperature
r-\
. \ . ',' • I
v'
\J\\
\\ .. The utilities which are used in granulation unit from urea wet
plant are as foHows.
Formaldehyde ~ 60 % \vt. v
Urea ~ 25 % wt.
v
/
Water ~ 15% wt. \i
PRODUCTION DEPARTMENT Rev.
OPERATIONS MANUAL - AREA GENERA
UREA GRANULATION PLANT 3.0 0
SUBJECT / TITLE P r e pare d b y: Page :
3.0 : INTRODUCTION & DESIGN BASIS MM 4of4
A pprove d b y :
3.2 : DESIGN BASIS NUR
b) The unit shall not discharge liquid effluent to the sewers during
normal operation of the unit.
PRODUCTION DEPARTMENT C hapte r No. Rev. I' l'j
OPERATIONS MANUAL - AREA GENERAL
• UREA GRANULATION PLANT 4.0 0
SUBJECT / TITLE Prepared by: Page:
4.0 : GENERAL DESCRIPTION MM 1 of 1
Approved by: Date :
TABLE OF CONTENTS NUR 22/2/97 :
4.1 INTRODUCTION 1
4.2 PHYSICO CHEMICAL ASPECTS OF
GRANULATION PROCESS 2
4.3 THE GRANULATOR 3
4.4 GRANULATION SECTION SOLID CIRCUIT 4-5
4.5 DUST EMISSION AND RECOVERY 6
PRODUCTION DEPARTMENT Rev.
t
OPERATIONS MANUAL - AREA GENERAL
UREA GRANULATION PLANT 4.0 o
SUBJECT / TITLE Prepared by: Page:
4.0 : GENERAL DESCRIPTION MM lof6
Approved by: Date .
NUR 22/2/9
4.1 I INTRODUCTION
- -- - -- ----
PRODUCTION DEPARTMENT
OPERATIONS MANUAL - AREA GENERAL
t
UREA GRANULATION PLANT 4.0 o
SUBJE CT / TITLE Prepared by: Page:
4.0 : GENERAL DESCRIPTION MM 201'1)
----
Fluidization air deliver on the lower casing is evenly distributed by the
--
p erforated plate\, suspends the solids fine upper casing and is exhausted
. J'
at the top of the granulator. This air stream is urea dust laden and
proceeds to further treatment in the UD 651 granulator scrubber. v' 11" J.::.
t'The fluidized layer has a thickness of 0.5 to 2.0 m and is confined to the
lower p art of the upper casing which is vertically split in six sections.
The seed material is introduced into the first section of the upper casing
chamb er 1, where it is sprayed upon by urea solution . As granules move
from chamber 1 to chamber 2 and then 3, their size steadily increases by
..
accr etion to reach the required granule diameter at which the product
flows out at the granulator.
The urea feed stock at granulator inlet is typically a 96% urea that also
con tains urea formaldehyde UF-85 as anticaking agent.
l'l ~<
t
5eed material .In ~
(fine)
\
50luhon
.
Atomizing air
Gronul e6 our
. . tt-.
Fluldlza ton air
/
The UB 631 granulator receives the feedstock urea solution from the
UP-311 AJS urea melt pump located in the urea synthesis unit. Urea
formaldehyde UF-85 fed by means of metering pumps UP-621 AJS and
"*
added to the urea solution at the suction of the solution pump UP-311 AJS
at a rate of 4.5 to 5.5 Kg per ton of end product.
<f-
UP-311 AJS take care of efficiently mixing of both fluids for free flowing
product without further treatment.
The first fluid bed cooler UR -641 is a standard fluidized bed cooler.
A. mbient air supplied by the first cooler fluidization air fan UK-641 IS
cold or when the plant operates at low capacity. The first cooler air pre-
h eater UH-645 is used. Urea granules cooled down to the required
• -I<
-
whole granulation unit.
The on-size fraction is further cooled down in the final fluid bed cooler
UH-731, chilled air is used as cooling medium in the final fluid bed cooler,
chilling is carried out by cooling the air by means of glycol water in the
final cooler air chiller UH-735 and drying the air in the final cooler air
pre-heater UH-736. Final cooler fluidization air fan UK-731 supplies the
chilled air to the final cooler, at around 11°C.
""
There are two main locations where urea dust laden air originates from
the granulator and both fluidized bed coolers. In addition to those are the
various dedusting points i.e. bucket elevator top, roll crushers, vibrating
screens , discharge points on the conveyor belt FM-201 , that all merge
dedusting fan UK-655. The air exhausted from granulator UB-631
entrains around 3.5 - 4.5% of the plant output in the form of fine urea
'\(
Some urea dust though in a much lower quantity and of a coarser nature
(average particle around 20 ~m) than the granulator is recovered from
. _ _~~---------lI'
-¥ -':---------.c
The dilute urea solution originating from the cooler scrubber operation is
used as scrubbing liquid to the granulator scrubber. The necessary
process water flow is introduced in the system via the cooler scrubber,
besides small amounts necessitated for flushing the demisters in both
scrubbers.
Under normal operating conditions, the feed solution from wet section flows
through the pressure control valve EY-631 to the distribution header and
further onwards to the spray nozzles.
The spray system consists in nine rows of hairpin like pipes onto which 21
vertical risers with atomization nozzles are fitted. Each row feature a separate
hand valve for on/off operation. During injection the control valve PV-631 is
-----
- - i
open to the main header wheres HIC-631 at the farther extremity of the
distribution header is closed.
The control valve onto the recycle line to the urea wet unit HIC-311 IS also
closed.
Where no urea solution injection takes place two situation many occur.
1. The feed solution through HIC-631 which is now openjl whereas all the
~
II . The control valve PV-631 is closed, opening HIC-311 feed solution is recycled
to the urea wet unit UT-261 the urea storage tank.
The recycle tank UT-655 collects various streams i.e. solid lumps wash water
from scrubbers , urea solution etc. The sump solution concentration varies
between 40 % - 50 % and may reach 60% momentaneously . In case too large
quantities of solid arrive at a short time , heat and agitation are provided
through steam ejector UJ-G55.
PRODUCTIONDEPARTMENT
PRODUCTION DEPARTMENT Chapter No. Re v.
Rev,
OPERATIONSMANUAL
OPERATIONS MANUAL- -AREA
AREAGENERAL
GENERAL
UREA
UREAGRANULATION
GRANULATIONPLANT
PLANT 5.0
5.0 00
SUBJECT/ /TITLE
SUBJECT TITLE Prepared by: Page:
Preparedby: Page:
5.0: DETAILED
5.0 : DETAILEDPROCESS
PROCESSDESCRIPTION
DESCRIPTION MM
MM 2 2ofof1515
Approved by: Date .
Approvedby: Date
5.1: :UREA
5.1 UREASOLUTION
SOLUTIONCIRCUIT
CIRCUIT NUR
NUR 26/2/9
26/2/97
Toprevent
To preventcrystallization
crystallizationininthe
thetank,
tank,the
the temperature
temperature must
must be
be capable
capable of
of
reaching80
reaching oS
80°C and
and is controlled by TIC-655
controlled by TIC-655 regulating
regulating the
the admission of lJi§
admission of LHS
steamtotoJU-655
steam JU-655..
~
Fromththe
From adjacentcompartment
e adjacent compartmentsolution
solutionisisdrawn
drawntotothe
the wet
wetplant
plant via
via pumps
pumps
UP-655AlS
UP-655 A/Surea
ureasolution
solution recycle
recyclepumps.
pumps.The
The recycle
recycle solution
solution flow
flowrate
rate isis set
set by
the level
the level control
control valve
valve LIC-655
LIC-655 and flow is monitored by FI-655.
flow is FI-655 .
Special
Sp care must
ecial care must be
be taken to
to avoid
avoid recycling of chloride
chloride containing
containing product
product or
other contamination
other contamination e.g.
e.g. oil.
oil.
Occasionallysome
Occasionally somevapours
vapourscan
can evolve
evolvefrom
fromrecycle
recycletank,
tank, they
they are vented
vented to
to
atmosphere by means
means of
of fume
.
extraction
extraction fan
fan UK-655.
UK-655
-.. .
-
GRANULATOR SECTION
GRANULATOR SAFETY
GRANULATOR
- EXTRACTOR
. SCREENS 95 ° C
. TO FIRST FLUID BED COO LER
The atomization air n ecessary to sh ape the urea solution spray into b ed is
delivered by the UK-611 atomization air blower at a temperature of 135
°C after post compression heating in th e UR-6ll atomization air beater.
The temperature is controlled via the control valve TV-63 1 regulating the
amount ofMLS steam through the heat exchanger DR-6ll.
Atomization air pressu re 0.5 5 Kg/Cm 2g and r esulting air flow rate are
set, safely away from the surge protection valve by RIC-611. The filter
US-6ll is provided to protect against sand wind.
PRODUCTION DEPARTMENT Chapte r No. Rev.
OPERATIONS MANUAL - AREA GENERAL
UREA GRANULATION PLANT 5.0 0
SUBJECT I TITLE Prepared by: Page:
MM 4 of 15
5.0 : DETAILED PROCESS DESCRIPTION
A pproved by: Date
5.3 : THE FLUIDIZATION AIR CIRCUIT NUR 26/7/9
The air flow rate is set by pressure control valve PV-63I which keeps the
,---
top part of th e granulator upper casing under slight vacuum
WC}.
~-2~mm..
The fluidization air stream is divided up into six stream directed to the
corresponding lower casing compartments. Each branching duct is fitted
with flow meters FI-6I522 AlBIC , FI-6I523/24/25 giving relative
indication of flow rate to each ch amb er.
The air exhausted from the granulator top is further treated into
granulator scrubber before being vented to the atmosphere via RIC-651
granulator scrubber exhaust fan. Its flow rate is controlled through the
control valve RIC- 651 on the suction side of the fan UK-65 1.
PRODUCTION DEPARTMENT C h a pter No. R ev .
OPERATIONS MANUAL - AREA GENERAL
UREA GRANULATION PLANT 5.0 0
SUBJECT / TITLE Prepared by: Page:
5.0 : DETAILED PROCESS DESCRIPTION MM 5 of 15
Approved by: Date :
5.4 : THE SOLID CIRCUIT NUR 26/2/9 I
Urea granules cooled down to about 70°C and lifted by the bucket
elevator UM-711 split up into two streams to the sieves US-711 AlB
vibrating screen where granule selection occurs. Either sieve can be by-
passed with the same splitter when the operation load is reduced.
Proper distribution of the product over the two screen inlets is created for
screen feeders UZ-711 AlB.
This one under normal operating condition flows VIa a splitter box
UZ-712 AlB diverter to the final fluid bed cooler UH-731. By means of
that box it can also be redirected to either the start-up bin UT-635 or
the final cooler by-pass duct, or the granulator UB-631 itself.
This one under normal conditions , flows back to the granulator via the
diverter UZ-713 AlB splitter box. The flow can also be diverted to the
start-up bin or the recycle tank UT-655~~der ~~ -fr~~i~-?~~~e-~
Jfr-e;--;'~~la~e indication of individual screen~
~
PRODUCTION DEPARTMENT C hapte r No . Rev.
OPERATIONS MANUAL - AREA GENERAL
UREA GRANULATION PLANT 5.0 0
SUBJECT / TITLE Pre pared by: Page:
5.0: D~'l IAILED PROCESS DESCRIPTION MM 6 0f1 5
Approved by: Date :
5.4 : THE SOLID CIRCUIT NUR 26/2/9/
This one normally goes as seed material to the granulator via the
crushers UB-721 AlB. It can overflow from the crusher feed hooper
UT-721 AlB to the recycle tank UT-655 . Qver size fracbon---fWw-r-a-te-
gives relative indication before the recycle inlet to the granulator.
SAFETY FIRST FLUID VIBRATING FINAL FLUID
..- -
960/., UREA SOLUTION ..
FRO M WET PLANT ,-
~
GRANULATOR
-
95 ° C ..
SCREENS BED COOLER
70°C ..
SCREENS
ON SIZE ..
PRODUCT"" BED COOLER
50 ° C _
UF 85 GRANULAR UREA TO S
~
t UNDER SIZE PRODUCT
t lR AIRt
j~
The cooling of the urea granules down to the required temperature takes
place in a two fluid bed type coolers UH-641fUH-731. The product
discharged from the granulator flows by gravity to the first fluid bed
cooler where it is fluidized and cooled by the ambient air from the first
cooler fluidization air fan UK-641. The air flow rate is adjusted via the
hand valve (inlet guid,~ vane). In ca.s.£Lam.bi~ntl!ir is p,!!:rticularly cold or
damp, the first cooler air preheater UH-645 fed with LHS steam is used.
The first s..o..Qler treat both end. and recycle product and brings its
temperature to 70 ec (maximum).
The on-size (end product) only is further cooled down by means of chilled
air from final cooler fluidization air fan UK-731. The air flow rate is
adjusted via the hand valve (inlet guide vane) .
The end product temperature is 50 ee, because less pro~ to caking when
cold. However provision has been made to by-pass the final fluid bed
cooler as a temporary step to avoid plant shut down during maintenance
job on final cooler fluidization air fan.
The air chiller UH-73?.is fed with glycol water cooled at ~ C by heating
liquid ammonia from the ammonia storage. The air heater UH -736 is fed
with LHS steam. Level of the product in the coolers is adjusted by means
of an overflow :yeir adjusted manually.
..
SCREENING AND COOLING SECTION
95 ° C _
URE A GRANULES -
FIRST FLUID BED
COOLER
UH 641
70 ° c ..
VIA ELEVATOR (UM 711j
VIBRATING
SCREENS
US 711AB
70 ° C
ON SIZE PRODUCT --
FINAL FLUID BED
COOLER
UH 731
so oc ...
UREA PRODUCT TO Sr'I5"R AGE
FR OM GRANULATOR (UREA GRANULES)
•
41 ° C . 1 045 Kg/Cm' 11 ° C
OVER SIZE PRODUCT , UNDER SIZE PRODUCT
FINAL COOLER
FIRST COOLER CRUS HER , - -
FLUIDIZATION AIR
~. --
8 °C
The air exhausted from the granulator contains some urea dust and
for that reason is cleaned in a scrubber before being emitted to the
atmosphere.
PRODUCTIONDEPARTMENT
PRODUCTION DEPARTMENT IChapter
Chapter No.
No. Rev.
Rev.
OPERATIONS MANUAL
OPERATIONS MANUAL--AREA
AREAGENERAL
GENERAL
UREAGRANULATION
UREA GRANULATION PLANT
PLANT 5.0
5.0 00
SUBJECT // TITLE
SUBJECT TITLE
Prepared by: Page:
Prepared by: Page:
MM 9 ofof 15
5.0 : DETAILED PROCESS DESCRIPTION
5.0 : DETAILED PROCESS DESCRIPTION MM 9 15
Approved by: Date:
Approved by: Date :
5.6::AIR
5.6 AIRSCRUBBING
SCRUBBING SYSTEM
SYSTEM NUR
NUR 0113/97
01/3/97
The solution
The solution concentration
concentrationinin granulator
granulator scrubber
scrubber tank
tank is
controlled
controlledby
by density
density measuremat
measuremat DIC-651
DIC-651 .. The
' _
The concentration
concentration
22lIiiIC:
about
--
about 45%
45%isisadjusted
adjusted via
coolerscrubber.
cooler scrubber.
via the
the flow
flowrate
rate of
of dilute
dilute urea
urea solution from
from
The high
The high temperature
temperature alarm
alarmT.1 .15123 at the scrubber
Tk65123 scrubber air exhaust
exhaust
gives also
gives also an
an indication
indication of too high concentration
too high concentration of the scrubber
scrubber
solution.
solution.
5.6.2 Cooler
5.6.2 Cooler Exhaust
Exhaust Stream Cleaning
Cleaning
Cooler scrubber
Cooler scrubber UD-661
UD-661 isis the
the wet
wet type
type scrubber.
scrubber. Its features
features also
also aa
cylindrical shell with radial
cylindrical shell
~
radial gas
gas inlet
inlet and
andtop
topvertical
verticaldischarge.
discharge.
~
The top
top demister
demisterisissprayed
sprayedwith
withprocess
processwater
watertotoavoid
avoidclogging.
clogging.
The
The cleaned
cleaned air
air is
is exhausted
exhausted through
through cooler
cooler scrubber
scrubber exhaust
exhaust fan
fan
UK-661 to the atmosphere. The air flow
UK-661 to rate is manually
flow rate manually adjustable
adjustable
by
by means
means of
of inlet
inlet guide
guide vanes.
vanes .The
Thecooler
cooler scrubber
scrubbertank
tankUT-661
UT-6Glisis
located
located underneath itit and
andreceives
receives process
process water
waternecessary
necessaryfor
for
water
water balance
balanceof
ofthe
thecomplete
complete granulation
granulationsystem.
system .
The
The dilute
dilute urea
ureasolution
solutionisiscirculated
circulatedtotothe
thescrubber
scrubberby
bymeans
meansofof
cooler
cooler scrubber
scrubber circulation
circulation pumps
pumps UP-661
UP-661 A/S.
AlS . Normally
Normally its
its
concentration
concentrationvaries
variesfrom
from1%
1%to
to 3%
3% only. !Y2A'fJ 71-
-- giA,
..
Ii ATMOSPHERE
STACK
~--
UX 670
Ir--..
GRANULATOR
SCRUBBER - COOLER
SCRU BBER
~ IR + UREA DUST FROM DEDUSTING SYSTEM
-
AIR + UREA DUST FROM GRANULATOR UD 651 UD 661
-
_ AIR + UREA DUST FROM FIRST&FINAL COOLER
.r , t ,
GRANULATO R COOLER
COARSE&LUMPS SC RUBBER TANK SCRUBBER TANK
FROM SAFETY SCREENSI
CRUSHERI VIBRATING SCREENS . , UT 651 UT 661
If
RE CYC LE TANK
The dedusting is catered for by the dedusting fan UK-665 of which flow
rate is regulated by hand valves at each suction point. The air flow is
directed to the cooler scrubber UD-661 for cleaning.