X3A0T

Schedule Title Pressurisation units Issue For Construction


Schedule Ref Revision CA
Project Title UDC FLORESTA - Retail Building Date September, 2019
Project No 984863 Checked SV

Unit ref PU-RB-BF-01


Number of No 1
Location BF - ETS Room
System Chilled Water
Fluid Water
Operating temp flow °C 5.5
Operating temp return °C 14.4
Max Operating Temperature °C 50
Static pressure bar 5.5
Max system pressure bar 10
Fill pressure bar 6
Approx system volume litres 18000 (Appox)
System height above set m 16 (Appox)

Notes
1 This schedule shall be read in-conjunction with the specification and drawings
2 Locate units with adequate space for safe maintenace
The installer shall be responsible for calculating the final system volume and final selection of expansion vessel based on final selection
3
of equipment and installation drawings
4 Provide test certificates
5 Wiring to comply with BS 7671
6 Provide all necessary interconnecting pipework
7 The unit controls shall include:
a) alternating pump starting where two or more pumps are specicified
b) pump start frequency
c) leak detection alarm to indicate leak if above maximum starts per hour
d) high/low pressure alarms arranged for manual restart
e) common alarm to shut down system if it exceeds pressure limits and provide indication of fault
f) emergency stop button
8 Provide visual display for high/low flow; pump failure; excessive pump operation; low water level.
9 Provide automatic air vent integral to the unit
10 Expansion tanks shall be blaTenderer type tanks that provide permanent separation of air and water.