Work Description of Works Unit Rate, Tk SMS Rate, Tk Basis of Measurement Above/
No. ENTERPRISE Remarks
Rate, Tk
1 Fixing of PVC conduit of following sizes The linear length in ft. along Including
through brick-wall, RCC slab, column, the mid section of pipe shall supply of G.I
including circular, Junction boxes, bends, be measured for payment. All wire & Nitto
the fitting such as junction/ tape
sockets, 14 swg G.I. pull wire & including
pull box shall be included in
all other accessories and supply of binding the length of pipe.
wire as per drawing and instruction of the
Engineer-in-charge
I. SINGLE-CORE -
a) 1 x 3/029/1.00mm2 Rft. 1.75 4.38
b) 1 x 3/036/1.50mm2 Rft. 1.75 4.38
c) 1 x 7/029/2.50mm2 Rft. 1.90 4.75
d) 1 x 7/036/4.00mm2 Rft. 1.90 4.75
e) 1 x 7/044/6.00mm2 Rft. 2.10 5.25
f) 1 x 7/064/10.00mm2 Rft. 2.10 5.25
g) 1 x 16 rm Rft. 2.75 6.88
h) 1x 25rm to 1x 35 rm Rft. 2.75 6.88
i) 1x 50rm to 1x 70rm Rft. 3.85 9.63
j) 1x 95rm to 1x 120rm Rft. 3.85 9.63
k) 1X150 rm & above Rft. 4.40 11.00
II. MULTI-CORE - The linear length in ft. of
cable shall be measured for
a) 2C-1.50mm2 Rft. 2.00 5.00 payment.
b) 2C-2.50mm2 Rft. 2.50 6.25
c) 2C-4.0mm2 & above Rft. 3.50 8.75
-
3 Drawing of PVC insulated or PVC sheathed - The linear length in ft. of Including
copper conductor for telephone and TV. pipe and cable shall be supply of G.I
antenna, Intercom etc. through PVC conduit measured for payment. wire & Nitto
tape
in wall, roof, slab, column, beam, under
ground, surface etc. and thereof including
all consumable with supply of G.I wire &
Nitto tape as per drag. and inst. of
Engineer-in-Charge
b) Fixing of fan hook box for ceiling fan Each 60.00 150.00
etc. as per instruction of Engineer-in-charge
( After slab casting by making hole in
RCC slab)
c) Steel Box fitting in RCC slab for Spot Each 18.00 45.00
light
10 Fitting fixing Ceiling fan with necessary Nos. 50.00 125.00 The Fixture installed
box as per drawing or instruction of the Complete in all respect
Engineer-in-charge. including consumable
materials shall be considered
as one unit.
16 Fitting fixing and installation of Set 500.00 1,250.00 The actual top surface area of
SDB/EDB boxes of 18 SWG sheet metal the boxes shall be the basis of
enclosed hammer painted with hinged measurement
front cover with required nuts, bolts etc.
having knockout for conduits / cables
entry and exit (bottom / Top as required
for 415/240 Volts TP & N/SP & N
operations. The box should have solid
natural link. Each box should have one
copper earthling block of required
numbers of required dia. Drilled holes for
accommodating the terminal of ECC
with copper 1ug (where applicable).
Including required numbers of brass nuts
bolts etc. complete as per direction of
Engineer-in-Charge
17 Main earthing of building with G.I. Pipe Rft. 22.00 55.00 The Fixture installed
including boring up to max. 100'-0" laying Complete in all respect
of copper wire, making inspection pit etc. including consumable
materials shall be considered
all complete as per direction Engineer-in- as one unit.
charge.
21 Gate light, Logo light, Garden Light fitting Set 85.00 212.50 The Fixture installed
with necessary connection & work as per Complete in all respect
direction of Engineer-in-Charge including consumable
materials shall be considered
as one unit.
22 3-Phase meter fitting, fixing including Nos. 140.00 350.00 The Fixture installed
necessary connection & work as per Complete in all respect
direction of Engineer-in-Charge including consumable
materials shall be considered
as one unit.
23 Single Phase meter fitting, fixing including 100.00 250.00 The Fixture installed
necessary connection & work as per Complete in all respect
Engineer-in-Charge including consumable
materials shall be considered
as one unit.
24 Lighting arrestor with base plate fitting, Set 100.00 250.00 The Fixture installed
fixing with necessary connection complete Complete in all respect
as per Engineer-in-Charge including consumable
materials shall be considered
as one unit.
25 Wooden board fitting of any size, all Nos. 25.00 62.50 The Fixture installed
complete Complete in all respect
including consumable
materials shall be considered
as one unit.
26 Fitting fixing of Fire Extinguisher of any Nos. 45.00 112.50 The Fixture installed
capacity etc complete Complete in all respect
including consumable
materials shall be considered
as one unit.
34 Fitting, fixing of cable lugs with PIB tape in - Actual number should be
proper position etc. all complete as per counted
drawing & direction of Engineer-in-charge
Note 1) This Rate is Applicable only for 10 Storied Building. For 11- 15th floor the rate will
increase 10% and above 16th floor the rate will increase 20 % on the Labour Rate -
: Present 2020
and the rate of Main line for SDB, TV, Telephone, Internet , Intercom & for Lightning
arrestor of any floor will be applicable of the rate of the floor from which it will be
drawn to the bottom
2)You will pay current market rate if exclude worklist.
3)You will pay 1.5 x times more than as per worklist rate If you make us rework.
4)You will pay 27 taka per square feet as per in-voice or roof Area if you choose out of
working list rate.
5)You Have to pay us daily 600 taka per labour and after 7 days you will give
us full payment with labour charge as much as work has done.
6) This Rate schedule will be applicable for Bashundhara and all up coming project.
Prepared by Forwarded by Approved by
Md. Alamin Head of EME Chief Engineer
Coordinaton, Construction