Professional Documents
Culture Documents
Shree Basuki LSS, Aruarbang
Shree Basuki LSS, Aruarbang
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
7.1 CEMENT PLASTER WORK
7.1.1 ON INNER WALL sq.m 579.24 600.00 347,544.00 586.85 352,108.22 579.23 347,540.93 7.61 4,567.29 101.31%
7.1.2 ON CEILING (1:4) sq.m 176.98 500.00 88,490.00 312.00 156,000.96 176.97 88,486.21 135.03 67,514.75 176.29%
7.1.3 ON OUTER WALL (1:6)
7.1.3.1 EXTERNAL PLASTER sq.m 216.55 600.00 129,930.00 441.40 264,837.99 360.53 216,318.00 80.87 48,519.99 203.83%
7.1.4 EXTERNAL PLASTER WITH CEMENT PUNNING sq.m 35.21 700.00 24,647.00 35.66 24,962.00 35.66 24,962.00 0.00 - 101.28%
7 PAINTING WORKS
7.2.1 DISTEMPER PAINT sq.m 920.30 200.00 184,060.00 1,097.51 219,502.00 986.79 197,358.00 110.72 22,144.00 119.26%
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 236.95 350.00 82,932.50 441.40 154,490.00 429.46 150,311.00 11.94 4,179.00 186.28%
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 253.40 550.00 139,370.00 - - 0.00 - 0.00
7.2.4 ENAMEL PAINT sq.m 230.49 400.00 92,196.00 224.90 89,960.00 221.65 88,660.00 3.25 1,300.00 97.57%
8 MISCELLANEOUS
8.2 CEMENT BOARD WALL sq.m 18.77 6,500.00 122,005.00 18.77 122,005.00 18.76 121,950.07 0.01 54.93 100.00%
8.3 RAILING kg 982.18 220.00 216,079.60 992.98 218,455.60 972.25 213,895.00 20.73 4,560.60 101.10%
8.4 PUMP SHED nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 0.00 - 100.00%
3 ELECTRICAL WORKS
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 0.00 - 100.00%
1.2 Stand Alone 6 A DP MCB with Enclosure no. 1.00 8,500.00 8,500.00 1.00 8,500.00 1.00 8,500.00 0.00 - 100.00%
2 CABLES & WIRES
2.1 2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper rm 50.00 800.00 40,000.00 52.00 41,600.00 52.00 41,600.00 0.00 - 104.00%
2.2 conductor wires mutistranded copper conductor wires + 1
2 Nos 2.5 Sq.mm rm 50.00 250.00 12,500.00 50.00 12,500.00 12,500.00 0.00 - 100.00%
50.00
B Nos. 1.5sq
School mm multistranded Cu wire
Blocks
1 DISTRIBUTION BOARDS nos.
1.1 Ground Floor nos. 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 0.00 - 100.00%
1.2 First Floor nos. 1.00 22,000.00 22,000.00 1.00 22,000.00 1.00 22,000.00 0.00 - 100.00%
1.3 Second Floor nos. 1.00 22,000.00 22,000.00 1.00 22,000.00 1.00 22,000.00 0.00 - 100.00%
1.4 Stand Alone 6 A DP MCB with Enclosure nos. 1.00 8,500.00 8,500.00 1.00 8,500.00 1.00 8,500.00 0.00 - 100.00%
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm rm 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 0.00 - 100.00%
3 Multistranded Cu wire
General Service Light Point Wiring
3.1 One Way Light Point pts. 46.00 700.00 32,200.00 46.00 32,200.00 46.00 32,200.00 0.00 - 100.00%
3.2 Two Way Light Point pts. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
3.3 Ceiling Fan Point pts. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 28.00 700.00 19,600.00 28.00 19,600.00 28.00 19,600.00 0.00 - 100.00%
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 28.00 900.00 25,200.00 28.00 25,200.00 28.00 25,200.00 0.00 - 100.00%
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan nos. 2.00 6,000.00 12,000.00 2.00 12,000.00 2.00 12,000.00 0.00 - 100.00%
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type nos. 16.00 2,700.00 43,200.00 16.00 43,200.00 16.00 43,200.00 0.00 - 100.00%
7.2 18 W LED Recessed Mounted Square type nos. 8.00 2,700.00 21,600.00 8.00 21,600.00 8.00 21,600.00 0.00 - 100.00%
7.3 12 W LED Surface Mounted Cylindrical type nos. 9.00 2,400.00 21,600.00 9.00 21,600.00 9.00 21,600.00 0.00 - 100.00%
7.4 12 W LED Recessed Mounted Circular type nos. 5.00 2,400.00 12,000.00 5.00 12,000.00 5.00 12,000.00 0.00 - 100.00%
7.5 7W LED Wall Light nos. 2.00 1,800.00 3,600.00 2.00 3,600.00 2.00 3,600.00 0.00 - 100.00%
7.6 9W LED Surface Mounted Cylindrical type nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
7.7 6W LED Recessed Mounted Circular type nos. 3.00 1,800.00 5,400.00 3.00 5,400.00 3.00 5,400.00 0.00 - 100.00%
7.8 7W LED T5 Slim Mirror Light nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
8 Pull Box nos. 3.00 700.00 2,100.00 3.00 2,100.00 3.00 2,100.00 0.00 - 100.00%
9 External Post Top Light Pole nos. 3.00 7,500.00 22,500.00 3.00 22,500.00 3.00 22,500.00 0.00 - 100.00%
10 Post Top External Light Fixtures nos. 3.00 9,800.00 29,400.00 3.00 29,400.00 3.00 29,400.00 0.00 - 100.00%
11 Earthing & Lighting Protection
11.1 Chemical Earthing nos. 3.00 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 0.00 - 100.00%
11.2 Earthing Bar nos. 3.00 2,200.00 6,600.00 3.00 6,600.00 3.00 6,600.00 0.00 - 100.00%
12 Earthing Strip/Wires
12.1 25 x 3 mm GI strip mtr. 65.00 300.00 19,500.00 67.00 20,100.00 65.00 19,500.00 2.00 600.00 103.08%
12.2 12 SWG Cu wire mtr. 15.00 200.00 3,000.00 16.00 3,200.00 15.00 3,000.00 1.00 200.00 106.67%
13 Earth Test link nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 0.00 - 100.00%
C Solar PV System
1 Solar PV Panel nos. 4.00 26,000.00 104,000.00 4.00 104,000.00 4.00 104,000.00 0.00 - 100.00%
2 Tubular Deep Cycle Battery nos. 2.00 30,000.00 60,000.00 2.00 60,000.00 2.00 60,000.00 0.00 - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 64.00 1,600.00 102,400.00 55.00 88,000.00 55.00 88,000.00 0.00 - 85.94%
25mm r.m 10.00 1,000.00 10,000.00 9.00 9,000.00 9.00 9,000.00 0.00 - 90.00%
20mm r.m 11.00 700.00 7,700.00 10.00 7,000.00 10.00 7,000.00 0.00 - 90.91%
15mm r.m 5.00 500.00 2,500.00 3.00 1,500.00 3.00 1,500.00 0.00 - 60.00%
c CPVC Ball Valve
40 mm nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
25 mm nos. 3.00 900.00 2,700.00 3.00 2,700.00 3.00 2,700.00 0.00 - 100.00%
20 mm nos. 2.00 400.00 800.00 2.00 800.00 2.00 800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation
110 mm r.m 46.00 1,400.00 64,400.00 32.00 44,800.00 32.00 44,800.00 0.00 - 69.57%
75mm r.m 27.00 1,200.00 32,400.00 25.00 30,000.00 25.00 30,000.00 0.00 - 92.59%
50mm r.m 7.00 350.00 2,450.00 2.00 700.00 2.00 700.00 0.00 - 28.57%
B School Blocks
1 Sanitary Installation
a Water Closet Set set 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
b Orissa Pan set 2.00 3,100.00 6,200.00 2.00 6,200.00 2.00 6,200.00 0.00 - 100.00%
c Hand Wash Basin set 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 11,000.00 22,000.00 2.00 22,000.00 2.00 22,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 6.00 4,000.00 24,000.00 6.00 24,000.00 6.00 24,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 2.00 2,500.00 5,000.00 2.00 5,000.00 2.00 5,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 1.00 2,600.00 2,600.00 1.00 2,600.00 1.00 2,600.00 0.00 - 100.00%
h Commode Spray nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 5.00 600.00 3,000.00 5.00 3,000.00 5.00 3,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
m CP Foldable Hinge nos. 2.00 5,500.00 11,000.00 2.00 11,000.00 2.00 11,000.00 0.00 - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity % completion Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount
Contract
B CIVIL WORKS : SITE DEVELOPMENT
1 EARTHWORKS
1.1 SITE CLEARANCE AND MOBILIZATION Sq.m 189.83 100.00 18,983.00 175.08 17,507.50 175.08 17,507.50 0.00 - 92.23%
1.2 EARTHWORK IN EXCAVATION Cu.m 109.16 400.00 43,664.00 34.22 13,688.00 34.15 13,660.00 0.07 28.00 31.35%
1.3 EARTHBACK FILLING Cu.m 7.46 300.00 2,238.00 4.60 1,379.85 - 4.60 1,379.85 61.66%
1.4 BOULDER SOLING Cu.m 18.42 6,000.00 110,520.00 18.22 109,320.00 18.16 108,960.00 0.06 360.00 98.91%
2 CONCRETE WORKS
2.1 P.C.C
2.1.1 P.C.C (1:3:6) Cu.m 0.54 14,000.00 7,560.00 0.55 7,700.00 0.55 7,700.00 0.00 - 101.85%
2.1.2 P.C.C (1:2:4) Cu.m 10.35 16,000.00 165,600.00 14.25 228,000.00 14.25 228,000.00 0.00 - 137.68%
2.2 P.C.C FOR R.C.C WORK Cu.m 0.99 20,000.00 19,800.00 0.99 19,800.00 0.99 19,800.00 0.00 - 100.00%
2.3 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.90 2,970.00 9.90 2,970.00 0.00 - 100.00%
2.4 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.11 13,897.00 0.10 12,902.51 0.01 994.49 106.90%
2.5 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,296.00 2.21 1,768.00 124.23%
3 BRICKS MASONRY WORKS
3.2 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.53 9,540.00 0.53 9,540.00 0.00 - 240.91%
4 FLOORING WORKS
4.1 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.72 472.00 4.72 472.00 0.00 - 100.00%
5 METAL WORKS
5.1 METAL WORKS FOR FENCE k.g 1788.66 220.00 393,505.20 1,101.74 242,382.80 884.12 194,506.40 217.62 47,876.40 61.60%
5.2 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 118.89 26,155.80 4.42 972.40 94.29%
5.3 CHAIN LINK FENCE Sq.m 167.21 1,000.00 167,210.00 145.20 145,200.00 138.00 138,000.00 7.20 7,200.00 86.84%
6 PLASTERING WORKS
6.1 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,680.00 7.80 4,680.00 0.00 - 98.48%
7 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.28 2,898.00 8.28 2,898.00 0.00 - 93.35%
8 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 0.00 - 100.00%
FURNITURE WORKS lot 1 3,000,000.00 3,000,000.00 1.00 3,000,000.00 1.00 3,000,000.00 0.00 - 100.00%
Total 25,597,164.70 25,401,040.97 25,623,209.21 - 222,168.24
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-6C(S)-B, T(S)F
School Name : Shree Basuki Lower Secondary School
Location : Aruarbang, Gorkha
Abstract of Cost
Pay Type Design
Quantity in
Item Description of Works Unit Rate (NRs.) Total Qty Amount (NRs) Remarks
BOQ Site
No. 3-6C(S) Ts(F) Water Tank
Development
BILL NO.1 PRELIMINARIES/TEMPORARY WORKS
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 14.00 25,000.00 14.00 350,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 75.00 2,000.00 70.00 140,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 153.36 5,000.00 144.00 720,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 85.47 3,000.00 73.08 219,225.00
8 CONSTRUCTION OF NEW TLC sq.m 36.58 5,000.00 12.95 64,750.00
9 LAB TEST(WATER TEST) job 1.00 7,500.00 1.00 7,500.00
10 TEMPORARY TOILET nos. 2 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km 47.00 50,000.00 47.00 2,350,000.00
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 53.31 18,000.00 72.19 24.88 97.07 1,747,335.15
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 57.75 1,500.00 11.04 10.61 21.65 32,481.60
3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 0.24 9,000.00 0.24 0.24 2,160.00
4 DOORS & WINDOWS WORKS
4.1 METAL FRAME
4.1.1 Door Frame r.m 89.94 1,100.00 89.94 89.94 98,934.00
4.1.2 Window Frame r.m 244.40 1,100.00 223.80 223.80 246,180.00
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 47.66 7,500.00 39.21 39.21 294,075.00
4.3 WOODEN SHUTTER
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 34.25 8,000.00 31.03 31.03 248,240.00
4.4 UPVC DOOR
4.4.1 Shutter/Frame sq.m 7.14 9,000.00 7.14 7.14 64,260.00
4.5 WINDOW GRILL sq.m 28.73 2,500.00 39.77 6.23 46.00 115,000.00
4.6 COLLAPSIBLE GATE sq.m 7.55 10,000.00 7.55 7.55 75,500.00
5 FLOORING WORKS
5.1 HARDENED CEMENT CONCRETE FLOOR sq.m 476.26 900.00 433.94 41.53 475.47 427,923.00
5.2 NEAT CEMENT SKIRTING r.m 226.89 100.00 228.46 11.50 239.96 23,996.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 35.43 1,500.00 2.40 32.88 35.28 52,920.00
6 ROOFING/TERRACING WORK
6.1 METAL WORKS (TRUSS) kg 3613.44 220.00 3,545.29 699.65 4,244.94 933,886.80
6.2 CGI SHEET ROOFING sq.m 235.89 2,000.00 205.50 33.54 239.04 478,080.00
6.3 CGI SHEET ROOFING RIDGE r.m 24.7 1,200.00 17.90 6.95 24.85 29,820.00
6.4 GI FACIA (EAVES) kg 220.63 250.00 143.91 8.06 151.97 37,993.75
6.5 CEMENT BOARD FALSE CEILING sq.m 192.40 1,600.00 174.90 23.75 198.65 317,846.40
7 PLASTERING/WALL FINISHING WORK
7.1 CEMENT PLASTER WORK
7.1.1 ON INNER WALL sq.m 579.24 600.00 534.33 52.52 586.85 352,108.22
7.1.2 ON CEILING (1:4) sq.m 176.98 500.00 288.40 23.60 312.00 156,000.96
7.1.3 ON OUTER WALL (1:6)
7.1.3.1 EXTERNAL PLASTER sq.m 216.55 600.00 372.47 68.93 441.40 264,837.99
7.1.4 EXTERNAL PLASTER WITH CEMENT PUNNING sq.m 35.21 700.00 35.66 35.66 24,962.00
7 PAINTING WORKS
7.2.1 DISTEMPER PAINT sq.m 920.30 200.00 997.64 99.87 1,097.51 219,502.00
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 236.95 350.00 372.47 68.93 441.40 154,490.00
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 253.40 550.00
7.2.4 ENAMEL PAINT sq.m 230.49 400.00 218.67 6.23 224.90 89,960.00
8 MISCELLANEOUS
8.2 CEMENT BOARD WALL sq.m 18.77 6,500.00 15.39 3.38 18.77 122,005.00
8.3 RAILING kg 982.18 220.00 992.98 992.98 218,455.60
8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00 80,000.00
3 ELECTRICAL WORKS
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure no. 1.00 12,000.00 1.00 1.00 12,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure no. 1.00 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES - -
2.1 2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor wires rm 50.00 800.00 52.00 52.00 41,600.00
2 Nos 2.5 Sq.mm mutistranded copper conductor wires + 1 Nos. 1.5sq mm multistranded
2.2 Cu wire rm 50.00 250.00 50.00 50.00 12,500.00
B School Blocks
1 DISTRIBUTION BOARDS nos.
1.1 Ground Floor nos. 1.00 30,000.00 1.00 1.00 30,000.00
1.2 First Floor nos. 1.00 22,000.00 1.00 1.00 22,000.00
1.3 Second Floor nos. 1.00 22,000.00 1.00 1.00 22,000.00
1.4 Stand Alone 6 A DP MCB with Enclosure nos. 1.00 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded Cu wire rm 10.00 600.00 10.00 10.00 6,000.00
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 46.00 700.00 41.00 5.00 46.00 32,200.00
3.2 Two Way Light Point pts. 2.00 900.00 2.00 2.00 1,800.00
3.3 Ceiling Fan Point pts. 2.00 900.00 2.00 2.00 1,800.00
4 6A Universal Pin Light Power Socket Wiring pts. 28.00 700.00 28.00 28.00 19,600.00
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 28.00 900.00 28.00 28.00 25,200.00
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan nos. 2.00 6,000.00 2.00 2.00 12,000.00
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type nos. 16.00 2,700.00 16.00 16.00 43,200.00
7.2 18 W LED Recessed Mounted Square type nos. 8.00 2,700.00 8.00 8.00 21,600.00
7.3 12 W LED Surface Mounted Cylindrical type nos. 9.00 2,400.00 9.00 9.00 21,600.00
7.4 12 W LED Recessed Mounted Circular type nos. 5.00 2,400.00 5.00 5.00 12,000.00
7.5 7W LED Wall Light nos. 2.00 1,800.00 1.00 1.00 2.00 3,600.00
7.6 9W LED Surface Mounted Cylindrical type nos. 1.00 2,000.00 1.00 1.00 2,000.00
D SANITARY WORKS
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 64.00 1,600.00 55.00 55.00 88,000.00
25mm r.m 10.00 1,000.00 9.00 9.00 9,000.00
20mm r.m 11.00 700.00 10.00 10.00 7,000.00
15mm r.m 5.00 500.00 3.00 3.00 1,500.00
c CPVC Ball Valve
40 mm nos. 2.00 2,000.00 2.00 2.00 4,000.00
25 mm nos. 3.00 900.00 3.00 3.00 2,700.00
20 mm nos. 2.00 400.00 2.00 2.00 800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation
110 mm r.m 46.00 1,400.00 32.00 32.00 44,800.00
75mm r.m 27.00 1,200.00 25.00 25.00 30,000.00
50mm r.m 7.00 350.00 2.00 2.00 700.00
B School Blocks
1 Sanitary Installation
a Water Closet Set set 1.00 34,000.00 1.00 1.00 34,000.00
b Orissa Pan set 2.00 3,100.00 2.00 2.00 6,200.00
c Hand Wash Basin set 1.00 8,000.00 1.00 1.00 8,000.00
d Ladies Urinal set 2.00 11,000.00 2.00 2.00 22,000.00
e Self Closing Bib Cock nos. 6.00 4,000.00 6.00 6.00 24,000.00
f CP Spreader in Urinal set 2.00 2,500.00 2.00 2.00 5,000.00
g Toilet Paper Holder nos. 1.00 2,600.00 1.00 1.00 2,600.00
h Commode Spray nos. 1.00 2,000.00 1.00 1.00 2,000.00
i PVC Multi Floor Trap nos. 5.00 600.00 5.00 5.00 3,000.00
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 2.00 2.00 3,000.00
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 1.00 1.00 4,500.00
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 1.00 1.00 4,500.00
m CP Foldable Hinge nos. 2.00 5,500.00 2.00 2.00 11,000.00
5 Barricading Works 1 70 70 Rm
Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization 1 21.95 13.95 306.20
Total 306.20 Sq.m
Building Floors
Classroom
Class Room 2 5.75 5.75 0.20 13.23
Corridor 2 5.75 2.25 0.20 5.18
1 3.25 2.25 0.20 1.46
Below Staircase 1 3.25 5.75 0.20 3.74
Below ramp
For Slope 1 6.82 1.18 0.20 1.61
For Front wall 3-AB 1 6.50 0.45 0.10 0.29
For Side wall -3B 1 1.33 0.45 0.10 0.06
Total 45.99 Cu.m
2 Concrete Works
Column
From lower to plinth tie beam 12.00 0.45 0.45 1.20 2.92
Plinth tie beam
Grid 1,2,3 3.00 14.15 0.30 0.53 6.69
Grid A,B,C,D 4.00 7.60 0.30 0.53 4.79
Ground Floor
For column 12 0.45 0.45 3.00 7.29
G.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 1 1 3.20 1.50 0.15 0.72
Landing 2 1 3.20 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.50 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Staircase gap
Waist Slab 1 1.30 0.20 0.15 0.04
Riser 3 Area 0.02 0.45 0.03
First floor beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
F.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
First Floor
For column 12 0.45 0.45 3.00 7.29
F.F Staircase
Landing beam 1 3.05 0.25 0.38 0.29
Landing 2 1 3.2 1.85 0.15 0.89
First flight
Waist Slab 1 3.35 1.5 0.15 0.75
Riser 9 Area 0.02 1.50 0.30
Second Flight
Waist Slab 1 3.40 1.50 0.15 0.77
Riser 10 Area 0.02 1.50 0.34
Second Floor Beam
Primary Beam
Grid 1-2-3 3 14.15 0.30 0.53 6.69
Grid A-B-C_D 4 7.60 0.30 0.53 4.79
Secondary Beam
Grid A1-C1 2 7.90 0.25 0.43 1.68
Grid 1a 2 5.45 0.25 0.43 1.16
Grid 1b 1 3.20 0.25 0.43 0.34
S.F. Slab
Class room 8 2.73 2.73 0.13 7.43
Corridoor 4 2.73 2.20 0.13 3.00
1 3.20 2.20 0.13 0.88
Slab between beam 1b & 2B-2C 1 0.49 3.20 0.13 0.20
Staircase top slab 1 0.39 3.20 0.15 0.18
Lintel Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 11.10 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.48 0.25 0.08 0.19
Second Floor
Ground floor
Along grid A,B,C,D/(1-2) 4 5.55 0.23 2.33 11.87
Along grid 1 1 11.10 0.23 2.33 5.94
1 3.05 0.23 2.02 1.42
Along grid 2 1 10.80 0.23 2.33 5.78
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 5.75 66.41
Corridor 1 15.80 2.50 39.50
1 3.20 1.50 4.80
Below Staircase 1 4.50 3.20 14.40
Staircase Tread 18 0.3 1.50 8.10
Riser 20 0.15 1.50 4.50
Staircase landing 1 1.80 3.20 5.76
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Store Below Landing 1.00 2.50 1.25 3.11
2.00 0.31 1.25 0.78
2.00 0.69 1.44 1.98
2.00 1.44 1.63 4.69
Pedestal 4.00 1.25 0.25 1.25
4.00 0.50 0.25 0.50
Column
Grid 2A,2D 2.00 0.35 0.68 0.47
Grid 2B,2C 2.00 0.98 0.68 1.32
First Floor
Classroom 2.00 23.15 2.91 134.73
Staircase 1.00 14.67 2.91 42.69
Column
Grid 2A,2D 2.00 0.45 2.91 2.62
Grid 2B,2C 2.00 1.08 2.91 6.26
Deductions
W1 -8 1.10 1.13 -4.95
V1 -8 1.10 0.53 -2.31
W2 -1 1.50 1.00 -0.75
D1 -4 1.10 2.48 -5.45
Second Floor
Classroom 2.00 23.15 3.00 138.90
Secondary Beam
Along Grid A1-C1 2 7.65 0.60 9.18
Along Grid 1a 2 5.70 0.60 6.84
Along Grid 1b 1 3.20 0.60 1.92
Below staircase
Waist slab 1 3.35 1.50 5.03
Landing 1 1.94 1.50 2.90
1 1.47 1.70 2.49
Second floor
Truss Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) and (C-D) 2 5.55 0.40 4.44
Truss Level
Main Beam(300 x 400)
Along grid 1 1.00 14.15 0.40 5.66
Along grid 3 1.00 14.15 0.40 5.66
Along grid A and D 2.00 7.60 0.40 6.08
Column Plaster
Upto Plinth Level
Along grid 1
Grid 1A,1D 2.00 1.10 0.45 0.99
Grid 1B,1C 2.00 0.65 0.45 0.59
Along grid 2
Grid 2A,2D 2.00 0.55 0.45 0.50
Along grid 3
Along grid 3A 1.00 0.08 0.38 0.03
1.00 0.45 0.40 0.18
Grid 3B 1.00 0.08 0.15 0.01
Grid 3C 1.00 0.60 0.15 0.09
Grid 3D 1.00 1.05 0.15 0.16
Outer Steps
Grid 2A,2D 2.00 1.03 0.45 0.92
Grid 3A 1.00 0.93 0.45 0.42
Steps Edge 3.00 0.60 0.45 0.81
For Ramp
Top-3B 1.00 1.33 0.25 0.33
Top 3AB 1.00 6.47 0.13 0.81
Front 3-AB 1.00 1.60 0.60 0.96
1.00 5.10 0.38 1.91
Inner 1.00 7.52 0.15 1.13
Side-3B 1.00 1.33 0.60 0.80
For Bench
Top 2.00 2.40 0.50 2.40
Edge 2.00 5.80 0.13 1.45
Total 372.47 sqm
8 MISCELLANOUS
8.2 Cement Board
Partition
Above Side Walls 1.00 9.73 1.58 15.38
Total 15.39 sq.m
8.3 Railing
Total
Staircase Railing Kg/m Total
No. Length (m) Length
Horizontal ISNB 40 M 1 18.40 18.40 3.61 66.42
Vertical 38 mm Square Pipe 14 0.86 12.04 3.14 37.81
Horizontal 25mm Square Pipe 4 17.35 69.40 0.85 58.99
Balcony Railing
Horizontal ISNB 40 M 2 18.25 36.50 3.61 131.77
Horizontal ISNB 32 M 4 16.40 65.60 3.14 205.98
Vertical ISNB 40 M 34 1.08 36.72 3.61 132.56
Vertical 25mm Square Pipe 236 0.82 193.52 0.85 164.49
Pedestal
ISNB 40M 8 1.70 13.60 3.61 49.10
ISNB 40M 8 2.05 16.40 3.61 59.20
B Column
1 Grid 1 (A & D) 2 20mm ɸ 20mm ɸ
Main Bar 20 6 4.22 50.63 2.47 125.04
20 6 7.26 87.08 2.47 8.00
3.40 6.44
0.125 0.125
0.699 0.699
2 Grid 1(B & C) 2 25mm ɸ 25mm ɸ
Main Bar 25 6 4.82 57.83 3.86 223.20
25 6 7.82 93.83 3.86 362.16
3.70 6.70
0.125 0.125
0.999 0.999
0.125 0.125
0.125 0.125
0.999 0.699
5 Grid 3 (A,B,C & D) 4
Main Bar 20 6 4.22 101.25 2.47 250.09 20mm ɸ 20mm ɸ
20 6 7.26 174.15 2.47 430.15
3.40 6.44
0.125 0.125
0.699 0.699
6 Stiruups 0.37
For 12 column 12 8 18 1.64 344.40 0.40 137.76 0.08 0.37
8 18 1.18 247.80 0.40 99.12 0.37 0.14 0.08
8 18 1.18 247.80 0.40 99.12
0.25
0.37
9 Ground floor column 0.08 0.37
Grid 1,(A &D) 2 20 6 7.20 86.40 2.47 213.41 0.37 0.14 0.08
Grid 1 (B &C) 2 25 6 7.50 90.00 3.86 347.40
Grid 2 (A,B,C,D) 4 20 2 7.20 57.60 2.47 142.27
25 4 7.50 120.00 3.86 463.20
Grid 3 (A) 1 20 6 7.20 43.20 3.86 166.75
Grid 3 (B,C,D) 3 20 6 5.72 103.01 2.47 254.42
Stiruups
For 12 column 12 8 30 1.64 590.40 0.40 236.16 20mmɸ 25mmɸ
8 30 1.18 424.80 0.40 169.92
8 30 1.18 424.80 0.40 169.92
7.2 7.5
10 Stair Case GF
10.1 First Flight 3.35 1.46
Top Main Bar 12 12 7.26 87.11 0.89 77.53 1.67 0.31
Bottom Main Bar 12 12 2.74 32.89 0.89 29.27 0.45
Top Distribution Bar 10 16 1.46 23.36 0.62 14.48 1.2
Bottom Distribution Bar 10 42 1.46 61.32 0.62 38.02 0.3 1.24
Extra Bar 12 12 2.00 24.00 0.89 21.36
10.2 Landing 1
Bottom bar in first flight 12 12 2.90 34.80 0.89 30.97 1
Top Distribution Bar 10 8 1.46 11.68 0.62 7.24
Bottom Distribution Bar 10 12 3.16 37.92 0.62 23.51 3.16
Top Distribution Bar 10 12 3.16 37.92 0.62 23.51 1.69
Extra Bar 12 12 2.00 24.00 0.89 21.36 1 0.21
10.3 Second Flight
Top Main Bar 12 12 7.31 87.74 0.89 78.09 0.82 3.402
Bottom main Bar 12 12 3.30 39.60 0.89 35.24 0.45
Bottom Distribution Bar 10 23 1.46 33.09 0.62 20.52 2.32 0.31
Top Distribution Bar 10 13 1.46 19.47 0.62 12.07 1.2
Top main bar in forst floor level 12 12 2.38 28.55 0.89 25.41 1.89 0.21
Extra Bar 12 22 2.00 44.00 0.89 39.16
1.46
10.4 Nosing Bar 10 20 1.46 29.20 0.62 18.10
10.5 Nosing ties 0.26
18 8 5 0.67 60.66 0.40 24.26 0.22
0.15
16.67
11.2 Grid A,B,C,D ( Main Beam) 4 0.25
Top bar 16 3 10.29 123.48 1.59 196.33 0.1
1 1
8.87
8.87
11.3 Grid 1a (Secondary Beam) 2
Top bar 16 3 7.94 0.00 1.59 0.00 0.2
Bottom bar 16 3 7.94 0.00 1.59 0.00 0.8
Stirupps 8 49 1.31 0.00 0.40 0.00 0.375
0.96 0.96
0.25
12 Landing Beam 3.87
Top bar 16 3 4.02 12.06 1.59 19.18 0.075 0.075
Bottom bar 16 3 4.02 12.06 1.59 19.18 0.2
Stirrups 1 8 31 1.22 37.82 0.40 15.13 0.8
0.33
0.475 0.55
0.085 0.33 0.085
Long Span(upto 1b) 2
Type A 8 19 7.47 0.00 0.40 0.00 0.55 Type A 0.55
Type B 8 19 7.54 0.00 0.40 0.00 0.085 0.085
6.2
Grid 1b-3 1 Type B
Main bar 0.55 1.35 0.55
Type A 8 12 17.45 209.40 0.40 83.76 0.085 0.33
Type B 8 12 17.71 212.57 0.40 85.03
0.55 Type A 0.55
Grid B-C 1 0.085 0.48
Main bar 0.55 Type B
Type A 8 11 4.30 47.25 0.40 18.90 0.085 0.33
Type B 8 11 4.63 50.88 0.40 20.35
Distribution Bar 6
Along Grid 1 2 8 2 6.00 24.00 0.40 9.60
Along Grid 1a 2 8 13 6.00 156.00 0.40 62.40 15.98
Along Grid 2 2 8 12 15.98 383.52 0.40 153.41
Along Grid 3 1 8 2 15.98 31.96 0.40 12.78
Along Grid A1- C1 2 8 13 8.50 221.00 0.40 88.40
Along Grid B and C 2 8 5 8.50 85.00 0.40 34.00 8.5
Along Grid between B and C 2 8 7 3.75 52.50 0.40 21.00
3.75
Negative bar
Along Grid A1-C1 2 8 14 2.16 60.48 0.40 24.19 0.055 2.05 0.055
Along Grid 1a( A-B and C-D) 2 8 11 2.16 47.52 0.40 19.01
Along Grid 2( A-B and C-D) 2 8 11 2.06 45.32 0.40 18.13 0.055 1.95 0.055
along Grid 2 (B-C) 1 8 4 2.17 8.69 0.40 3.48
0.055 2.06 0.055
2 Stair Case FF
2.1 First Flight 3.35 1.46
Top Main Bar 12 12 7.26 87.108 0.89 77.53 1.67 0.31
Bottom Main Bar 12 12 2.74 32.892 0.89 29.27 0.45
Top Distribution Bar 10 16 1.46 23.36 0.62 14.48 1.2
Bottom Distribution Bar 10 42 1.46 61.32 0.62 38.02 0.3 1.24
Extra Bar 12 12 2 24 0.89 21.36
2.2 Landing 1
Bottom bar in first flight 12 12 2.90 34.8 0.89 30.97 1
Top Distribution Bar 10 8 1.46 11.68 0.62 7.24
Bottom Distribution Bar 10 12 3.16 37.92 0.62 23.51 3.16
Top Distribution Bar 10 12 3.16 37.92 0.62 23.51 1.69
Extra Bar 12 12 2 24 0.89 21.36 1 0.21
2.3 Second Flight
Top Main Bar 12 12 7.31 87.744 0.89 78.09 0.82 3.402
Bottom main Bar 12 12 3.3 39.6 0.89 35.24 0.45
16.67
3.2 Grid A,B,C,D (Main Beam) 4 0.25
Top bar 16 3 10.29 123.48 1.59 196.33 0.1
Bottom bar 20 2 10.87 86.96 2.47 214.79 0.475
16 2 10.29 82.32 1.59 130.89
Stirrups
Grid A,B,C & D 4 10 76 1.65 501.60 0.62 310.99
Torsion bar 4 16 2 8.87 70.96 1.59 112.83
0.71 0.71
8.87
1 1
8.87
8.87
3.3 Grid 1a (Secondary Beam) 2
Top bar 16 3 7.94 47.64 1.59 75.75 0.2
Bottom bar 16 3 7.94 47.64 1.59 75.75 0.8
Stirupps 8 49 1.31 128.38 0.4 51.35 0.375
0.96 0.96
Bent up bar in primary and 16 24 3.01 72.24 1.59 114.86
3.7 secondary beam junction 0.42
0.25
4 Landing Beam 3.87
Top bar 16 3 4.02 12.06 1.59 19.18 0.075 0.075
Bottom bar 16 3 4.02 12.06 1.59 19.18 0.2
Stirrups 1 8 31 1.22 37.82 0.4 15.13 0.8
0.33
0.475 0.55
0.085 0.33 0.085
Long Span(upto 1b) 2
Type A 8 19 7.47 283.86 0.4 113.54 0.55 Type A 0.55
Type B 8 19 7.54 286.37 0.4 114.55 0.085 0.085
6.2
5.2 Grid 1b-3 1 Type B
Main bar 0.55 1.35 0.55
Type A 8 12 17.45 209.40 0.4 83.76 0.085 0.33
Type B 8 12 17.71 212.57 0.4 85.03
0.55 Type A 0.55
5.3 Grid B-C 1 0.085 0.48
Main bar 0.55 Type B
Type A 8 11 4.295 47.25 0.4 18.90 0.085 0.33
Type B 8 11 4.625 50.88 0.4 20.35
Distribution Bar 6
Along Grid 1 2 8 2 6 24.00 0.4 9.60
Along Grid 1a 2 8 13 6 156.00 0.4 62.40 15.98
Along Grid 2 2 8 12 15.98 383.52 0.4 153.41
Along Grid 3 1 8 2 15.98 31.96 0.4 12.78
Along Grid A1- C1 2 8 13 8.5 221.00 0.4 88.40
Along Grid B and C 2 8 5 8.5 85.00 0.4 34.00 8.5
Along Grid between B and C 2 8 7 3.75 52.50 0.4 21.00
3.75
Negative bar
Along Grid A1-C1 2 8 14 2.16 60.48 0.4 24.19 0.055 2.05 0.055
Along Grid 1a( A-B and C-D) 2 8 11 2.16 47.52 0.4 19.01
9 Sill Bands
9.1 Ground floor level
Main Bar
Along grid A,B,C,D 8 10 2 5.85 93.60 0.62 58.03
Along grid 1 2 10 2 5.85 23.40 0.62 14.51
Along grid 2 2 10 2 5.85 23.40 0.62 14.51 0.075 0.075
At store 2 10 2 5.85 23.40 0.62 14.51 5.7
Tie Bar 0.075 0.075
Along grid A,B,C,D 8 8 38 0.40 121.60 0.40 48.64 0.25
Along grid 1 2 8 38 0.40 30.40 0.40 12.16
Along grid 2 2 8 38 0.40 30.40 0.40 12.16
At store 2 8 38 0.40 30.40 0.40 12.16
10 Vertical Bands
10.1 Ground Floor 4
Main Bar 10 2 2.50 20.00 0.62 12.40
Tie Bar 8 17 0.40 27.20 0.40 10.88
Total 24821.53
24.82 Mt.
Site
S. No. Description G.F F.F S.F Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1.00 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 52.00 r.m
copper conductor wires
-3.62
Brick masonry work below plinth tie beam
Room 1 5.00 3.20 0.18 2.80
Corridoor 1 5.00 2.20 0.18 1.93
Total 63.21 Cu.m
2 Concrete Works
2.1 PCC
2.1.1 P.C.C.(1:3:6) Works
For Footing 1
P.C.C. for isolated footing(F1) 6 1.00 1.00 0.10 0.60
Septic Tank
1 5.50 2.25 0.08 0.99
Sewer Manhole
Bottom 1 1.00 Area 0.10 0.10
Waste water Chamber 0.00
Bottom 2 1.00 1.00 0.10 0.20
Total 2.49 Cu.m
Beam
Foundation Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Along grid B/(1,2) 1 3.20 0.25 0.30 0.24
Tie Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Along grid B(1,2) 1 3.20 0.25 0.30 0.24
Column
Column up to plinth level 6 0.30 0.30 1.00 0.54
Column from plinth to top 6 0.30 0.30 3.00 1.62
Slab
Slab of first floor 1 4.75 2.25 0.15 1.60
Lintel Bands
For first floor
Along grid 1 1 4.70 0.125 0.25 0.15
Along grid 2 1 4.70 0.125 0.25 0.15
Along grid 3 1 4.70 0.125 0.25 0.15
Along grid A 1 5.40 0.125 0.25 0.17
Along grid B 1 3.20 0.125 0.25 0.10
Along the partition wall 1 3.25 0.125 0.25 0.10
For the partition wall 1 2.77 0.125 0.13 0.04
Soak Pit
RCC slab 1 1.13 Area 0.12 0.14
Sewer Manhole
Top Cover 1 1.00 1.00 0.10 0.10
Waste Water Chamber
Top Cover 2 1.00 1.00 0.10 0.20
Total 16.46 Cu.m
2.5 Formworks
Foundation
Isolated footing (F1) 6 4.00 0.20 4.80
Beam
Foundation Beam
Along grid 1 1 4.70 0.50 2.35
Along grid 2 1 4.70 0.50 2.35
Along grid 3 1 4.70 0.50 2.35
Along grid A 1 5.40 0.50 2.70
Along grid B/(1,2) 1 3.20 0.50 1.60
Tie Beam
Along grid 1 1 4.70 0.60 2.82
Along grid 2 1 4.70 0.60 2.82
Along grid 3 1 4.70 0.60 2.82
Along grid A 1 5.40 0.60 3.24
Along grid B/(2,3) 1 2.20 1.18 2.60
Column
Column up to plinth level 6 1.00 1.20 7.20
Column from plinth to top 6 3.00 1.20 21.60
Slab
Along corridor 1 4.75 2.25 10.69
Lintel Bands
Along grid 1 2 4.70 0.125 1.18
Along grid 2 2 4.70 0.125 1.18
Along grid 3 2 4.70 0.125 1.18
Along grid A 2 5.40 0.125 1.35
Along grid B 2 3.20 0.125 0.80
Along partition walls 1 2.77 0.125 0.35
Sewer Manhole
Top Cover 1 0.60 Area 0.60
5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilets ( Female) 1
At corridor 1 5.30 1.20 6.36
At Ramp 1 5.60 1.20 6.72
Along the terrace 1 4.75 2.25 10.69
step 1 0.30 1.20 0.36
Inside the room 1 3.23 2.00 6.45
1 3.23 2.50 8.06
At Doors 1 1.90 0.25 0.48
Along the water trough 1 3.45 0.7 2.42
Total 41.53 sq.m
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Toilets ( Female) 1
Along grid A & B 2 3.20 1.80 11.52
Along A 1 2.20 3.00 6.60
Along grid 1 1 4.70 1.80 8.46
Along grid 2 1 2.55 1.80 4.59
On partition wall 2 3.25 1.80 11.70
Long wall 1 1.63 1.80 2.93
1 1.88 1.80 3.38
Short wall 2 0.43 1.80 1.53
Deduction
V1 -1 3.48 0.38 -0.65
V2 -1 3.48 0.33 -0.56
V3 -1 1.98 0.38 -0.37
V4 -1 1.98 0.33 -0.32
D1 -1 1.00 0.90 -0.45
D2 -1 0.90 0.90 -0.41
8 MISCELLANOUS
8.2 Cement Board
For Partition
2.00 1.69 Area 3.37
Total 3.38 sq.m
900
a. Along Y-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
900
b. Along X-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
B. Column-MAIN BAR
465
4251
a. Longitudinal bar upto full height 12 - 6 8 5160 247.68 0.889 220.16
100 344
STIRRUPS FOR COLUMN SIZE 300 x 300 upto Plinth Height-
220
80
1
160 6
80 0
c Stirrups 8 100 6 11 800 52.8 0.395 20.86
1
6 160
0
C Column (300*300)
220
80
a Stirrups for Column upto floor Height 220 8 125 6 25 1040 156 0.395 61.63
1
160 6
80 0
b " 8 125 6 25 800 120 0.395 47.41
1
6 160
0
D BEAM
1 Foundation Beam (250*250)
5000
a Along Grid-1,2 & 3- Top Bar 720 720 12 3 3 6440 57.96 0.889 51.52
b Along Grid--1,2 & 3-Bottom Bar 720 12 3 3 6440 57.96 0.889 51.52
5000 720
6000
c Along Grid-A & B-Top Bar 720 12 3 3 7440 66.96 0.889 59.52
720
200
80
e Stirrups Along Grid 1, 2 & 3 8 150 3 34 960 97.92 0.395 38.69
200
200
80
f Stirrups Along A & B 8 150 2 40 960 76.8 0.395 30.35
200
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
5000
a. Along Grid-1 -Top Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
b 720 12 1 1 6440 6.44 0.889 5.73
720
5000
c Along Grid-1 -Bottom Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
d 720 12 1 1 6440 6.44 0.889 5.73
720
e Along Grid-2 & 3-Top Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
g Along Grid-2 & 3-Bottom Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
6000
i Along Grid-A & B-Top Bar 12 2 3 7440 44.64 0.889 39.68
720 720
j Along Grid-A & B-Bottom Bar 720 12 2 4 7440 59.52 0.889 52.91
6000 720
200
80
200
80
3 FLOOR BEAM
LONGITUDINAL BARS
Along Grid 1,2&3
5200
a Top Bars 870 16 3 2 6940 41.64 1.580 65.81
870
5200
b Top Bars 12 3 1 6380 19.14 0.889 17.02
590 590
6200
e Top Bars 12 2 3 7380 44.28 0.889 39.36
590 590
STIRRUPS
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
200
8
0
g Stirrups for Beam Size 250*400 350 8 125 1 93 1260 117.18 0.395 46.30
200
80
h Stirrups for Beam Size 250*450 400 8 125 1 124 1360 168.64 0.395 66.63
E SLAB
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
850 850
a Main Bars Short Span 100 10 150 1 33 4600 151.8 0.617 93.71
100 2700
1475 1475
b Main Bars Long Span 100 10 150 1 16 8350 133.6 0.617 82.47
5200 100
220
80
1
160 6
80 0
b Stirrups 8 125 6 21 800 100.8 0.395 39.83
1
6 160
0
G SOAKPIT
d=1850+Ld
d=1450+Ld
c Main Bar Along both Direction 8 200 1 2 1650 3.3 0.395 1.31
1650
h Top Bar Along Radial Direction 8 200 1 8 425 3.4 0.395 1.35
425
H SEPTIC TANK
200
6
a Stirrups for Concealed Beam 5 8 150 1 13 670 8.71 0.395 3.45
70
1850
b 10Ø Longitudional Bar for CB-Top Bar 10 1 2 1970 3.94 0.617 2.44
60
60
c 10Ø Longitudional Bar for CB-Bottom Bar 10 1 2 1970 3.94 0.617 2.44
60 1850
60
Bed RCC Bars
d Bottom Mesh Bar-Along Length Wise 8 200 1 12 5550 66.6 0.395 26.32
50 5450
50
e Bottom Mesh Bar-Along WIdth Wise 8 200 1 28 2300 64.4 0.395 25.45
50 2200 50
f Septic Tank Slab Cover
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
1215 1475
j 8Ø Bottom bar along Length wise 8 1 9 7650 68.85 0.395 27.20
60 4840 60
1215
k 8 1 4 3780 15.12 0.395 5.98
60 2445 60
1
n Top Bars-Along Width Wise 0 8 1 8 620 4.96 0.395 1.96
0 520
I SILL BAND
Longitudinal Bars
3400 75
800
800
a Grid 1/A-B ,Grid 3/A-B 10 75 2 2 6350 25.4 0.617 15.68
75 600 600
1175 75
1700
b Grid 2/A-B 10 1 2 2950 5.9 0.617 3.65
75
2650 75
425
425
c Grid A/1-2, B/1-2 10 2 2 4950 19.8 0.617 12.23
75
75 600 600
2150 75
175
175
d Grid A/2-3 10 1 2 3850 7.7 0.617 4.76
75
75 600 600
e Partition Wall between Grid A & Grid B 10 1 2 3600 7.2 0.617 4.45
3600
Ties
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 20 320 6.4 0.395 2.53
190
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 9 170 1.53 0.395 0.61
70
50 50
o Partition Wall between along D3 8 150 1 7 170 1.19 0.395 0.48
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
J Lintel Band
Longitudinal Bars
3400 75
800
800
3400 75
800
800
2650 75
425
425
2150 75
175
175
e Partition Wall between Grid A & Grid B 10 1 2 3700 7.4 0.617 4.57
3600
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 33 320 10.56 0.395 4.18
190
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 10 170 1.7 0.395 0.68
70
50 50
o Partition Wall between along D3 8 150 1 21 170 3.57 0.395 1.42
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
K Wash Basin Slab
Left Portion
M INCINERATOR
a 630*505 Grill Mesh
Approved By:
Prepared and Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,T(S)F
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha
Toilet
S. No. Description Quantity Unit Remarks
Block
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 1 1.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS nos.
1.4 Stand Alone 6 A DP MCB with Enclosure 1.00 1.00 nos.
3.1 One Way Light Point 5.00 5.00 pts.
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan 2 2.00 no.
7 Light Fixtures/Luminaires & Accessories
7.5 7W LED Wall Light 1.00 1.00 no.
7.6 9W LED Surface Mounted Cylindrical type 1.00 1.00 no.
7.7 6W LED Recessed Mounted Circular type 3.00 3.00 no.
7.8 7W LED T5 Slim Mirror Light 1.00 1.00 no.
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.60 0.60 0.05 0.04
2 0.175 0.05 0.02
Total 0.99 cu.m
4 Flooring Works
4.1 Neat Cement Skirting works
Gate Column 2 2.36 4.72
Total 4.72 r.m
5 Metal Works
5.1 Metal Works (Fence)
Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 115 230.00 2.40 552.00
ISA 50x50x5mm 51 1.90 96.90 3.80 368.22
Bracings 19 2.5 47.50 2.40 114.00
Sub Entrance Gate
ISA 40x40x4mm 3 1.5 4.50 2.40 10.80
ISA 50x50x5mm 2 1.90 3.80 3.80 14.44
8 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
220
8 mm dia at 150 c/c for
c 7
8 150 2 26 1030 53.56 0.40 21.16
column stirrups-Outer 5 220
1
7
7 3
8 mm dia at 150 c/c for 5
d 8 150 2 26 842 43.784 0.40 17.3
column stirrups-Outer
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.5296
3.02 3.02
0.3 0.3
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05