Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
GENERAL -
MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 0.00 - 100.00%
Mobilization of the construction by constructing
temporary
SITE OFFICE acomodation
ESTABLISHMENT for labours and site staff with Per
2 required 16.00 25,000.00 400,000.00 16.00 400,000.00 16.00 400,000.00 0.00 - 100.00%
Providingsuitable facilities andSite
and Maintaining keeping
Officetheofsame two inRoomsgood Month
hygenic
having totalcondition
Area 20 for sq.mentireforproject
the use completion
of Clienttime. and
PROJECT INFORMATION BOARD
3 Demolition including
Consultant of the same and cleaning
Table, the site afterfile nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
Providing and Fixing office of Projectchair,Information Lockable
board with
completion
cabinet, of the Items
Stationery construction activities all complete.
approved SIGN
SAFETY Text BOARD in appropriate location including all1
(Ink, Paper, Pen, Pencils etc.),
4 [Note: 50% and
Computer payment
1 Printer shallwithbe madeall after completion
necessary set up. all of nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
required
Providingfixing
and and accessories
Fixing of Safetyas per drawing
Sign Board all complete.
with approved
mobilization
complete as per remaining
instruction 50%
of engineer. afterThecompletion
Specification of
Text and
BARRICADING
works as Sinage
per including
contract]WORKS required fixing accessories as
5 of computer shall not be less than (19.5" led monitor with R.m 75.00 2,000.00 150,000.00 73.00 146,000.00 73.00 146,000.00 0.00 - 97.33%
per drawing all
Barricading complete.
Core i5, 7th between
Generation, the 500School
gb Hdd,Academic
8gb ddrarea and
4 ram),
Construction
Printer shouldarea
DISMANTLING with
function OF at1.8 m of
COMPLETELY
least high CGI Sheet
Printing, DAMAGED
Scanning fixedand to
6 Bamboo support of sq.m 423.63 3,000.00 1,270,890.00 416.00 1,248,000.00 416.00 1,248,000.00 0.00 - 98.20%
BUILDING
Photocopy of frame A4 size all complete
documents. as perProviding
instructionand
Engineer.
Demolition
Maintaining of
all existing
above items damaged
on Rental building
Basissafely and
for entire
SAFETY MATERIALS & SITE SAFETY
7 handover of theMaintaining
reusable
time. materials to the school L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
project completion
Providing and Construction Safety authority,
Measures
storing them
in Construction OF to the location
SiteEXISTING shown
with properTLC by the school
Safety measures to and
RELOCATING
8 disposing
person and debris workExistingincluding
area (Helmet, transportation FirstofAid
Shoes,Learning debris
Kit, sq.m 423.63 3,000.00 1,270,890.00 318.00 954,000.00 318.00 954,000.00 0.00 - 75.07%
Relocating of Temporary Centre
,cleaning site
Clothing, Glove, etc. Guard
as per Rail specification
for and instruction of
(TLC),TEST(WATER
LAB from constructionTEST) siteedgeto protection,
other place Safetyby
9 Engineer.
Net, Safety rope, Fall Protection etc.) as required byfrom
the job 1.00 - - - - - 0.00 -
Demolition
Testing and and using
Providing existing
Lab Testmaterials
Report for obtained
Quality of
Contract
demolition Clause
of TLC GCCto the24 anddecided
place Specification division 1
Water
TEMPORARYin Water Stream
TOILET (Up and Downbystreem) SMC. located
10 "GENERAL
near by Construction
REQUIREMENT
sitetoilet
before
CLAUSE 8(C)". The nos.
Starting and after 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 0.00 - 100.00%
Construction
number of ofSafety temporary Materials with CGI Sheet
Personal fixed
Protecting to
completion
Bamboo of construction
support work. This items
Test has to be
ROAD
EquipmentsREPAIR (PPE)frameAND and all
shallMAINTENANCE
be minimumnecesary including
but not limited to
11 done
Septic to mark the affect of construction work in water Km. 24.00 50,000.00 1,200,000.00 24.00 1,200,000.00 24.00 1,200,000.00 0.00 - 100.00%
35 sets.pit,
Providing Pipeline,
and
Payment shall Toilet
Maintaining be made Pan etc. for
thein roads
Prorata entire
asBasis forproject
necessary entireto
stream.
completion timeby all completeandasRockfall per Instruction of
avoid
durationblockage
of project. Landslides for regular -
Engineer.
transport Rate
of shall include
construction all Material
materials and cost
site with fixing,
inspection
CIVIL WORKS-
construction BUILDING -
during overallchargesconstructionand demolition
period. Rate & shall
cleaningincludeof the
all
1 same
EARTH after
Material cost completion
WORKS with demolition of thecharges,
construction
cleaning,activities
fixing all& -
complete. charges of the same after completion of the
construction
SITE CLEARANCE & MOBILIZATION:
1.1 construction
Clearing and grubbing the site for construction by sq.m
activities all complete. 784.21 100.00 78,421.00 725.31 72,531.10 711.25 71,125.00 14.06 1,406.10 92.49%
removing
EARTHWORK 150mmIN thick top soil including
EXCAVATION : bushes, small
1.2 trees, leveling of undulated ground, shorting and cu.m 420.89 400.00 168,356.00 405.75 162,299.81 415.95 166,378.39 -10.20 (4,078.58) 96.40%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected
trenches, top soilpits
footing, for etc.
reusetointhe landscaping
required
EARTH BACK FILLING :
1.3 works, disposing
depth filling
including unsuitable materials
dewatering bysides
manual from or site, etc., all cu.m
mechanical 257.25 300.00 77,175.00 264.65 79,395.74 222.80 66,840.00 41.85 12,555.74 102.88%
Back
complete in
asasper foundation
drawings, and
specifications of foundation
and instructions with
means
approvedetc. soil obtained from the excavation at site own
per specifications with all contractor’s and
of the Engineer.
machinery and equipment's, providing crossing of track,
stacked at site or brought from outside in layer not
shoring, strutting,
exceeding 15 cm thick timbering
(compacted andthickness)
buttressing with
including
appropriate materials and all such measuresline necessary to
Preparedtransportation
by contractor
retain in position
of soil, spreading
the sidescompacting
in required
ofChecked
the foundation
and level,
by Consultant,
pit and DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
sprinkling water, ramming, with mechanical
including refilling the excavated material with watering,
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
BOULDER SOLING :
1.4 cu.m 121.63 6,000.00 729,780.00 124.54 747,254.73 136.66 819,945.51 -12.12 (72,690.78) 102.39%
Providing and laying uncoursed hand packed Dry Rubble
Stone soling
SAND FILLING in foundation,
: under floor plinth with out
1.5 any special dressing of stone including filling interstices cu.m 7.40 6,000.00 44,400.00 7.07 42,420.00 7.07 42,420.00 95.54%
Providing and filling sand in soak pit. all complete as per
with suitable
drawings, quarry waste
specifications andorinstruction
stone chips of or
thequarry
Engineer. sand,
2. CONCRETE WORKS
2.1 watering, compacting using appropriate mechanical cu.m 19.06 14,000.00 266,840.00 19.66 275,252.18 19.38 271,322.63 0.28 3,929.56 103.15%
2.1 P.C.C
compaction means with all contractors materials,
P.C.C
P.C.C (1:3:6)
(1:2:4) WORKS
2.1.2 handling,
Providing and
placing
and laying
etc. all complete as per drawings,
laying machinemachine mixed Plain Plain Cement
Cement cu.m 31.01 16,000.00 496,160.00 28.18 450,885.24 22.93 366,937.32 5.25 83,947.92 90.87%
Providing
specifications and instruction ofmixed the Engineer. The
Concrete of
Concrete of nominal
nominal mix mix 1:2:41:3:6 (1 cementcement :: 2 3 sand
sand :: 4 6
P.C.C.
complete FORitemR.C.C.
including WORKSall lead :&(1lift.
2.2 coarse aggregate ) for leveling course in foundations and
coarse aggregate ) for leveling course in foundations cu.m 392.66 20,000.00 7,853,200.00 394.59 7,891,802.99 402.03 8,040,627.78 -7.44 (148,824.79) 100.49%
Providing and laying in position machine mixed and and
under floor
under floor of building,
of building, etc. in all
etc. concrete level
in all levelofwith with broken stone
machine
SILICA CEMENT vibrated cement
ADMIXTURE mixbroken
1:1.5:3 stone
(1
2.3 aggregate
aggregate of
cement:1.5 ofsand:size
size not not
3 coarse
more than
than 25
more aggregate) 25 mm mm M20
of approved
of grade
approved kg 3,926.60 300.00 1,177,980.00 3,945.91 1,183,773.29 4,020.31 1,206,093.64 -74.40 (22,320.35) 100.49%
Providing
quality includingand mixing
including Silica Cement
formwork wherever Admixture of for
necessary, in
quality
reinforcedconcrete
cement concrete formwork work wherever
using approved necessary,
cement
structural
STEEL
dewatering, REINFORCEMENT
batching, at themixing,
rate of 2.50% by weightplacing,
transporting, of the
dewatering,
with 20 for
2.4 cement batching,
mmpromoting
graded machine mixing, transporting,
crushedimproving
stone aggregate placing,of Mt. 62.84 130,000.00 8,169,200.00 57.05 7,417,069.15 56.42 7,333,970.88 0.64 83,098.27 90.79%
Providing and fixing workability,
in position Fe lift,500 strength,
compacting,
compacting,quality
approved
curing,
curing, including
inincluding
various
all lead
lead and
alllocations and lift, etc.steel
etc. all
all
achieving
reinforcement waterproofing properties, bleedingand heights
prevention,
complete
FORM
completeWORKS
including as ofper
as pervarious
transportation
diameter
drawings,
drawings,
of
confirming
specifications
specifications
concrete to site
toand
of
relevant
and the
the
placing,
etc.
2.5 IS Silica
code
instructions Cement
in R.C.C.
of the Admixture
works
Engineer. including shall be the product
straightening, of
cutting, sq.m 2,508.65 800.00 2,006,920.00 2,465.09 1,972,070.93 2,555.48 2,044,384.28 -90.39 (72,313.35) 98.26%
Supplying
instructions
compaction, and
of thelaying
finished Engineer. centering,
to required shuttering of various
Silica
bending, Japan or superior
binding with 20 and SWGshalllinemeet andthe
annealed
level, protection
requirements
wire for tying
pattern
3.
andBRICK formworks
curing, MASONRY etc.inwithall 19/12
WORKS
completemm thick
as water
per proof
drawings, ply
as mentioned
the reinforcement specification
bars props
at each of materials and
3.1 wood
BRICK & steel
MASONRY
specifications adjustable
and the WORKS forjunctions
instructions (all1ofkindsc/sof
: Works,
4the
(binding
RCC works
) ONE
Engineer,
wire
SIDEbut cu.m 103.87 20,000.00 2,077,400.00 - - - - 0.00 -
Workmanship,
shall not be measured Division – 4: Concrete
separately) allArticle 2.4
for foundations,
FAIRFACE
excluding the cost columns, shearincluding
of centering, walls, wasteslab,
beams,
shuttering,
and
and
cut pieces,
staircase, provision
lintel, sill, for adequate
pergola, including numbers nails,of spacers,
propping
Providing
reinforcement,
CLEAR and
SILICON laying
all first class
complete selected
as factory
per pressed
drawings,
chairs, providing
scaffolding, staging, andWATER-REPELLANT
placing cement
supporting mortar
andEngineer.
bracing COATNG
(1:1)
in one cover
proper
7.2.3 wire cut Fair
specifications
Providing
blocksand
lines andand
to level,
keep
Face
the
sealing
brick
instructions
Applying
bars in Water
(machine
of the
intended
made
Repellant
position
brick)
Coating
at all brown
or
on
levels sq.m 592.09 550.00 325,649.50 - - - - 0.00 -
more brick
Exposed Brick wall inthe
thickSurface using
joints mortar
cement with
Silicone
heavy
1:4 (1
Base
dutycement :
MC-Nisiwa
all adhesive
self complete tape, as aligning
per drawings, to line andspecifications
levels including and
4coarse
SH sand) in ,superstructure
or equivalent and other specified places
instructions
POINTING ofWORKthe or INsuperior
Engineer. BRICK including
(Authorized
MASONRY cleaning
lap length brick
and
Ties,
in all PVC
heights Spacer,and Providing
level openings/
including cutouts/
the cost of Providing
pockets,
single or
8.1.1 surface
for
and the
applying
multi
using
bar
applying
stage
brick
lengthat all
De-shuttering
self
cleaning
exceeding
standing
chemical,
10
levelschemical, meterWorks
Pointing
scaffolding,
insingle
lengthinorshall
De-shuttering
soaking
multi-
Cement be
as
bricks, sq.m 592.09 400.00 236,836.00 - - - - 0.00 -
stage
measured
Mortar scaffolding,
1:2
approvedraking for the
(1 etc.
payment,
cement
by thejoints,Engineer all
:2 complete
except
fine sand)to
etc., completeason per
column).
the manufacturer's
face of
at all openings,brick
levels as
curing,
instruction, project provision
specification for recesses,
andinstructions
instruction of the
masonry
per
BOQdrawing,
toothing wallof
Total
etc., including
items
all 3.1.,mixing
specifications
complete 7.2.3
as per&mortar,
and 8.1.1: laying
drawing, in ofperfect
specifications the - - - - - 0.00 -
Engineer.
line, level
Engineer. and plumb and finishing in regular and even
and instructions
Replaced items of 3.1,the7.2.3
Engineer.
and 8.1.1 with following
surface ,all complete as per drawing , specification and - - - - - 0.00 -
items for 3-9C(XS)-A, 2-LiAC(S1) and T(S)F
instruction of the Engineer.
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - - - - - 0.00 -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - - - - - 0.00 -
Exterior Weather Coat Paint sq.m 350.00 - - - - - 0.00 -
- - - - 0.00 -
BRICK MASONRY WORKS ( 1 : 4 c/s )
3.2 cu.m 90.07 18,000.00 1,621,260.00 203.43 3,661,796.94 192.28 3,461,113.15 11.15 200,683.80 225.86%
Providing and laying first class chimney fired brick one
or more brick
HALF BRICK thickWORKS
wall in cement ( 1 : 4mortar c/s )1:4 (1 cement
Providing and:
3.3 4 coarse sand) in foundation up to plinth, superstructure sq.m 84.14 1,500.00 126,210.00 48.06 72,086.25 33.07 49,605.00 14.99 22,481.25 57.12%
laying non-fairfaced half brick work masonry in cement
and
mortar other
1:4 specified
(1 cement:4 places in inall superstructure
heights and level
HONEY COMB BRICK sand) WORKS (1:3 c/s) with
including the cost of single or multi stagelinescaffolding,
3.4 approved first class fired bricks
Providing in laying
and perfect honey&comb level, cu.m 4.52 9,000.00 40,680.00 4.52 40,680.00 0.24 2,160.00 4.28 38,520.00 100.00%
soaking
required bricks, curing, raking joints, provision for
brick onesize
or moreand shape at anywall
brick thick height and level,
in cement mortarincluding
1:3
recesses,
the cost of openings,
single ortoothing
multi etc., scaffolding,
stage all completecleaning, as per
(1 DOORS
4. cement : 3& coarse
WINDOWS sand) inWORKS
soak pit in all heights and
drawing,ofspecifications
4.1 soaking the bricks, and instructions of the Engineer.
level including
METAL FRAME the costpacking
of soaking of the joints,
bricks, raking
curing, joints,
raking -
provision
joints,
Providing for fixing
provision
and recesses,
for recesses, openings,
in position openings,
in requiredcuring,line providing
toothing etc.,level
and all
25x3mm
4.1.1 complete
Door
pressed FrameGI
as per
(folded) Straps Fixed
drawing,
Steel door toandcolumns
windowatand
specifications every
frame 5thsize
instructions
of course rm. 200.40 1,100.00 220,440.00 201.84 222,024.00 200.30 220,330.00 1.54 1,694.00 100.72%
of
4.1.2 shownbrick
Window
of the and 60mm
in Frame
Engineer.
drawings width 14 from
manufacture gaugegalvanized
welded GI ironmesh rm. 569.83 1,100.00 626,813.00 573.93 631,317.50 549.23 604,147.50 24.70 27,170.00 100.72%
4.2 anchored
METAL
sheet to GI
SHUTTER
of 1.20 mm strap,
thickallincluding
complete hinges, as per design,
jamb, lock drawing, - - - - - 0.00 -
specifications
jamb, head, SHUTTER instructions
base ties of 1.2 of the
mm pressedEngineer. GI welded
WINDOW Providing, fabrication and on
4.2.1 rigidly fixed together by mechanical means, adjustable sq.m 123.17 7,500.00 923,775.00 112.14 841,021.69 104.89 786,693.75 7.24 54,327.94 91.04%
installation in position 35 mm thick glazed window and
lugs
WOODEN with split
4.3 ventilator shutter endmade
SHUTTER tail towith
each1.2mm jamb including steel butt
thick galvanized iron - - - - - 0.00 -
hingesfolded
sheet 2.5 mm thick with
in required mortar
size and guards,
shape reinforcing
including to
glazing
FLUSH DOOR SHUTTER (32MM) Providing &
door 5hardware,
4.3.1 with mm thick strike-plate,
clear float shockwith
glass absorbers
glazing asbeads,
required, sq.m 77.04 8,000.00 616,320.00 70.06 560,469.60 77.04 616,320.00 -6.98 (55,850.40) 90.94%
fixing 32mm thick solid core flush door shutters, in
factory and
washer applied Zinc Rich Primer etc., all complete as
andper
single leaf
UPVC DOOR orspecial
doubleglazing
leaf asputty, required
per detailed numbers
drawing. The
drawings,
4.4.1 sizes specification and instruction of the Engineer.
flush hardware
doors shalllike
SHUTTER/FRAME be hinges,
factory tower-bolts,
made solid core handles,
blockeye- board sq.m 7.14 9,000.00 64,260.00 7.02 63,180.00 7.11 63,954.00 -0.09 (774.00) 98.32%
hook, applying
shutters bondedprimingwith coat formaldehyde
phenol with Zinc Richresin. Primer The of
WINDOW
approved Providing
make,GRILL and
etc., fixing
Providing,
all completeto MSdooras frames
solid
per bars24ofmm
drawings, thick
required
4.5 lipping
factory
size
shall be
andmade
fixing
specification PVC
and
of teakwood
door shutter
in instruction
position mild
all-round
of themade ofthe
steelEngineer.
grille
flushand
styles door
made with
with sq.m
rails 93.61 2,500.00 234,025.00 118.85 297,134.31 72.72 181,803.75 46.13 115,330.56 126.97%
a minimum
of UPVCMS thickness
hollow of 12mm. The
59 xfollowing C.P.
required flats,section
strips, ofbarssize fabricated 24 mmas perand wall
drawings,
fittings shall
thickness 2 mm be used: 0.2(a)
�using mm - 2-150 mm Handles
with inbuilt edging inoneach
both
fixing in position approved fasteners including 2
leaf; (b)
sides. Tower-bolt –rails
300 motred
mm long at jointed
top 1 inateachthe leaf
coat ofThe stylesand
enamel andZinc Rich Primer and base coat, etc., all
and 200 at bottom
corners byasmeans in each leaf;
of galvanized/plastic ( c ) 1 no. 300
brackets mm of long
size
complete detailed in drawing, specification and
C.P.
75 x Aldrops
220 mmofwith having Godrej made padlock;
wall thickness 1.0 mm (d)and
125stainless
mm
instructions the Engineer.
heavy duty GIThe
steel screws. Butstyles
Hinges 3 nos.
of the in each
shutter leaf. (rate
reinforced by shall
include allgalvanized
required door tube hardware).
Preparedinserting
by contractor of sizeChecked
20 x20 mm byand 1 mm
Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
� 0.1 mm wall thickness. The lock rail made of 'H'
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
COLLAPSIBLE GATE
4.6 Supplying and fixing in position local sq.m 20.35 10,000.00 203,500.00 20.50 205,025.00 20.50 205,000.00 0.00 25.00 100.75%
make collapsible gate of approved size and make
5. FLOORING WORKS
5.1 properly
HARDENED
fabricated with vertical double channels 20 x 10 sq.m
CEMENT CONCETE FLOOR 1,184.61 900.00 1,066,149.00 1,140.60 1,026,540.00 1,063.84 957,459.42 76.76 69,080.58 96.28%
x 2mm at 100mm centers and braced with M.S. flat
diagonal 20 x 5mm,SKIRTING with Providing,
top and bottom laying rails in required
of T iron line,
NEAT
level and CEMENT
pattern 40 mm thick IPS floor finish with
5.2 40 x 40 x
- do - asconcrete 6mm
above, but with 38mm
for 100 dia
mm steel
high pulleys
skirting. complete r.m 511.55 100.00 51,155.00 561.77 56,177.20 572.99 57,299.20 -11.22 (1,122.00) 109.82%
cement of mix 1:2:4
with bolts nuts locking arrangements steppers handles (1 cement : 2 sand : 4
crushed
TERRAZZO stone
including applying aggregate
CAST-IN a priming12SITU mm coat and
DADO down grade)
of Zinc Rich Primer laid in
5.3 Providing
alternate panel
carriage hoisting and layingorall providing
25 mmglass
complete thick
as per dividing
terrazzo strips
specification and
cast-in-situ and sq.m 37.83 1,500.00 56,745.00 40.28 60,412.50 32.88 49,320.00 7.40 11,092.50 106.46%
finished
dado
directionup to with
of the
theapproved
height
Engineer. floor in
shown hardener
drawing(Dreitop with marble FH of
6 ROOFING/
equivalent floorTERRACING
hardener) WORKS
applied
chips rubbed and polished to granolithic finish under as per manufacturer's -
instructions
METAL
layer of 19WORKS(TRUSS)
mmincluding
thick cement mixingconcrete Providing
laying in1:2:4 required
and (1 fixing slope, : 2
cement
6.1 tubular kg 4,292.26 220.00 944,297.20 4,755.64 1,046,240.81 4,653.04 1,023,668.99 102.60 22,571.82 110.80%
sand : 4roof
intrigal finishing
crushed trusses using
stone with rafters, purlins,
appropriate
aggregate 10power
mm and wind ties, grade)
trowelling
down
equipment,
brackets
base and etc.,
topetc. made
layer all ofcomplete
with
6 mm required as per
thick grade
withdrawing,mild specification
required steelcolor tubes
CGI
and mild SHEET
instructions ROOFING
steelofsectionsof thefrom Engineer.
of required
6.2 marble
Providing chips & fixing sizes precoated 1 mm tosizes,
galvanized 4 mmincludingnominal
iron profile size sq.m 269.28 2,000.00 538,560.00 269.78 539,560.00 269.15 538,291.20 0.63 1,268.80 100.19%
hoisting,
laid in cement fixing in position
marble powder with mix MS3:1 bed plates,
(3pitch
cement shoe
Terracota
CGI
angles, SHEET
anchorcolour sheets
ROOFING
bolts etc., (size,
and RIDGE shape
concrete andgrouting, of : 1
marble powder
6.3 corrugation as mix : 7 marble chips) by volume rm. 29.78 1,200.00 35,736.00 29.75 35,700.00 29.78 35,736.00 -0.03 (36.00) 99.90%
Providing
concreting
including nut
cement& approved
laying
bolts, by Engineer)
prefinished
fabrication,
slurry, required plain0.52
fixing
pigment, (colour
and mm
treated
grinding,
+/- 5%
matchingwith
total
to coated
tworoofing
coats of thickness
sheet) CGI
anticorrosive (TCT),
Sheet Base
Ridge
paints Material
allCover
complete Thickness
of etc.,
0.52astopermm +/-
GI FACIA
polishing, (EAVES)
buffing and Providing,
applying sealerfabrication
coat, required
all
6.4 5%(BMT) total of 0.50 mm, Zincand coating 120gsm ofasinstruction
per IS: 277 , kg 240.23 250.00 60,057.50 163.64 40,910.00 178.67 44,667.58 -15.03 (3,757.58) 68.12%
completeand coated
drawings,
size shape
as per thickness
specifications
and fixing
drawing, (TCT), Base
ininstructions
position
specification Material
1.2 the
mmEngineer.thick of GI
5-7
Rate microns
Thicknessshall epoxy
(BMT)
include ofprimer
0.50 mm
preparing onshop both
(Coatingside and
drawings, of
and thePrimer
sheet and
obtaining as cost
folded
the
CEMENT plates
Engineer. of size
BOARD shown
FALSE inCEILING
drawing including the
polyester
above)
6.5 fixing over top coat
orridge 15-18
with microns.
all required Sheet
fixing should have
accessories
Engineer's brackets, Client's
flats, approval,
screws,
Providing supplying,
painting
and fixing withatfabricating,
enamel
all with sq.m 219.53 1,600.00 351,248.00 218.61 349,776.00 218.61 349,776.00 0.00 - 99.58%
protective
like self
delivering guard
tapping film
site,screw,
atPrimer, ofclips,
hoisting 25and micronsfixingminimum
clamps, washer
in position, toheight
etc.all avoid6
Zinc
mm Rich
thick Cement required
Board false scaffolding
ceiling, to work
including at any
7. PLASTERING/
scratches
complete while
on building WALL
transportation
floors as as FINISHING
and
per should
design, WORKS
be supplied
drawing, in
temporary
7.1.1 height,
providing staging,
etc.,
and all preparation
fixing complete
of frame of surface,
work per
made applying
design, Zinc
drawing, sq.m 1,268.20 600.00 760,920.00 1,162.58 697,548.90 1,138.12 682,873.11 24.46 14,675.79 91.67%
7.1
singleCEMENT
length
specifications
Rich Primer ofup PLASTER
to 6coat
instructions
one meter of
before
WORKS
or as
the desired
Engineer. byofEngineer.
special The
specifications
sections power instructions
pressed from of MS theand oneGalvanized
Engineer.
sheet coat after erection
with
ON
sheet
ON INNER
shall
CEILING be WALL
fixed
(1:4) (1:6)self drilling /self tapping screws
using
including
7.1.2 zinc coating twoand coats of synthetic
consisting angleenamel hanger paint
ofall of approved sq.m
25x25x0.55 799.92 500.00 399,960.00 829.10 414,550.94 799.93 399,964.96 29.17 14,585.98 103.65%
of size (5.5x Providing
55mm) and
with applying
EPDM atsand
seal all levels and shape
make
of and
required
12.5.mm,
color
length
thick
etc. atall
cement
complete
1250mm
and
c/c as peretc.,
fixed
plaster
drawing, complete
work of
20
up
mix mm
to1:4any
specification
thick
(1pitch cement
cement
and
plaster
in instruction
horizontal/
& 4 sand)(1:6): inin building
vertical
of concrete
the ortoinside
Engineer.
purlins
curved
surface,
with
insurfaces
ceiling
7.1.3
nut ON
ans bolts OUTER and WALL
other end of rafters
angle hanger being fixed
7.1.3.1 specified
excluding cement
the
surface at all height cost mortar
of in
purlins, two layers and
including mixing mortar, laying in as 6 to
trusses 8 mmand thick sq.m 803.10 600.00 481,860.00 1,447.63 868,580.27 1,055.07 633,039.00 392.57 235,541.27 180.26%
EXTERNAL
with nut and PLASTER
bolts to GI main
final
including
perfect coatline,with
cutting
level1:6to (1size
and cement
plumband shape :6channel
and fine 45x18x0.6
sand)
wherever
finishing cement
in required.
regular
running
mortarand
7.1.3.2 at Providing and applying atceiling
all levels and shape
7.1.3.2
the
over the
even
do
rate as
of above
900mm
12 to 14 mm thick
surface
for
c/c Band
to which Plaster
1:6 (1 cement section
: or
6 coarse 0.55mmsand) rm. 471.82 100.00 47,182.00 - - - - 0.00 -
20
thickmm thick including
cement all necessary
plaster inwithbuilding singleexterior multi-stage
in of
underbottom
INTERNAL
scaffolding,
wedge
PALSTER
coat inproviding
all surface of 45mm
andatON all
fixing WALL
height tapered
(1:4)WITH
including
200cement
mm
flanges
wide mixing
24 gauge
specified
26mm each cementhaving mortar with
clips line,
of 2.3mm 1:6 (1 :6 fine sand)
7.1.4 CEMENT
mortar,
GIallChicken laying PUNNING
wire in perfect levelofat and 613mm
plumb with
and ceiling sq.m
12.5.mm, 35.21 700.00 24,647.00 35.66 24,962.00 35.66 24,962.00 0.00 - 101.28%
in
section
thick surface
and
cement at allmesh
perimeter
and height
sand
at junction
including
channels
plaster of 0.5mm
work of
R.C.C.
mixing
mix thick
1:4
and
mortar, 25mm
(1 laying
cement
finishing
masonry, in regular
making and
grooves even andsurface
recesses, including
throating, all
in
high
& perfect
having
4PAINTING
sand) line,
and level
flanges
3 mm and
of plumb
20mm
thick cement and and finishing
30mm
punning long,overin regular
theplaster
necessary
7.2
dusting, single
dripping, orwetting,
WORKS multi-stage curing, scaffolding,
protection, making
etc. all
and even surface including toall necessary single or
themulti-
7.2.1 perimeter
for water
grooves
DISTEMPER
complete
stage
of recesses,
as per
ceiling
tank,Septic
and PAINT
drawing
fixed
tank,Man
throating, wall/partition
, specificationhole e.t.cand
dusting, onwithconcrete
dripping,
instruction.
help sq.m 2,259.34 200.00 451,868.00 2,210.29 442,058.69 2,161.34 432,268.36 48.95 9,790.34 97.83%
of rawscaffolding,
surface,
wetting, plugs
ceiling
curing,
Providing at 450mm making
surface
protection,
and c/cgrooves
and
applying with
walltwo
providing
and recesses,
finished
surfaceor 25mm
at
chicken
more all long
height
wire
coats mesh
of
[Rate
throating,shall also
dusting, include
dripping,for providing
wetting, drips
curing, band, moulds,
protection,
drive
including
at the
washable all screws
junctionmixing
distemper of @ 230mm
mortar,
concrete
paint interval,
laying
and
ofat in
masonry
approved jointing
perfect etc.,
manufacturer and
line,
all fixing
level
complete and
and to
groove, chicken
EXTERIOR
providing chicken wire
WEATHER wire meshmesh COAT junction
at the PAINTof RCC
junction of andconcrete
in required
plumb
as per overandetc.,
drawing apattern,
finishing finished
in regular
, specification with and recommended
even surface of filler,
including
7.2..2 shade
masonry,
and masonry coat
to
etc., of alkali
complete
Providing
allorcomplete theand
resistantworks
andper
as
instruction
cement
at
applyingany
drawing primer
heights.
two the
orofmore sq.m
, cutouts 841.27 350.00 294,444.50 1,447.64 506,675.14 1,055.07 369,272.75 392.58 137,402.39 172.08%
making
all necessary
Engineer.
approved openings
[Rate single
manufacturer for
shall light
alsoas fittings,
multi-stage
include
per access
scaffolding,
for
manufacturer's panel,
providing drips
coats of
specification
made with first quality
and of hundred of
instruction percent
the acrylic
Engineer. paint
[Rate ofshall
providing
band, moulds, , frame
makinggroove, perimeter
thegrooves chicken ofchannels
and recesses,
wire mesh suitably
throating,
at junctionfixed all
specifications
approved
also
ENAMEL
completeinclude shade
as fortoproviding
PAINT
per and
drawing
surface
pattern and to
drips wall,
theband,
specification
ceiling,
exterior
moulds, beams
walls of of
groove,
andcomplete
direction
dusting,
RCC anddripping,
columns, masonry,
canopies, wetting,
etc., to
staircase, curing,
complete
lobbies protection,
the
etc., works
all etc.
at anyall as
buildings
chicken
7.2.4 complete
of the etc.,
wire
Providing
Engineer The
mesh and
but rates
at
applying
excludingshall
junction include
byof spray/brush
the RCC
cost of for
and scrapping
masonry,
two or more
painting. , etc., sq.m 592.09 400.00 236,836.00 645.05 258,020.00 638.20 255,279.92 6.85 2,740.08 108.94%
heights].
per drawings, as per drawing
specifications , specification
and instruction. and instruction.
Theofrates
washing
to complete
coats of thequality
1st surface
the works with atfor
synthetic water,
any applying
heights.
enamel paint aofcoatapproved
[Rate
shall shall
include alsoforinclude
scraping, providing
washing the drips
surface band, with moulds,
approved
manufacturer quality (Asian, waterBerger base cement
or primer,
equivalent) surface
over wooden
8 MISCELLANEOUS
groove,
water, etc., topreparation,
surface complete thescaffolding works at any etc.,asheights.
all -
preparation,
or metal surface scaffolding
in required etc.,shade all complete
at any height, percomplete
the
shape,
CEMENT
as
manufacturer's BOARD
per the manufacturer's WALL
recommendations recommendations and as approved and as by the
8.2 including surface preparation, fillers/putty,
Supplying, fabrication, fixing of scaffolding, sq.m 29.23 6,500.00 189,995.00 24.12 156,780.00 29.19 189,735.00 -5.07 (32,955.00) 82.52%
approved by the Engineer.
Engineer.
protection
cement board etc.inallposition
complete forasinternal
per drawings,
anddesignexternal made
RAILING
specifications Providing,
and fabrication
instructions. as per
The finished drawings
8.3 with
and 9mm thick
installation cement
in position board Mild (Shera
Steelor Siamsurface
railing Cement
in staircase,
shall kg 2,194.73 220.00 482,840.60 2,336.28 513,981.60 2,066.83 454,703.01 269.45 59,278.59 106.45%
give
Board even and uniform
or equivalent) fromsurface.
both sides fixed to to required
75mm X
verandah
PUMP SHEDand other areas including cutting
8.4 0.6mm
shape and thick size, C-stud
welding fixed to U-Track
joints, installation with of spacing
base1m anchor nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 0.00 - 100.00%
Supply,
300mmofo/c fabrication,
of horizontal installation
frame, of 2mx1.5m
central core filled and with high
plates
pump shed appropriate
made with size with required
50x50x6 MS Angle numbersframe of , density
SEWER,
cement mortarRAIN with AND PE WASTE
granules WATER
having combined
8.5 expansion
covered
INSTALLATION
approximately
bolts of
outside 900andrequired
roof with
kg/m3,
size,CGI
including
providing
sheet,
sealing
required door,
locakable
joints
size
with R.m 44.26 1,500.00 66,390.00 39.10 58,650.00 38.50 57,750.00 0.60 900.00 88.34%
bends,
including finishing weld joints to(1:2:4)
produce smooth surface,
PVC
fiber SWRpad
tapes and lock,
(Soil, joint base
Waste,sealing PCC
Rain) pipes with
compound, 75mm allall
filling complete
necessary
screw
applying
as per one coat
design, drawing, of Metal and Primer
instructions and two of or more
the Engineer. coats - - 0.00 -
ring
heads gaskets,
as per PVC fittings, including
manufacturer's installation MSguidelines,
clamps,
of enamel paint of required shade, etc., all complete as
C ELECTRICAL
hangers,
sealing cutting, WORKS
perimeter jointing,
gaps with sealing,
silicon installation
sealant, etc., ofall pipes - - 0.00 -
per drawings, specifications and instruction of the
A. and specials
complete as
Common Installation including
per drawing, making holes
specifications and andcutting grooves
instructions - - 0.00 -
Engineer.
1.1 on
of walls
the or
Engineer. floor and
Rate
Stand Alone 40 A DP MCB with Enclosure repairing
shall include the same
the to
cost its
of original
metal no. 2.00 12,000.00 24,000.00 2.00 24,000.00 2.00 24,000.00 0.00 - 100.00%
1.2 finish.
StandPipes
framing, jointtoand
Alone 6be A installed
screw
DP MCB head onwith trenches
sealing,Enclosure or wallsadditional
required or floor no. 1.00 8,500.00 8,500.00 1.00 8,500.00 1.00 8,500.00 0.00 - 100.00%
or duct as per drawings,
strengthening member for specifications,
the wall length manufacturer's
exceeding 3
2 CABLES & WIRES - - 0.00 -
recommendations,
meter in length or around instructions,door and cleaning
window of the system,
opening,
testing
sealing and perimeterready for withoperation.
silicon sealant. The rate shallfinished
Total includewall for
all labour 93
thickness andmm. materials required. The measurement shall
be done
8.2.1 FOR forPARTITION
running meters, fittings etc not payable
seperately.
Prepared- by contractor
110 mm ED 6 kg/sqcm
Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 0.00 - 100.00%
3 Hybrid Inverter nos. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
D Fire Extinguisher - - 0.00 -
a ABC Stored Pressure 5.0kg size nos. 6.00 8,000.00 48,000.00 6.00 48,000.00 6.00 48,000.00 0.00 - 100.00%
b Dry Powder Fire Extinguisher nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
- - 0.00 -
D SANITARY WORKS - - 0.00 -
1 WATER SUPPLY INSTALLATION - - 0.00 -
a CPVC pipes SDR-11 - - 0.00 -
40 mm r.m 64.00 1,600.00 60.00 96,000.00 60.00 96,000.00 0.00 - 93.75%
25mm r.m 10.00 1,000.00 10,000.00 9.00 9,000.00 9.00 9,000.00 0.00 - 90.00%
20mm r.m 11.00 700.00 7,700.00 9.00 6,300.00 9.00 6,300.00 0.00 - 81.82%
15mm r.m 5.00 500.00 2,500.00 5.00 2,500.00 5.00 2,500.00 0.00 - 100.00%
c CPVC Ball Valve - - 0.00 -
40 mm nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 0.00 - 100.00%
25 mm nos. 3.00 900.00 2,700.00 3.00 2,700.00 3.00 2,700.00 0.00 - 100.00%
20 mm nos. 2.00 400.00 800.00 2.00 800.00 2.00 800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation - - 0.00 -
110 mm r.m 46.00 1,400.00 64,400.00 45.00 63,000.00 45.00 63,000.00 0.00 - 97.83%
75mm r.m 27.00 1,200.00 32,400.00 25.00 30,000.00 25.00 30,000.00 0.00 - 92.59%
50mm r.m 7.00 350.00 2,450.00 5.00 1,750.00 5.00 1,750.00 0.00 - 71.43%
B School Blocks - - 0.00 -
1 Sanitary Installation - - 0.00 -
a Kitchen Sink set 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 0.00 - 100.00%
b PVC Multi Floor Trap no. 1.00 600.00 600.00 1.00 600.00 1.00 600.00 0.00 - 100.00%
2 Sanitary Installation - - 0.00 -
a Water Closet Set set 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
b Orissa Pan set 2.00 3,100.00 6,200.00 2.00 6,200.00 2.00 6,200.00 0.00 - 100.00%
c Hand Wash Basin set 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 11,000.00 22,000.00 2.00 22,000.00 2.00 22,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 6.00 4,000.00 24,000.00 6.00 24,000.00 6.00 24,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 2.00 2,500.00 5,000.00 2.00 5,000.00 2.00 5,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 1.00 2,600.00 2,600.00 1.00 2,600.00 1.00 2,600.00 0.00 - 100.00%
h Commode Spray nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 5.00 600.00 3,000.00 5.00 3,000.00 5.00 3,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
m CP Foldable Hinge nos. 2.00 5,500.00 11,000.00 2.00 11,000.00 2.00 11,000.00 0.00 - 100.00%
- - -
E CIVIL WORKS : SITE DEVELOPMENT - - -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 233.56 50.00 168.35 8,417.25 158.21 7,910.50 10.14 506.75 72.08%
2 EARTHWORK IN EXCAVATION Cu.m 65.14 400.00 39.25 15,700.20 31.79 12,717.60 7.46 2,982.60 60.26%
3 EARTH BACK FILLING : Cu.m 6.97 300.00 12.09 3,628.44 12.09 3,628.44 173.53%
4 BOULDER SOLING Cu.m 25.53 6,000.00 26.04 156,220.13 24.95 149,690.63 1.09 6,529.50 101.98%
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 0.54 7,602.00 0.54 7,602.00 0.00 - 100.56%
6 P.C.C (1:2:4) Cu.m 13.57 16,000.00 12.41 198,558.00 11.87 189,852.00 0.54 8,706.00 91.45%
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 19,800.00 0.98 19,586.20 0.98 19,586.20 0.00 - 98.92%
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.79 2,937.93 9.79 2,937.93 0.00 - 98.92%
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.11 13,897.00 0.10 12,902.51 0.01 994.49 106.90%
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.08 7,264.00 2.25 1,800.00 124.23%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
13 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 0.72 13,032.72 0.00 - 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.40 440.00 0.00 - 93.22%
15 METAL WORKS FOR FENCE k.g 1,892.10 220.00 416,262.00 1,205.06 265,113.20 1,162.78 255,811.60 42.28 9,301.60 63.69%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.09 118.89 26,155.45 4.42 972.64 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,679.04 7.80 4,679.04 0.00 - 98.46%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.27 2,895.20 8.27 2,895.20 0.00 - 93.26%
19 CHAIN LINK FENCE Sq.m 207.11 1,000.00 207,110.00 184.20 184,200.00 184.20 184,200.00 0.00 - 88.94%
20 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 0.00 - 100.00%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block, 3-9C(XS)-A, 2LiAC(S1), Ts(F)
School Name : Shree Trikala Lower Secondary School
Location : Ghyalchowk, Gorkha
Abstract of Cost - Civil Works
Type Design
Pay
Quantity in Total
Item Description of Works Unit Rate (NRs.) Site Amount
BOQ 3-9C(XS)-A 2LiAC(S1) Ts(F) Water Tank Quantity
No. Development
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 75.00 2,000.00 73.00 146,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 423.63 3,000.00 416.00 1,248,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 423.63 3,000.00 318.00 954,000.00
9 LAB TEST(WATER TEST) job 1.00 - -
10 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km. 24.00 50,000.00 24.00 1,200,000.00
-
CIVIL WORKS- BUILDING -
1 EARTH WORKS -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 784.21 100.00 343.75 297.65 83.91 725.31 72,531.10
1.2 EARTHWORK IN EXCAVATION : cu.m 420.89 400.00 188.67 145.89 71.19 405.75 162,299.81
1.3 EARTH BACK FILLING : cu.m 257.25 300.00 102.97 98.48 63.21 264.65 79,395.74
1.4 BOULDER SOLING : cu.m 121.63 6,000.00 59.19 50.88 14.48 124.54 747,254.73
1.5 SAND FILLING : cu.m 7.40 4.91 2.16 7.07 -
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 19.06 14,000.00 10.41 6.77 2.49 19.66
P.C.C (1:3:6)
275,252.18
2.1.2 P.C.C (1:2:4) WORKS cu.m 31.01 16,000.00 14.98 12.64 0.56 28.18 450,885.24
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 392.66 20,000.00 269.95 108.18 16.46 394.59 7,891,802.99
2.3 SILICA CEMENT ADMIXTURE kg 3,926.60 300.00 2,699.50 1,081.78 164.63 3,945.91 1,183,773.29
2.4 STEEL REINFORCEMENT Mt. 62.84 130,000.00 41.01 13.91 2.13 57.05 7,417,069.15
2.5 FORM WORKS sq.m 2,508.65 800.00 1,620.16 716.79 128.13 2,465.09 1,972,070.93
3. BRICK MASONRY WORKS
3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE FAIRFACE cu.m 103.87 20,000.00 -
-
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 592.09 550.00 - -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 592.09 400.00 - -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: - -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
9C(XS)-A, 2-LiAC(S1) and T(S)F -
-
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - -
2. CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 0.78 14,000.00 0.78
P.C.C (1:3:6)
0.78 10,904.25
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.47 1.47 191,574.92
2.5 FORM WORKS sq.m 54.93 800.00 54.67 54.67 43,738.00
3.1.1 INTERNAL CEMENT PLASTER (1:4) WITH PUNNING sq.m 33.66 700.00 33.66 33.66 23,565.25
4 WATER PROOF COATING sq.m 33.66 550.00 33.66 33.66 18,515.55
- -
F Furniture Works lot 1.00 4,000,000.00 0.50 0.50 1.00 4,000,000.00
Total 46,574,790.19
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 75.00 2,000.00 73.00 146,000.00
6 DISMANTLING OF COMPLETELY DAMAGED BUILDING sq.m 423.63 3,000.00 416.00 1,248,000.00
7 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
8 RELOCATING OF EXISTING TLC sq.m 423.63 3,000.00 318.00 954,000.00
9 LAB TEST(WATER TEST) job 1.00 - -
10 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
11 ROAD REPAIR AND MAINTENANCE Km. 24.00 50,000.00 24.00 1,200,000.00
-
CIVIL WORKS- BUILDING -
1 EARTH WORKS -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 784.21 100.00 343.75 297.65 83.91 725.31 72,531.10
1.2 EARTHWORK IN EXCAVATION : cu.m 420.89 400.00 188.67 145.89 71.19 405.75 162,299.81
1.3 EARTH BACK FILLING : cu.m 257.25 300.00 102.97 98.48 63.21 264.65 79,395.74
1.4 BOULDER SOLING : cu.m 121.63 6,000.00 59.19 50.88 14.48 124.54 747,254.73
1.5 SAND FILLING : cu.m 7.40 4.91 2.16 7.07 -
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 19.06 14,000.00 10.41 6.77 2.49 19.66
P.C.C (1:3:6)
275,252.18
2.1.2 P.C.C (1:2:4) WORKS cu.m 31.01 16,000.00 14.98 12.64 0.56 28.18 450,885.24
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 392.66 20,000.00 269.95 108.18 16.46 394.59 7,891,802.99
2.3 SILICA CEMENT ADMIXTURE kg 3,926.60 300.00 2,699.50 1,081.78 164.63 3,945.91 1,183,773.29
2.4 STEEL REINFORCEMENT Mt. 62.84 130,000.00 41.01 13.91 2.13 57.05 7,417,069.15
2.5 FORM WORKS sq.m 2,508.65 800.00 1,620.16 716.79 128.13 2,465.09 1,972,070.93
3. BRICK MASONRY WORKS
3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE FAIRFACE cu.m 103.87 20,000.00 -
-
7.2.3 CLEAR SILICON WATER-REPELLANT COATNG sq.m 592.09 550.00 - -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 592.09 400.00 - -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: - -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
9C(XS)-A, 2-LiAC(S1) and T(S)F -
-
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - -
2. CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 0.78 14,000.00 0.78
P.C.C (1:3:6)
0.78 10,904.25
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.47 1.47 191,574.92
2.5 FORM WORKS sq.m 54.93 800.00 54.67 54.67 43,738.00
3.1.1 INTERNAL CEMENT PLASTER (1:4) WITH PUNNING sq.m 33.66 700.00 33.66 33.66 23,565.25
4 WATER PROOF COATING sq.m 33.66 550.00 33.66 33.66 18,515.55
- -
F Furniture Works lot 1.00 4,000,000.00 0.50 0.50 1.00 4,000,000.00
Total 46,574,790.19
5 Barricading Works 1 45 45 Rm
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Outside Steps 1 18.93 0.68 0.15 1.92
1 2.50 0.68 0.15 0.25
Total 188.67 Cu.m
Building Floors
Classroom 3 5.70 4.70 0.20 16.07
Corridor 1 21.30 2.20 0.20 9.37
Staircase 1 4.70 4.20 0.20 3.95
Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
Outside Steps 1 18.93 0.68 0.10 1.28
1 2.50 0.68 0.10 0.17
Drains
At Backside Slope 1 22.93 0.99 0.10 2.26
Pebbles Compacted Earth at Back of Bldg 1 22.93 0.63 0.10 1.43
At Side of Bldgs 2 6.40 0.99 0.10 1.26
Pebbles Compacted Earth at Side of Bldg 2 6.40 0.63 0.10 0.80
Total 59.19 Cu.m
2 CONCRETE WORKS
2.1 P.C.C. Works
2.1.1 P.C.C.(1:3:6) Works
For Footing
Footing (F1) 3 1.80 1.80 0.10 0.97
Combine Footing (CF1) 3 7.20 2.20 0.10 4.75
Combine Footing (CF2) 2 7.20 1.80 0.10 2.59
Combine Footing (CF3) 1 6.50 1.80 0.10 1.17
Ramp
Wall Along Grid B 1 0.50 0.45 0.05 0.01
Wall Parallel to Ramp 1 6.80 0.45 0.05 0.15
Total 10.41 Cu.m
Beam
Foundation Tie Beam(250x300)
Along grid 1,2,3 3 20.80 0.30 0.30 5.62
Along grid A,B,C,D,E 5 6.45 0.30 0.30 2.90
Plinth Beam(300x300)
Along grid 1,2,3 3 20.80 0.30 0.30 5.62
Along grid A,B,C,D,E 5 6.45 0.30 0.53 5.08
Secondary beam(250x425)
Along A1,B1,D1 9 6.90 0.25 0.43 6.60
Slab deduction
Beam at first,second and Third floor level
Main Beam(300x500)
Along grid 1,2,3 -9 20.80 0.30 0.13 -7.30
Along grid A,B,C,D,E -15 6.45 0.30 0.13 -3.77
Secondary beam(250x425)
Along A1,B1,D1 -9 6.90 0.25 0.13 -2.02
Column
Foundation to Plinth 15 0.45 0.45 1.00 3.04
Ground Floor 15 0.53 0.43 3.00 10.04
First Floor 15 0.53 0.43 3.00 10.04
Second Floor 15 0.53 0.43 3.00 10.04
Top Floor(Staircase Cover) 6 0.53 0.43 2.60 3.48
Slab
First Floor Level Slab 1 22.80 7.80 0.13 23.12
Projection at Grid 1 1 11.58 0.58 0.13 0.87
1 5.58 0.58 0.13 0.42
Projection at Grid 3 12.13 1.01 0.13 1.60
Projection on staircase Landing on 1st Floor 1 4.08 0.60 0.13 0.32
Deduction
Staircase Void -1 4.70 4.20 0.13 -2.57
Staircase
Ground Floor to First Floor
Steps 19 0.02 Area 2.00 0.86
Waist Slab 1 3.38 2.00 0.20 1.35
1 3.35 2.00 0.20 1.34
Landing 1 4.17 1.65 0.21 1.41
1 4.05 0.90 0.30 1.09
Landing Beam 1 4.08 0.25 0.43 0.43
Lintel Band
Ground Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
First Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
Second Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
First Floor
Along grid 1 1 16.73 0.23 0.08 0.29
Along grid 2 1 16.73 0.23 0.08 0.29
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
Second Floor
Along grid 1 1 16.73 0.23 0.08 0.29
Along grid 2 1 16.73 0.23 0.08 0.29
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
Band at Parapet
Band at Top Floor Wall (Below door) 2 6.45 0.23 0.20 0.59
Third Floor Level 1 65.78 0.35 0.10 2.30
Vertical Band 44 0.80 0.23 0.23 1.86
Roof Top 1 29.20 0.35 0.10 1.02
Vertical Band 19 0.90 0.23 0.23 0.93
Total 269.95 cu.m
2.5 Formworks
Foundation
F1 3 7.20 0.20 4.32
CF1 3 18.80 0.65 36.66
CF2 2 18.00 0.65 23.40
CF3 1 16.60 0.65 10.79
Beam
Foundation Tie Beam(250x300)
Along grid 1,2 2 20.80 0.60 24.95
Along grid 3 1 20.00 0.60 12.00
Along grid A,B,C,D,E 5 6.45 0.60 19.35
Plinth Beam(300x300)
Along grid 1,2 2 20.80 0.60 24.96
Secondary Beam(250x425)
Along A1,B1,D1 9 6.90 1.10 68.31
Secondary Beam(250x425)
Along A1,B1,D1 -9 6.90 0.26 -16.15
Column
Foundation to Plinth 15 1.90 1.00 28.50
Ground Floor 15 1.90 3.00 85.50
First Floor 15 1.90 3.00 85.50
Second Floor 15 1.90 3.00 85.50
Slab
First Floor Level Slab 1 23.06 8.06 185.86
Projection at Grid 1 1 11.58 0.58 6.66
1 5.58 0.58 3.21
Projection at Grid 3 12.13 1.01 12.28
Projection on staircase Landing on 1st Floor 1 4.21 0.86 3.62
Deduction
Staircase Void -1 4.70 4.20 -19.74
Secondary Beam(250x425)
Along A1,B1,D1 -9 6.90 0.25 -15.53
Staircase
Upto first floor level
Steps 38 0.02 Area 0.80
Waist slab 1 3.38 2.00 6.75
1 3.38 2.00 6.75
Side formwork for waist slab 2 3.38 0.20 1.35
2 3.38 0.20 1.35
Landing 1 4.20 1.67 7.01
Side formwork for landing 1 3.34 0.21 0.68
Tread 19 2.00 0.15 5.70
Landing Beam 1 4.08 1.07 4.34
Lintel Band
Ground Floor
Along grid 1 1 6.03 0.15 0.90
Along grid 2 1 6.83 0.15 1.02
Along grid A,B,C,D,E 5 4.48 0.15 3.36
Second Floor
Along grid 1 1 6.03 0.15 0.90
Along grid 2 1 6.83 0.15 1.02
Along grid A,B,C,D,E 5 4.48 0.15 3.36
Sill band
Ground Floor
Along grid 1 1 20.80 0.15 3.12
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36
At store Below Landing 1 1.92 0.15 0.29
First Floor
Along grid 1 1 16.73 0.15 2.51
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36
Second Floor
Along grid 1 1 16.73 0.15 2.51
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36
Band at Parapet
Band at Top Floor Wall (Below door) 2 6.45 0.40 5.16
1 47.71 0.30 14.31
1 13.80 0.30 4.14
1 28.19 0.30 8.46
Total 1620.16 sq.m
3 Brickworks
3.2 Full Brick (230 mm) Works (1:4c/s)
Below Plinth level
Along Grid 1,2,3 3 20.78 0.23 0.40 5.73
Along Grid A,B,C,D,E 5 6.45 0.23 0.40 2.97
Ground Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.00 1.87
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Deduction
D1 -6 1.10 0.23 2.50 -3.80
W1 -12 1.10 0.23 1.13 -3.42
First Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.08 1.94
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Deduction
D1 -6 1.10 0.23 2.35 -3.57
W1 -12 1.10 0.23 1.13 -3.42
W2 -1 1.50 0.23 1.08 -0.37
V1 -12 1.10 0.23 0.55 -1.67
Second Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.08 1.94
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Deduction
D1 -6 1.10 0.23 2.35 -3.57
W1 -12 1.10 0.23 1.13 -3.42
W2 -1 1.50 0.23 1.08 -0.37
V1 -12 1.10 0.23 0.55 -1.67
Top Floor
Along Grid 1,3 2 4.08 0.23 2.03 3.80
Along Grid C,D 2 6.45 0.23 1.83 5.41
Deduction
D2 -2 1.00 0.23 2.10 -0.97
W2 -1 1.50 0.23 1.08 -0.37
Parapet Wall
1 47.71 0.23 0.80 8.78
1 13.80 0.23 1.40 4.44
1 28.19 0.23 0.90 5.84
Outside
Steps 1 19.27 0.30 0.10 0.58
1 18.61 0.30 0.25 1.40
1 0.60 0.50 0.30 0.09
1 0.54 0.50 0.30 0.08
1 0.60 0.50 0.30 0.09
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19
Total 108.63 cu.m
5 FLOORING WORKS
Cement Concrete Flooring (40mm) With Neat
5.1 Cement Punning
Ground floor
Rooms 3 5.75 4.75 81.94
Below staircase 1 4.20 4.75 19.95
Corridor 1 22.80 2.53 57.57
Staircase
Landing 1 4.20 2.00 8.40
Tread 18 1.95 0.30 10.53
Riser 19 1.95 0.15 5.56
First floor
Rooms 3 5.75 4.75 81.94
Corridor 1 22.80 2.53 57.57
Staircase
Landing 1 4.20 2.00 8.40
Tread 18 1.95 0.30 10.53
Riser 19 1.95 0.15 5.56
Staircase
Landing 1 4.20 2.00 8.40
Tread 18 1.95 0.30 10.53
Riser 19 1.95 0.15 5.56
Outside
Outer steps 1 18.91 0.90 17.02
Ramp 1 8.39 Area 8.39
First floor
Classrooms 3 18.88 56.64
Corridor 1 14.13 14.13
Corridor Column 2 0.65 1.31
3 0.87 2.61
Staircase 1 13.78 13.78
Second floor
Classrooms 3 18.88 56.64
Corridor 1 14.13 14.13
Corridor Column 2 0.65 1.31
3 0.87 2.61
Staircase 1 13.78 13.78
Top Floor 1 59.70 59.70
Roof Top 1 9.60 9.60
Total 353.75 r.m
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor
Classroom-1 1 21.00 2.91 61.01
Classroom-2 1 21.00 2.91 61.01
Classroom-3 1 21.00 2.91 61.01
Staircase 1 13.43 2.82 37.82
Deduction
D1 -4 1.10 2.50 -5.50
D4 -1 1.00 2.50 -1.25
First floor
Classroom-3 1 21.00 2.91 61.01
Classroom-4 1 21.00 2.91 61.01
Classroom-5 1 21.00 2.91 61.01
Staircase 1 13.43 2.82 37.82
Deduction
D1 -6 1.10 2.50 -8.25
W1 -12 1.10 1.13 -7.43
W2 -1 1.50 1.08 -0.81
V1 -12 1.10 0.55 -3.63
Second floor
Classroom-6 1 21.00 2.91 61.01
Classroom-7 1 21.00 2.91 61.01
Classroom-8 1 21.00 2.91 61.01
Staircase 1 13.43 2.82 37.82
Deduction
D1 -6 1.10 2.50 -8.25
D2 -1 1.00 2.10 -1.05
W1 -12 1.10 1.13 -7.43
W2 -1 1.50 1.08 -0.81
V1 -12 1.10 0.55 -3.63
Top Floor
1 23.15 2.40 55.51
Deduction
W2 -1 1.50 1.08 -0.81
D3 -2 1.10 1.90 -2.09
Total 656.89 sq.m
At Staircase Cover
Slab 1.00 8.30 5.30 43.99
Total 569.32 sq.m
Outer Beam
First floor level beam
Along grid 1 1 20.80 0.55 11.44
Along grid A and E 2 4.48 0.55 4.92
Landing beam 1 4.05 0.60 2.41
First Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50
Second Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50
Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W3 -1 1.50 0.33 -0.49
V1 -12 1.10 0.55 -7.26
First Floor
Along grid 1 1 16.73 2.50 41.81
1 4.08 2.08 8.46
Along grid 2 1 16.73 2.50 41.81
Along grid A,E/(1-2) 2 4.48 2.50 22.38
Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W2 -1 1.50 1.08 -1.61
V1 -12 1.10 0.55 -7.26
Second Floor
Along grid 1 1 16.73 2.50 41.81
1 4.08 2.08 8.46
Along grid 2 1 16.73 2.50 41.81
Along grid A,E/(1-2) 2 4.48 2.50 22.38
Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W2 -1 1.50 1.08 -1.61
V1 -12 1.10 0.55 -7.26
Top Floor
Along Grid 1,3 2 4.08 2.10 17.12
Along Grid C,D 2 6.45 1.90 24.51
Deduction
D2 -2 1.00 2.10 -4.20
W2 -1 1.50 1.08 -1.62
For Ramp
3A-3B 1.00 0.68 Area 0.68
Wall Along Grid-B 1.00 1.33 1.09 1.44
Wall Parallel to Grid-B 1.00 6.80 0.75 5.10
Parapet Wall
Band at Top Floor Wall (Below door) 2 6.45 0.20 2.58
1 47.71 1.51 72.05
1 13.80 2.05 28.29
8 MISCELLANEOUS
Total
8.3 Railling Length kg/m
Length
Staircase Railing
Ground Floor Lvl to First Floor Level
ISNB 40M(Horizontal Handrail) 1 6.28 6.28 3.56 22.36
25mm Square Pipe(Horizontal Bars) 4 6.19 24.74 0.85 21.03
Vertical 38mm Square Pipe 8 0.90 7.20 2.82 20.30
Parapet Railing
For First and Second Floor
ISNB 40M(Horizontal Bars) 2 24.75 49.50 3.56 176.22
ISNB 32M(Horizontal Bars) 4 24.75 99.00 3.10 306.90
ISNB 32M(Vertical Bars) 38 1.08 41.00 3.10 127.11
25mm Square Pipe(Vertical Bars) 342 0.82 280.44 0.85 238.37
For Terrace
ISNB 40M(Horizontal Bars) 1 81.63 81.63 3.56 290.59
ISNB 32M(Horizontal Bars) 1 52.75 52.75 3.10 163.53
ISNB 32M(Vertical Bars) 36 0.36 12.89 3.10 39.95
B Column
1 All Grid 15 20mm ɸ 16mm ɸ
Main Bar 20 2 7.11 213.30 2.47 526.85
20 2 4.04 121.20 2.47 299.36
16 4 3.56 213.60 1.59 339.62
16 4 6.55 393.00 1.59 624.87 6.29 5.97
0.125 0.125
0.7 0.46
0.345
0.158 0.1
Stirrups 0.25
Grid 1,2,3 3 10 209 1.20 752.40 0.62 466.49 0.1
Grid A,B,C,D,E 5 10 65 1.20 390.00 0.62 241.80 0.25
E GF Column
1 All Grid 15
Main Bar 20 2 7.20 216.00 2.47 533.52 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6
1.2 0.96
0.345
0.158 0.1
F Staircase
1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
2 Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70 1.88
3 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
4 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35
4 Grid A 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
7 Grid D 1 7.89
Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 138.30 1.59 219.90
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665
8 Grid E 1 7.89
Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 138.30 1.59 219.90
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665
Secondary beam
1 Grid A1,B1,D1 3 7.89
Top bar 16 3 9.22 138.30 1.59 659.69 0.665 0.665
Bottom bar 16 3 9.22 138.30 1.59 659.69
Stirupps 10 56 1.35 75.94 0.62 141.24 0.665 7.89 0.665
Extra bar
Long span
0.96 0.96
H Bent up bar in primary and 16 30 3.01 90.3 1.59 143.58
secondary beam junction 0.42
0.25
I Landing Beam 4.85
Top bar 16 3 5 15 1.59 23.85 0.075 0.075
Bottom bar 16 3 5 15 1.59 23.85 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375
0.375 0.55
Long Span 0.085 0.33
A-C 1
Main Bar Type A 8 19 13.92 264.48 0.4 105.79 0.45 Type A 0.45
Main bar Type B 8 19 14.12 268.24 0.4 107.30 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25
Main bar Type B 8 19 7.34 139.38 0.4 55.75
Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 4 8 12 8.5 408.00 0.4 163.20
Along Grid C, D and E 3 8 5 8.5 127.50 0.4 51.00
3.75
Negative bar
Along Grid A1,B1 & D1 4 8 14 2.16 120.96 0.4 48.38 0.055 2.05 0.055
Along Grid 2( A-D and D-E) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055
1 FF Column
1.1 Grid A,B and E 9
Main Bar 20 2 6.48 116.64 2.47 288.10 20mmɸ 16mmɸ
16 4 6.24 224.64 1.59 357.18 6.48 6.24
0.345
0.158 0.1
2 Staircase
2.1 First Flight
Top Main Bar 16 16 7.08 113.28 1.59 180.12 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70
Projected Portion
Top Bar 16 1.96 5.00 9.80 1.59 15.58
Bottom Bar 16 1.96 5.00 9.80 1.59 15.58
1.88
2.2 Second Flight 1 0.21
Top Main Bar 16 12 7.08 84.96 1.59 135.09
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
Long Span
A-C 1
Main Bar Type A 8 19 13.92 264.48 0.4 105.79 0.45 Type A 0.45
Main bar Type B 8 19 14.12 268.24 0.4 107.30 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25
Main bar Type B 8 19 7.34 139.38 0.4 55.75
Projected Portion
Along Long Span 2
Grid A-C 8 8 12.00 192.00 0.4 76.80
Grid D-E 8 8 6.00 96.00 0.4 38.40
Distribution Bar 12
Along Grid 1 1 8 4 18 72.00 0.4 28.80
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 4 22.98 91.92 0.4 36.77
Along Grid A 1 8 4 8.5 34.00 0.4 13.60
Along Grid A1,B,B1 & D1 3 8 12 8.5 306.00 0.4 122.40
Along Grid B,C, D and E 4 8 5 8.5 170.00 0.4 68.00
3.75
Negative bar
Along Grid A1,B1 & D1 3 8 14 2.16 90.72 0.4 36.29 0.055 2.05 0.055
Along Grid 2( A-C and D-E) 3 8 11 2.06 67.98 0.4 27.19 0.055 1.95 0.055
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055
Grid C and D 6
Main Bar 20 2 6.48 77.76 2.47 192.07
16 4 6.24 149.76 1.59 238.12
0.345
0.158 0.1
7 Staircase
7.1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70
0.25
Bent up bar in primary and
16 18 3.01 54.18 1.59 86.15 4.47
secondary beam junction
0.765 0.765
0.2
9 Landing Beam 0.1
Top bar 16 3 6 18 1.59 28.62 0.375
Bottom bar 16 3 6 18 1.59 28.62
Stirrups 1 10 42 1.35 56.7 0.62 35.154
Long Span
A-C 1
Main Bar Type A 8 19 14.16 269.04 0.4 107.62 0.45 Type A 0.45
Main bar Type B 8 19 14.86 282.34 0.4 112.94 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 8.16 155.04 0.4 62.02 Type B
Main bar Type B 8 19 8.86 168.34 0.4 67.34
2.4 1.88 2.05
A-E Grid (2-3) 1
Main bar
Main Bar Type A 8 13 25.76 334.88 0.4 133.95
Main bar Type B 8 13 27.16 353.08 0.4 141.23
Projected Poetion 8
Along Long Span
Along Grid 1 1
Grid A-C 8 16 14.00 224.00 0.4 89.60
Grid D-E 8 16 8.00 128.00 0.4 51.20
Along Grid 3 1 12
Grid A-C 8 22 14.00 308.00 0.4 123.20
Grid D-E 8 22 8.00 176.00 0.4 70.40
0.345
Grid C-D 1
Long Span Type A
A-C 1
Main Bar Type A 8 20 9.3 186.00 0.4 74.40 6.2
Main bar Type B 8 20 9.70 194.00 0.4 77.60
Type B
Distribution Bar
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055
14 Lintel Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43 0.075 0.075
At store 2 10 2 6.03 24.12 0.62 14.95 6.03
Tie Bar 0.075 0.075
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80 0.25
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24
At store 2 8 38 0.40 30.40 0.40 12.16
15 Sill Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43 0.075 0.075
At store 2 10 2 6.03 24.12 0.62 14.95 5.88
Tie Bar 0.075 0.075
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80 0.25
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24
At store 2 8 38 0.40 30.40 0.40 12.16
16 Band at Parapet
Band at Top Floor Wall 2 10 2 6.45 25.80 0.40 10.32
1 10 2 48.00 96.00 0.40 38.40
1 10 2 13.00 26.00 0.40 10.40
1 10 2 30.00 60.00 0.40 24.00
Tie Bar 1 8 640 0.40 256.00 0.40 102.40
17 Vertical Bands
Ground Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64
First Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64
Second Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64
Total 41014.65 kgs
41.01 MT.
Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance 1 24.50 11.50 281.75
Soak pit 1 15.90 Area 15.90
Total 297.65 sq.m
Building Floor
Rooms 4 4.70 3.70 0.20 13.91
Staircase 1 4.70 4.20 0.20 3.95
Corridor 1 19.00 2.20 0.20 8.36
Drains
At Backside Slope 1 20.88 0.99 0.10 2.06
Pebbles Compacted Earth at Back of Bldg 1 20.88 0.63 0.10 1.30
At Side of Bldgs 2 6.25 0.99 0.10 1.24
Pebbles Compacted Earth at Side of Bldg 2 6.25 0.63 0.10 0.78
Total 50.88 cu.m
2 CONCRETE WORKS
2.1 P.C.C Works
2.1.1 P.C.C.(1:3:6) Works
Foundation
Footing F1 18 1.65 1.65 0.10 4.90
Ramp
For Wall Parallel to Grid-3 1 6.80 0.45 0.05 0.15
Total 6.77 cu.m
Other Areas
Below ramp
For Slope 1 6.82 1.30 0.08 0.66
Above ramp
For Front wall 3-AB 1 6.80 0.25 0.05 0.09
For Side wall -3B 1 1.33 0.13 0.05 0.01
B Beam
Foundation Tie Beam(300x300)
Along grid 1,2,3 3 18.63 0.30 0.30 5.03
C Column
Column below Plinth level 18 0.38 0.38 1.05 2.66
Ground floor 18 0.38 0.38 3.00 7.59
First floor plan 18 0.38 0.38 3.00 7.59
D Slab
First floor level 1 20.80 7.80 0.13 21.09
Deduction
Staircase Void -1 4.70 4.200 0.13 -2.57
Beam deduction
First floor level(+3000 LVL)
Main beam(300x500)
Along grid 1,2,3 -3 18.63 0.30 0.13 -2.18
Along grid A,B,C,D,E,F -6 6.75 0.30 0.13 -1.58
E Staircase
Steps 20 2.00 0.28 0.15 1.68
Waist Slab 1 3.38 2.00 0.24 1.62
1 3.38 2.00 0.24 1.62
landing Slab 1 2.00 0.90 0.30 0.54
1 4.20 2.10 0.21 1.81
landing Beam 1 4.20 0.45 0.25 0.47
F Sill Bands
Ground floor plan
Along grid 1 1 18.63 0.23 0.08 0.32
Along grid 2 1 14.50 0.23 0.08 0.25
Along grid A,E,F 3 4.63 0.23 0.08 0.24
Along grid D 1 4.63 0.13 0.08 0.04
Store Below Staircase 1 3.52 0.23 0.08 0.06
Deduction
D1 -3 1.10 0.23 0.08 -0.06
D2 -1 1.00 0.13 0.08 -0.01
First floor plan
Along grid 1 1 14.50 0.23 0.08 0.25
1 4.13 0.23 0.13 0.12
Along grid 2 1 14.50 0.23 0.08 0.25
Along grid A,D,E,F 4 4.63 0.23 0.08 0.32
Deduction
D1 -3 1.10 0.23 0.08 -0.06
D2 -1 1.00 0.23 0.08 -0.02
G Lintel Bands
Ground floor level
H Pedestal
Base Block 6 0.50 0.25 0.25 0.19
I Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
I Soak Pit
RCC slab 1 2.84 Area 0.15 0.43
Total 108.18 cu.m
2.3 Silica Cement Admixture
10 Kg per cu.m. of R.C.C. M20 10 108.18 1,081.78
Total 1,081.78 Kg
2.5 Formworks
A Foundation
Isolated footing
Rectangular Base F1 18 6.60 0.20 23.76
B Beam
Foundation Tie Beam(300x300)
Along grid 1,2,3 3 16.63 0.60 29.93
Along grid A,B,C,D,E,F 6 5.95 0.60 21.42
Truss level
C Column
Column below Plinth level 18 1.50 0.60 16.20
Ground floor plan 18 1.50 3.00 81.00
First floor plan 18 1.50 3.00 81.00
D Slab
Base area 1 20.80 7.80 162.24
Side formwork 1 75.35 Perimeter 0.13 9.42
Beam deduction
Main beam(300x500)
Along grid 1,2,3 -3 18.63 0.30 -16.76
Along grid A,B,C,D,E,F -6 6.75 0.30 -12.15
Staircase -1 4.20 4.70 -19.74
E Staircase
Bottom Slab 1 2.90 0.30 0.87
Steps 20 0.02 Area 0.42
Waist Slab
At Bottom 1 3.38 2.00 6.76
1 3.38 2.00 6.76
At Edges 2 3.38 0.21 1.39
2 3.38 0.21 1.39
Landing Slab
At Bottom 1 4.20 1.67 7.01
At Edges 2 4.20 0.21 1.72
F Sill Bands
Ground floor plan
Along grid 1 1 18.63 0.15 2.79
Along grid 2 1 14.50 0.15 2.18
Along grid A,E,F 3 4.63 0.15 2.08
Along grid D 1 4.63 0.15 0.69
Store Below Staircase 1 3.52 0.15 0.53
Deduction
D1 -3 1.10 0.15 -0.50
D2 -1 1.00 0.15 -0.15
First floor plan
Along grid 1 1 14.50 0.15 2.18
1 4.13 0.15 0.62
Along grid 2 1 14.50 0.15 2.18
Along grid A,D,E,F 4 4.63 0.15 2.78
Deduction
D1 -3 1.10 0.15 -0.50
D2 -1 1.00 0.15 -0.15
G Lintel Bands
Ground floor level
Along grid 1 1 18.63 0.15 2.79
Along grid 2 1 14.50 0.15 2.18
Along grid A,E,F 3 4.63 0.15 2.08
Along grid D 1 4.63 0.15 0.69
Store Below Staircase 1 0.88 0.15 0.13
k Soak Pit
RCC slab
Base Area 1 2.84 2.84
Along Sides 1 5.97 0.15 0.90
side formwork for void and Removable Cover 2 2.44 0.15 0.73
Total 716.79 sq.m
3 BRICK WORKS
3.2 Full Brick (230 mm) Works (1:4c/s)
Below Plinth Level
Along Grid-1,2 and 3 3 18.63 0.23 0.45 5.78
Along Grid A,B,C,D,E and F 6 6.75 0.23 0.45 4.19
0.23
Ground floor 0.23
Along grid 1 1 14.50 0.23 2.35 7.84
1 4.13 0.23 1.98 1.87
Along grid 2 1 14.50 0.23 2.35 7.84
Along grid A and E 6 4.63 0.23 2.35 15.00
0.23
First floor level 0.23
Along grid 1 1 14.50 0.23 2.35 7.84
1 4.13 0.23 2.38 2.25
Along grid 2 1 14.50 0.23 2.35 7.84
Along grid A and E 6 4.63 0.23 2.35 15.00
Deduction for doors and windows 0.23
Ground floor plan 0.23
W1 -13 1.10 0.23 1.68 -5.51
W3 -1 1.50 0.23 0.30 -0.10
D1 -3 1.10 0.23 2.35 -1.78
First floor plan 0.23
W1 -13 1.10 0.23 1.68 -5.51
Below ramp
For Front wall 3-AB 1 6.50 0.35 0.30 0.68
For Side wall -3B 1 1.33 0.35 0.30 0.14
Above ramp
For Front wall 3-AB 1 1.40 0.23 0.38 0.12
1 4.25 0.23 0.19 0.18
For Side wall -3B 1 1.33 0.23 0.59 0.18
For Drain 1 39.85 0.23 0.15 1.37
External steps 1 19.50 0.48 0.10 1.95
1 19.50 0.18 0.15 2.93
1 19.50 0.08 0.10 1.95
Total 69.92 cu.m
First floor
Store 1 3.25 2.85 9.26
Grid D 1 4.63 2.35 10.87
For Ramp
Grid 3AB 1 1.40 0.22 0.30
1 5.12 0.22 1.10
For Bench
4 0.50 0.43 0.85
For Drain 1 41.40 0.15 6.21
Total 33.11 sq.m
5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Administration 1.00 3.75 4.75 17.81
Principal 1.00 3.75 4.75 17.81
Store/Pantry 1.00 3.75 4.75 17.81
Teacher's Room 1.00 3.78 4.75 17.93
Staircase Lobby 1.00 4.20 4.88 20.48
Staircase landing 1 4.20 2.00 8.40
Corridor 1.00 20.50 2.50 51.25
Deduction
D1 -6 1.10 -6.60
D2 -2 1.00 -2.00
Deduction
D1 -6 1.10 -6.60
D2 -2 1.00 -2.00
Total 196.52 r.m
6 ROOFING/TERRACING WORKS
6.1 Metal Works
A Truss 1 4055.99 4,055.99
Total 4,055.99 Kg
7 PLASTER/PAINTING WORKS
7.1 Cement Plaster Works
7.1.1 Internal Plaster on Wall (1:6)
Ground floor
Administration 1 17.00 Perimeter 2.87 48.79
Principal 1 17.00 Perimeter 2.87 48.79
Store/Pantry 1 17.00 Perimeter 2.87 48.79
Staircase
Waist slab
Bottom 2 2.72 2.00 10.87
Edges 2 2.72 0.21 1.11
Steps 20 0.02 Area 0.42
Landing 1 4.20 1.69 7.08
Beam plaster
First floor level
Along grid A,F 2 2.50 0.67 3.35
Along grid B,C 2 6.75 1.04 14.04
Truss level
Main beam(250x500)
Along grid 2 1 14.50 0.56 8.16
1 4.13 1.25 5.16
Along grid 3 1 18.63 0.75 13.97
Along grid A,E 2 2.13 0.75 3.19
Along grid B,C,D,E 4 2.13 1.25 10.63
Total 236.18 sq.m
Ground Floor
Along grid 1
A1,F1 2.00 0.88 3.00 5.26
B1,C1,D1,E1 4.00 0.50 3.00 6.00
Along grid 2
Grid A2,E2 2.00 0.50 3.00 3.00
Along grid 3
A3,B3,C3,D3,E3,F3 6.00 1.50 3.00 27.00
First Floor
Along grid 1
A1,F1 2.00 0.88 3.00 5.26
B1,C1,D1,E1 4.00 0.50 3.00 6.00
Along grid 2
Grid A2,E2 2.00 0.50 3.00 3.00
Along grid 3
A3,B3,C3,D3,E3,F3 6.00 1.50 3.00 27.00
Outer Walls
Ground floor
Along grid 1 1 14.50 2.50 36.25
1 4.13 2.05 8.46
Along grid 2 1 14.50 2.50 36.25
Along grid A,F/(1-2) 2 4.63 2.50 23.13
8 MISCELLANEOUS
8.2 Cement Board for partition
Gable Walls 2.00 7.15 1.45 20.74
Total 20.74 sq.m
8.3 Railing
Staircase Railing
Horizontal ISNB 40M 1 8.43 8.43 3.56 30.01
Vertical 38mm Square Pipe 2 0.989 1.98 2.82 5.58
Vertical 38mm Square Pipe 6 0.969 5.81 2.82 16.40
Horizontal 25mm Square Pipe 4 8.34 33.37 0.85 28.37
Balcony Railing
First Floor
Horizontal ISNB 40M 1 22.88 22.88 3.56 81.44
Horizontal ISNB 32M 2 19.90 39.80 3.10 123.38
Vertical ISNB 32M 19 0.982 18.66 3.10 57.84
Inclined ISNB 32M 19 0.134 2.55 3.10 7.89
Vertical 25mm Square Pipe 150 0.82 123.00 0.85 104.55
Pedestal
ISNB 40M Pedestal Bars 6 1.54 9.25 3.56 32.92
6 1.20 7.20 3.56 25.63
12 0.40 4.80 3.56 17.09
Base plate 64 0.00009375 0.01 7850 47.10
12 mm dia. Anchor Bolt, Nut 256 0.13 33.28
Total 611.46 Kg
2 Column 15
20 2 7.20 216.00 2.47 533.52 20mm ɸ 16mm ɸ
20 2 4.20 126.00 2.47 311.22
16 2 6.72 201.60 1.59 320.54
16 2 3.72 111.60 1.59 177.44 7.08 6.60
0.125 0.125
0.459
Stiruups 0.30
For 15 column 15 10 16 1.38 320.85 0.62 198.93 0.1
10 16 1.04 241.8 0.62 149.92 0.30
8 FF Column
All Grid 15
Main Bar 20 2 2.64 79.20 2.47 195.62
16 2 2.72 81.60 1.59 129.74
2.64 2.72
9 Truss Beam
Grid 1,2 & 3 3
Top bar (T/O) 12 2 11.01 66.06 0.89 58.79 8.28 7.07
12 2 8.72 52.32 0.89 46.56 0.44 11.01 0.44
12 2 7.51 45.06 0.89 40.10
12 1 11.01 33.03 0.89 29.40
12 1 8.72 26.16 0.89 23.28 7.07 8.28
12 1 7.51 22.53 0.89 20.05
Bottom Bar (T/O) 3 12 2 7.02 42.12 0.89 37.49 0.44 11.01 0.44
12 2 8.72 52.32 0.89 46.56
12 2 7.52 45.12 0.89 40.16
12 1 7.02 21.06 0.89 18.74 8.28 7.07
12 1 8.72 26.16 0.89 23.28 0.44 11.01 0.44
12 1 7.52 22.56 0.89 20.08
10 Lintel Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E,F 6 10 2 5.15 61.80 0.62 38.32
Along grid 1 4 10 2 4.15 33.20 0.62 20.58
Along grid 2 4 10 2 4.15 33.20 0.62 20.58 0.075 0.075
At store 2 10 2 4.80 19.20 0.62 11.90 5
Tie Bar 0.075 0.075
Along grid A,B,C,D,E,F 6 8 34 0.40 81.60 0.40 32.64 0.25
Along grid 1 4 8 26 0.40 41.60 0.40 16.64
Along grid 2 3 8 26 0.40 31.20 0.40 12.48
At store 2 8 30 0.40 24.00 0.40 9.60
11 Sill Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E,F 6 10 2 5.15 61.80 0.62 38.32
Along grid 1 4 10 2 4.15 33.20 0.62 20.58
Along grid 2 4 10 2 4.15 33.20 0.62 20.58 0.075 0.075
At store 2 10 2 4.80 19.20 0.62 11.90 5
Tie Bar 0.075 0.075
Along grid A,C,D,E,F 5 8 34 0.40 68.00 0.40 27.20 0.25
Along grid 1 4 8 26 0.40 41.60 0.40 16.64
Along grid 2 3 8 26 0.40 31.20 0.40 12.48
At store 2 8 30 0.40 24.00 0.40 9.60
12 Vertical Bands
Ground Floor 3
Main Bar 10 2 2.95 17.70 0.62 10.97 2.8 2.8
Tie Bar 8 17 0.40 20.40 0.40 8.16
First Floor 3
Main Bar 10 2 2.95 17.70 0.62 10.97
Tie Bar 8 17 0.40 20.40 0.40 8.16 0.075 0.075
13 Bench Slab
Main Bar 1 10 7.00 2.65 18.55 0.62 11.50 0.075 0.075
Distribution Bar 1 8 26 0.65 16.90 0.40 6.76 0.25
14 Soak pit
Slab 1 8 2 1.17 2.33 0.40 0.93
1 8 2 1.80 3.60 0.40 1.44
1 8 2 2.23 4.45 0.40 1.78
1 8 2 2.55 5.09 0.40 2.04
1 8 2 2.80 5.60 0.40 2.24
1 8 2 3.00 6.00 0.40 2.40
1 8 2 3.16 6.32 0.40 2.53
1 8 2 3.28 6.56 0.40 2.62
1 8 2 3.38 6.76 0.40 2.71
1 8 4 1.35 5.40 0.40 2.16
1 8 4 1.37 5.47 0.40 2.19
1 8 4 1.38 5.50 0.40 2.20
negetive bar 1 8 23 0.60 13.80 0.40 5.52
distribution bar 1 8 4 10.99 43.96 0.40 17.58
Total 13912.53 Kgs.
13.91 Mt.
2-LiAC(S1) Total
S. No. Description Unit Remarks
GF FF Total Quantity
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1 1.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 2 2.00 nos.
3 General Service Light Point Wiring
3.1 One Way Light Point 22.00 20 42 42.00 pts.
3.2 Two Way Light Point 1.00 1 1.00 pts.
3.3 Ceiling Fan Point pts.
4 6A Universal Pin Light Power Socket Wiring 14.00 16 30 30.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 14.00 16 30 30.00 nos.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan nos.
6 Wall Fan 1 1 1.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Recessed Mounted Square type 10 10 10.00 nos.
7.2 18 W LED Surface Mounted Square type 12 12 12.00 nos.
7.3 18 W LED Recessed Mounted Square type 4 4 4.00 nos.
7.4 12 W LED Surface Mounted Cylindrical type 9 9 9.00 nos.
7.5 12 W LED Recessed Mounted Circular type 8 8 8.00 nos.
7.6 LED Wall Light 1 1 1.00 nos.
8 Pull Box nos.
Junction Box At External Post Top Light 3 no.
9 External post top light pole 3 3 3 no.
10 Post Top External Light Fixtures 3 3 3 no.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3.00 no.
11.2 Earthing Bar 3 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 66 r.m
12.3.2 12 SWG Cu wire 16 r.m
13 Earth Test link 1 nos.
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size 6 6 6.00 nos.
b Dry Powder Fire Extinguisher 1 1 1.00 nos.
2 Concrete Works
2.1 PCC
2.1.1 P.C.C.(1:3:6) Works
For Footing 1
P.C.C. for isolated footing(F1) 6 1.00 1.00 0.10 0.60
Septic Tank
1 5.50 2.25 0.08 0.99
Sewer Manhole
Bottom 1 1.00 Area 0.10 0.10
Waste water Chamber 0.00
Bottom 2 1.00 1.00 0.10 0.20
Total 2.49 Cu.m
Beam
Foundation Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Along grid B/(1,2) 1 3.20 0.25 0.30 0.24
Tie Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Column
Column up to plinth level 6 0.30 0.30 1.00 0.54
Column from plinth to top 6 0.30 0.30 3.00 1.62
Slab
Slab of first floor 1 4.75 2.25 0.15 1.60
Lintel Bands
For first floor
Along grid 1 1 4.70 0.125 0.25 0.15
Along grid 2 1 4.70 0.125 0.25 0.15
Along grid 3 1 4.70 0.125 0.25 0.15
Along grid A 1 5.40 0.125 0.25 0.17
Along grid B 1 3.20 0.125 0.25 0.10
Along the partition wall 1 3.25 0.125 0.25 0.10
For the partition wall 1 2.77 0.125 0.13 0.04
Soak Pit
RCC slab 1 1.13 Area 0.12 0.14
Sewer Manhole
Top Cover 1 1.00 1.00 0.10 0.10
Waste Water Chamber
Top Cover 2 1.00 1.00 0.10 0.20
Total 16.46 Cu.m
2.5 Formworks
Foundation
Isolated footing (F1) 6 4.00 0.20 4.80
Beam
Foundation Beam
Along grid 1 1 4.70 0.50 2.35
Along grid 2 1 4.70 0.50 2.35
Along grid 3 1 4.70 0.50 2.35
Along grid A 1 5.40 0.50 2.70
Along grid B/(1,2) 1 3.20 0.50 1.60
Tie Beam
Along grid 1 1 4.70 0.60 2.82
Along grid 2 1 4.70 0.60 2.82
Along grid 3 1 4.70 0.60 2.82
Along grid A 1 5.40 0.60 3.24
Along grid B/(2,3) 1 2.20 1.18 2.60
Column
Column up to plinth level 6 1.00 1.20 7.20
Column from plinth to top 6 3.00 1.20 21.60
Slab
Along corridor 1 4.75 2.25 10.69
Lintel Bands
Along grid 1 2 4.70 0.125 1.18
Along grid 2 2 4.70 0.125 1.18
Along grid 3 2 4.70 0.125 1.18
Along grid A 2 5.40 0.125 1.35
Along grid B 2 3.20 0.125 0.80
Along partition walls 1 2.77 0.125 0.35
Sewer Manhole
Top Cover 1 0.60 Area 0.60
5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilets ( Female) 1
At corridor 1 5.30 1.20 6.36
At Ramp 1 5.60 1.20 6.72
Along the terrace 1 4.75 2.25 10.69
step 1 0.30 1.20 0.36
Inside the room 1 3.23 2.00 6.45
1 3.23 2.50 8.06
At Doors 1 1.90 0.25 0.48
Along the water trough 1 3.45 0.7 2.42
Total 41.53 sq.m
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Toilets ( Female) 1
Along grid A & B 2 3.20 1.80 11.52
Along A 1 2.20 3.00 6.60
Along grid 1 1 4.70 1.80 8.46
Along grid 2 1 2.55 1.80 4.59
On partition wall 2 3.25 1.80 11.70
Long wall 1 1.63 1.80 2.93
1 1.88 1.80 3.38
Short wall 2 0.43 1.80 1.53
8 MISCELLANOUS
8.2 Cement Board
For Partition
2.00 1.69 Area 3.37
Total 3.38 sq.m
900
a. Along Y-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
900
b. Along X-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
B. Column-MAIN BAR
465
4251
a. Longitudinal bar upto full height 12 - 6 8 5160 247.68 0.889 220.16
100 344
STIRRUPS FOR COLUMN SIZE 300 x 300 upto Plinth Height-
220
80
1
160 6
80 0
c Stirrups 8 100 6 11 800 52.8 0.395 20.86
1
6 160
0
C Column (300*300)
220
80
a Stirrups for Column upto floor Height 220 8 125 6 25 1040 156 0.395 61.63
1
160 6
80 0
b " 8 125 6 25 800 120 0.395 47.41
1
6 160
0
D BEAM
1 Foundation Beam (250*250)
5000
a Along Grid-1,2 & 3- Top Bar 720 720 12 3 3 6440 57.96 0.889 51.52
b Along Grid--1,2 & 3-Bottom Bar 720 12 3 3 6440 57.96 0.889 51.52
5000 720
6000
c Along Grid-A & B-Top Bar 12 3 3 7440 66.96 0.889 59.52
720 720
200
80
e Stirrups Along Grid 1, 2 & 3 8 150 3 34 960 97.92 0.395 38.69
200
200
80
f Stirrups Along A & B 8 150 2 40 960 76.8 0.395 30.35
200
5000
a. Along Grid-1 -Top Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
b 720 12 1 1 6440 6.44 0.889 5.73
720
5000
c Along Grid-1 -Bottom Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
d 720 12 1 1 6440 6.44 0.889 5.73
720
e Along Grid-2 & 3-Top Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
g Along Grid-2 & 3-Bottom Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
6000
i Along Grid-A & B-Top Bar 12 2 3 7440 44.64 0.889 39.68
720 720
j Along Grid-A & B-Bottom Bar 720 12 2 4 7440 59.52 0.889 52.91
6000 720
200
80
200
80
3 FLOOR BEAM
LONGITUDINAL BARS
Along Grid 1,2&3
5200
a Top Bars 870 16 3 2 6940 41.64 1.580 65.81
870
5200
b Top Bars 12 3 1 6380 19.14 0.889 17.02
590 590
6200
e Top Bars 12 2 3 7380 44.28 0.889 39.36
590 590
STIRRUPS
200
8
0
g Stirrups for Beam Size 250*400 350 8 125 1 93 1260 117.18 0.395 46.30
200
80
h Stirrups for Beam Size 250*450 400 8 125 1 124 1360 168.64 0.395 66.63
E SLAB
850 850
a Main Bars Short Span 100 10 150 1 33 4600 151.8 0.617 93.71
100 2700
1475 1475
b Main Bars Long Span 100 10 150 1 16 8350 133.6 0.617 82.47
5200 100
220
80
1
160 6
80 0
b Stirrups 8 125 6 21 800 100.8 0.395 39.83
1
6 160
0
G SOAKPIT
d=1850+Ld
d=1450+Ld
c Main Bar Along both Direction 8 200 1 2 1650 3.3 0.395 1.31
1650
h Top Bar Along Radial Direction 8 200 1 8 425 3.4 0.395 1.35
425
H SEPTIC TANK
200
6
a Stirrups for Concealed Beam 5 8 150 1 13 670 8.71 0.395 3.45
70
1850
b 10Ø Longitudional Bar for CB-Top Bar 10 1 2 1970 3.94 0.617 2.44
60
60
c 10Ø Longitudional Bar for CB-Bottom Bar 10 1 2 1970 3.94 0.617 2.44
60 1850
60
Bed RCC Bars
d Bottom Mesh Bar-Along Length Wise 8 200 1 12 5550 66.6 0.395 26.32
50 5450
50
e Bottom Mesh Bar-Along WIdth Wise 8 200 1 28 2300 64.4 0.395 25.45
50 2200 50
f Septic Tank Slab Cover
1215 1475
j 8Ø Bottom bar along Length wise 8 1 9 7650 68.85 0.395 27.20
60 4840 60
1215
k 8 1 4 3780 15.12 0.395 5.98
60 2445 60
1
n Top Bars-Along Width Wise 0 8 1 8 620 4.96 0.395 1.96
0 520
I SILL BAND
Longitudinal Bars
3400 75
800
800
a Grid 1/A-B ,Grid 3/A-B 10 75 2 2 6350 25.4 0.617 15.68
75 600 600
1175 75
1700
b Grid 2/A-B 10 1 2 2950 5.9 0.617 3.65
75
2650 75
425
425
c Grid A/1-2, B/1-2 10 2 2 4950 19.8 0.617 12.23
75
75 600 600
2150 75
175
175
d Grid A/2-3 10 1 2 3850 7.7 0.617 4.76
75
75 600 600
e Partition Wall between Grid A & Grid B 10 1 2 3600 7.2 0.617 4.45
3600
Ties
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 20 320 6.4 0.395 2.53
190
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 9 170 1.53 0.395 0.61
70
50 50
o Partition Wall between along D3 8 150 1 7 170 1.19 0.395 0.48
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
J Lintel Band
Longitudinal Bars
3400 75
800
800
3400 75
800
800
2650 75
425
425
2150 75
175
175
e Partition Wall between Grid A & Grid B 10 1 2 3700 7.4 0.617 4.57
3600
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 33 320 10.56 0.395 4.18
190
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 10 170 1.7 0.395 0.68
70
50 50
o Partition Wall between along D3 8 150 1 21 170 3.57 0.395 1.42
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
M INCINERATOR
a 630*505 Grill Mesh
Toilet
S. No. Description Quantity Unit Remarks
Block
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 1 1.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS nos.
1.4 Stand Alone 6 A DP MCB with Enclosure 1.00 1.00 nos.
3.1 One Way Light Point 5.00 5.00 pts.
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan 2 2.00 no.
7 Light Fixtures/Luminaires & Accessories
7.5 7W LED Wall Light 1.00 1.00 no.
7.6 9W LED Surface Mounted Cylindrical type 1.00 1.00 no.
7.7 6W LED Recessed Mounted Circular type 3.00 3.00 no.
7.8 7W LED T5 Slim Mirror Light 1.00 1.00 no.
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Concrete Pavement
Infront of 3-9C(XS) Bldg 1 24.20 2.50 60.50
Deduct Ramp -1 0.80 6.30 -5.04
Infront of 2-Lali Bldg 1 24.50 2.50 61.25
Deduct Ramp -1 0.80 6.30 -5.04
Side of 2-Lali Bldg 1 2.50 1.25 3.13
Infront of Toilet 1 2.00 6.50 13.00
Deduct Ramp -2 0.80 6.30 -10.08
Gate to Bldg 1 8.50 4.00 34.00
Betn two Bldgs 1 2.50 3.00 7.50
Betn Ts(F) and Lali 1 2.50 2.50 6.25
For Gate Column 2 1.20 1.20 2.88
Total 168.35 sq.m
2 Earth Work Excavation
Concrete Pavement
Infront of 3-9C(XS) Bldg 1 24.20 2.50 0.20 12.10
Deduct Ramp -1 0.80 6.30 0.20 -1.01
Infront of 2-Lali Bldg 1 24.50 2.50 0.20 12.25
Deduct Ramp -1 0.80 6.30 0.20 -1.01
Side of 2-Lali Bldg 1 2.50 1.25 0.20 0.63
Infront of Toilet 1 2.00 6.50 0.20 2.60
Deduct Ramp -2 0.80 6.30 0.20 -2.02
Gate to Bldg 1 8.50 4.00 0.20 6.80
Betn two Bldgs 1 2.50 3.00 0.20 1.50
Betn Ts(F) and Lali 1 2.50 2.50 0.20 1.25
4 Boulder Soling
Concrete Pavement
Infront of 3-9C(XS) Bldg 1 24.20 2.50 0.15 9.08
Deduct Ramp -1 0.80 6.30 0.15 -0.76
Infront of 2-Lali Bldg 1 24.50 2.50 0.15 9.19
B Column
Gate Column 2 0.30 0.30 2.90 0.52
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.98 cu.m
17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m
19 Flag Pole
75 Dia GI Pipe 2 1 2.00
Total 2.00 nos
Size Spacing c/c Rebar Length/pc. Total Weight Per Total Weight
SN Description Shape Structure Nos Remarks
(mm) (mm) Nos (mm) Length (m) Meter (Kg) (Kg)
1 Entrance Gate-Column
75 75
a 900*900 Foundation Mesh 850 10 150 2 12 1000 24 0.62 14.82
220
1
7
7 3
5
d 8 mm dia at 150 c/c for column stirrups-Outer 8 150 2 26 842 43.784 0.40 17.3