Contract Bills
Final Interim Payment Certificate
Period: 15th November 2018 to 14th November 2019
Name of School: Shree Namruk L. S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills:
Voucher no.of previous payment bills:
Date of order for commencement of work: 15th November, 2018
Date of work to be completed: 14th November, 2019
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
Contract
GENERAL
MOBILIZATION AND DEMOBILIZATION 500,000.00
L.S. 1.00 500,000.00 500,000.00 1.00 0.50 250,000.00 0.50 250,000.00 100.00%
Mobilization of the construction by constructing
1
temporaty
2. SITE OFFICE acomodation for labours and site staff Per
ESTABLISHMENT 300,000.00
with required 12.00 25,000.00 300,000.00 12.00 10.00 250,000.00 2.00 50,000.00 100.00%
2 Providing and suitable
Maintaining facilities Siteand keeping
Office of two the Month
same in having
Rooms good hygenic total Area condition
20 sq.m forfor entire
the project
use of
3. PROJECT INFORMATION BOARD 10,000.00
3 completion
Client and and time.
Consultant Demolition
including of the same and nos. 1.00 10,000.00 10,000.00 1.00 1.00 10,000.00 - - 100.00%
Providing Fixing of Project office chair, Table,
Information board
cleaning file
Lockable thecabinet,
site Stationery
after completion ofPaper,
Items (Ink,location the
with
4. SAFETYapproved SIGN Text
BOARD in appropriate 10,000.00
construction
Pen, Pencils activities
etc.), all complete.
1 Computer and 1 [Note:
Printer 50%
with
including
Providing shall all
and required
Fixing offixing
Safety accessories Boardas with per nos. 1.00 10,000.00 10,000.00 1.00 1.00 10,000.00 - - 100.00%
4 payment
all necessary be all
set up. madecomplete after Sign
ascompletion
per instruction of
drawing
approved all
Textcomplete.
andremaining
Sinage including required fixing
5.
of BARRICADING
mobilization
engineer. The and WORKS
Specification 50% after
of computer completion
shall not R.m 121,200.00
accessories as per drawing all complete. 65.00 2,000.00 130,000.00 60.60 60.60 121,200.00 - - 93.23%
5 Barricading
of works
be less than as between
per contract]
(19.5" the monitor
led School Academicwith Corearea i5, and
7th
Construction
6. DISMANTLING
Generation, areagb
500 with Hdd,1.8 8gb m high
OF CGI
ddrCOMPLETELY
4 ram),SheetPrinter
fixed 292,500.00
6 to Bamboo
DAMAGED
should function support
BUILDING
at least frame all complete
of Printing, Scanning per sq.m
as and 99.85 3,000.00 299,550.00 97.50 97.50 292,500.00 - - 97.65%
instruction
Demolition
Photocopy of Engineer.
existing
A4 sizedamaged building safely and
7. SAFETYofMATERIALS documents.
& SITE Providing
SAFETY 100,000.00
7 handover
Maintaining
Providing ofand the Maintaining
all reusable
above items materials
on to the
Rental
Construction Basis for L.S.
school
Safety
1.00 100,000.00 100,000.00 1.00 0.45 45,000.00 0.55 55,000.00 100.00%
authority,
entire
Measures project storing
in them totime.
completion
Construction theSitelocation
with shown by the
8. CONSTRUCTION OF NEW TLCproper Safety 194,250.00
8 school andtodisposing
measures debris including transportation
Shoes, sq.m 93.91 3,000.00 281,730.00 64.75 36.40 109,200.00 28.35 85,050.00 68.95%
Construction person of and newworkTemporary area (Helmet, Learning
of debris
First Aid ,cleaning
Kit, Clothing, site etc.
Glove, as per Guardspecification
Rail for edge and
Centre(TLC),
9. LAB TEST(WATER with Locally TEST)Available materials -
instruction
protection, of Engineer.
Safety Net, Safety rope,shall
Fall include
Protection
9 (CGI
Testing Sheet
and and Bamboo
Providing Lab etc.),
Testrate Report for Quality all job 1.00 7,500.00 7,500.00 - - - -
etc.) as
Materials required by the Contract Clause GCC 24
of
10. Water within Water fixingStream
charge.(Up and Down streem)
and TEMPORARY
Specification TOILET division 1 "GENERAL nos. 2.00 150,000.00 300,000.00 2.00
300,000.00
2.00 300,000.00 - - 100.00%
located near by
10 Construction Construction
of temporary site before Starting
REQUIREMENT CLAUSE toilet 8(C)".with The CGI number Sheet of
and
fixed after completion
toMaterials
Bamboo support of construction
frame and all work. This
necesary
11.
SafetyROAD REPAIR AND MAINTENANCE
Personal Protecting Equipments 700,000.00
Test
items has to be done to mark the affect of
(PPE) including
Providing shalland Septic pit,but
be Maintaining
minimum Pipeline,
the roads
not Toilet
as
limited to Pan
necessary etc.
40 sets. to Km. 14.00 50,000.00 700,000.00 14.00 7.67 383,500.00 6.33 316,500.00 100.00%
construction work completion
in water stream.
11 for
avoid entire
Payment project
blockage
shall bebymade Landslides
in Prorata time allRockfall
andBasis complete
for entire as
for
per Instruction
regular
duration transport
of project. ofofEngineer.
construction Ratematerials
shall include and site all
- - - -
Material cost
inspection with overall
during fixing, construction
construction period. chargesRate and
BILL NO. &
demolition 2. CIVIL
cleaning WORKS
of the cost - BUILDING
same after completion 343.45 34,345.25 291.24
shall include all Material with demolition sq.m 380.51 100.00 38,051.00 29,124.00 52.21 5,221.25 90.26%
12 1.of EARTH WORKS
the construction activities all complete.charges of
charges,
1.1 EARTHWORK cleaning,
SITE CLEARANCE fixing & construction
& MOBILIZATION:
1.2 IN EXCAVATION : 162.25 64,899.56 155.81
13 the sameandafter
Clearing completion
grubbing of construction
the siteExcavation
for the construction by cu.m 228.95 400.00 91,580.00 62,325.72 6.43 2,573.84 70.87%
activities all complete. in
removing
foundations 150mm thick top soil including bushes,
1.3 EARTH in BACKall type of soils :for foundation,
FILLING 123.92 37,175.73 76.55
small trees, leveling ofetc. undulated ground, depth shorting cu.m 107.31 300.00 32,193.00 22,965.00 47.37 14,210.73 115.48%
14 trenches, footing, pitsBack to the required
filling in foundation and
and stacking/storing
including dewatering selected
by approved
manual top orsoil for reuse in
mechanical
sides
1.4 of foundation
BOULDER SOLINGwith : unsuitable soil obtained cu.m 58.52 6,000.00 46.59 279,521.10 43.32
landscaping
meansthe etc. works, disposing
as per specifications materials
with allat site or 351,120.00 259,919.10 3.27 19,602.00 79.61%
from excavation at site and stacked
15 contractor
from site, � etc.,own allProviding
complete andper
as laying uncoursed
drawings,
brought
hand fromsDry
packed outside machinery
Rubble in layer
Stone
andexceeding
not equipment's,
soling in 15 cm
1.5 SANDcrossing
specifications
providing FILLING of :track, shoring,
and instructions of the strutting,
Engineer. 2.49 14,940.00
thick (compacted thickness) including cu.m 2.49 6,000.00 14,940.00 - 2.49 14,940.00 100.00%
16 foundation,
timbering and
transportation
under
Providingfloorand
buttressing
of soil,
plinth
with
spreading
withsand
filling out in
appropriate
anysoak special
requiredmaterials
ininterstices line
pit.
and
dressing
all complete of stoneas per including
drawings, filling
specifications with
2.
and CONCRETE
all such
level, sprinkling WORKS
measures necessary
water,orramming, to retain
compacting in and
position
with cu.m 8.21 114,877.00 8.21
suitable
instruction quarry waste stone chips or quarry sand, 10.02 14,000.00 140,280.01 114,940.00 (0.00) (63.00) 81.89%
17 2.1
the P.C.Cofof
sides
mechanical thethe
2.1.1 Engineer.
P.C.C
foundation
rammers, (1:3:6)
testing, pit etc.,
and including
all complete as
watering, compacting using appropriate mechanical
Providing
refilling
per theand
drawing, laying machine
excavated
specification materialmixed Plain of
with watering, Cement
compaction means with alland instructions
contractors materials, the
Concrete
ramming,
Engineer. of nominal
leveling the mixsite 1:3:6
and (1 cementoff
disposing : 3 the
sand :
handling, placing etc. all complete as per drawings,
6surplus/unusable
coarse aggregateearth ) fortoleveling
outsidecourse in
the construction
specifications and instruction of the Engineer. The
foundations
premises, etc.and allunder
complete floorasofper building,
drawings, etc. in all
complete item including all lead & lift.
level with broken and stone
Prepared by contractor specifications
Checked by Consultant,not
aggregate
instructions of theof size
Engineer.
DSC more
Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
than 25 mm of approved quality including
formwork wherever necessary, dewatering,
batching, mixing, transporting, placing, compacting,
curing, including all lead and lift, etc. all complete
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
Contract
2.1.2 P.C.C (1:2:4) WORKS cu.m 14.29 16,000.00 11.87 189,877.00 10.88
18 228,640.00 174,107.72 0.99 15,769.28 83.05%
Providing and laying machine
mixed
2.2 PlainFOR
P.C.C. Cement R.C.C. Concrete
WORKS of nominal
: mix 1:2:4 211.05 4,220,982.88 202.41
(1 cement : 2 sand : 4 coarse aggregate ) for in leveling cu.m 225.51 20,000.00 4,510,199.89 4,048,200.00 8.64 172,782.88 93.59%
19 Providing and laying
course
position in foundations
machine and
mixedADMIXTURE under floor
and machine vibrated of building,
2.3 SILICA CEMENT 2,110.49 633,147.43 2024.10
etc. in all level with broken stone (1aggregate of size kg 2255.10 300.00 676,530.03 607,230.00 86.39 25,917.43 93.59%
20 cement
not
concrete
moreaggregate)
than 25 mm
of mix 1:1.5:3
Providing
of approved
cement:1.5
and mixingsand:
3 coarse
Silica Cement AdmixtureM20 grade for quality
of in structuralreinforced including
concrete at
2.4 STEEL
formwork REINFORCEMENT
wherever necessary, dewatering, 33.11 4,304,315.42 32.94
cement concrete work using approved cement with Mt. 36.09 130,000.00 4,691,700.02 4,282,200.00 0.17 22,115.42 91.74%
21 the
20
rate of 2.50% by weight
batching,
mm graded mixing, Providing
transporting,
machine
of theandcement
crushedplacing,stone
fixing for
in
compacting,
aggregate of
promoting
position Feworkability,
500 steel improving
reinforcement strength,
of all
various
2.5 FORM
curing,
approved quality WORKS
including all lead
in various and lift, etc.
locationsbleeding complete
and heights 1,299.08 1,039,261.62 1327.53
achieving waterproofing properties, sq.m 1452.53 800.00 1,162,024.02 1,062,024.00 (28.45) (22,762.38) 89.44%
22 diameter
including
prevention,
confirming
as per drawings,transportation
etc. Silica
to relevant
Supplying
specifications
of concrete
Cement Admixture
IS code
and
and laying
to
in R.C.C.
site of
shall be
works including
centering, shuttering straightening,
theof various cutting, bending,
theBRICK
3. instructions
placing,
the product MASONRY
compaction, of
of20Silica
Engineer.
WORKS
finished topattern
required formworks
line and -
binding with SWGJapan annealedor superior
wire forand shall
tying the cu.m 78.16 20,000.00 1,563,200.07 - - - 0.00%
23 with
3.1
level,
meet
19/12
BRICK
protection
the
reinforcement
mm
MASONRY
requirements
thick
bars
water
and curing,
as WORKSproof
etc. all
mentioned
ply 1inwood
4 c/s&) as
( complete steel
: specification
ONEper
adjustable
SIDE FAIRFACE
drawings, props foratalleach
specifications kinds
and
junctions
of RCC
the
(binding
instructionsworks for wire
CLEAR
of materials
shall not be SILICON
and
measuredWorkmanship,
separately) WATER-REPELLANT
Division
including �all 4: the
of -
foundations,
7.2.3 Providing
Engineer, and
but columns,
laying
excluding shear
firsttheclasswalls,
cost beams,
selected
of slab,
factory
centering, -
COATNG
Concrete
waste andWorks,cut pieces, Article 2.4 for adequate
provision
staircase,
pressed
shuttering, lintel,
wire and sill,
Fairpergola,
cutreinforcement,
Face brick including
all(machine
complete nails,
made
as per
numbers of spacers, Providing
chairs, and
providing Applying
and Water
placing
propping
8.1.1 POINTING
brick)
drawings,onescaffolding,
or moreWORK
specifications staging,
brick IN supporting
BRICK
thickinstructions
and wall in cement and
MASONRY
of theusing - -
Repellant
cement mortarCoating (1:1) oncover
Exposedblocks Brick
to keepSurface
thejoints
bars in
bracing
Providing
mortar
Engineer. in and
1:4 proper
(1 cement lines: 4coarse
applying and
at level,
all levelssealing
sand) Pointing
in the Works
Silicone
BOQheavy
intendedTotal Base of items
position MC-Nisiwa
3.1.,
at all 7.2.3
levels SH or equivalent
all&complete
8.1.1: as per on or - -
with
in Cement
,superstructure duty
Mortar brown
and 1:2
other self
(1 adhesive
cement
specified :2tape,
places fineinaligning
sand)
all using
superior
drawings,
Replaced including
items
specifications
3.1, cleaning
7.2.3and and brick
instructions
8.1.1 with surface
following
of the -
to
theline
heights and
face and of levels
brick
level including
masonry
including Ties,
wall
the costPVC
includingSpacer,
oforsingle mixing
or -
brick
Engineer.
items cleaning
for 3-6C(S)-B
(Authorized chemical,lap single
length and for multi-stage
the bar
Providing
mortar, openings/
laying cutouts/ line,pockets, applying
plumbDe-
multi stage
scaffolding,
length exceeding etc.in
self perfect
standing
all
10 complete
meter in
level
scaffolding,
as
length pershalland
soaking
manufacturer's and
Brick
bricks,Masonry
shuttering
finishing inchemical,
curing,
instruction,
Works
regular
raking and(1:4 even
joints, c/s)
De-shuttering surface
provision ,allbe
as approved
for recesses,by
complete cu.m 18,000.00 -
measured
the
as Engineer
per
Cement drawingforproject
Plaster the,Works
etc.,
specification
payment,
complete
specification
on except
at all
Outer and
and
Wall
instruction
toinstruction
levels column).
as per
(1:6) of
of
the sq.m 600.00 -
openings,
the Engineer. toothing etc., all complete as per drawing,
drawing,
Engineer.
specificationsspecifications
Exterior Weather and Coat and instructions
instructions
Paint of the Engineer. of the sq.m 350.00 -
Engineer.
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) 85.54 1,539,807.91 85.55
cu.m 45.91 18,000.00 826,380.00 1,539,900.00 (0.01) (92.09) 186.33%
24 Providing and laying
first
3.3 HALF class chimney
25 BRICK WORKS fired brick( 1one : 4or c/smore ) brick sq.m 54.44 1,500.00 81,660.00 13.25 19,874.10 - 13.25 19,874.10 24.34%
thick
Providing
3.4 wall
HONEY 26 in
andCOMBcement
laying BRICK mortar
non-fairfaced 1:4WORKS (1 cementhalf(1:3 brick: c/s)
4 coarse
work cu.m 0.24 9,000.00 2,160.00 0.48 4,279.50 - 0.48 4,279.50 198.13%
sand) in foundation
masonry in & cement up to plinth,
mortar 1:4 (1 superstructure
Providing cement:4 and sand) laying andin
4. DOORS 27 WINDOWS WORKS r.m 101.10 1,100.00 111,210.00 100.30 110,330.00 101.10 111,210.00 (0.80) (880.00) 99.21%
other
honey specified
superstructure comb brick places
with one in
approved
or all
more heights
first
brick and
class thick level
fired wall bricksin
4.1 METAL
4.1.2. WINDOW 28 FRAME FRAME r.m 226.25 1,100.00 248,875.00 231.68 254,842.50 205.65 226,215.00 26.03 28,627.50 102.40%
including
in perfect
cement mortarthe
line & cost of
1:3level, single
(1 cementrequired or multi
3size stage
andposition
shapeinat
4.2 METAL 29 Providing
SHUTTER and :fixing coarse in sand) in sq.m 51.04 7,500.00 382,800.01 40.41 303,040.13 51.04 382,800.00 (10.63) (79,759.88) 79.16%
scaffolding,
any height and soakinglevel, bricks, curing, raking joints,
soak
required
4.2.1
pit in
WINDOW line all heights
and levelincluding
SHUTTER
andpressed level the
including
(folded) cost ofthe
Steel single costorof
door
provision
4.3
multi
soaking WOODEN30
stage for
bricks, recesses,
SHUTTER
scaffolding,
curing, openings,
cleaning,
raking joints,toothing
soaking provision etc.,
of theall
for sq.m 39.17 8,000.00 313,359.99 40.40 323,203.60 39.17 313,360.00 1.23 9,843.60 103.14%
and window frame of size
Providing, shown fabrication in drawings and
complete
4.3.1
4.4
bricks, UPVCFLUSH
31 asDOOR
packing per DOOR drawing,
of the SHUTTER
joints, specifications
raking (32MM)
joints, and sq.m 7.14 9,000.00 64,260.00 - - - - 0.00%
recesses,
manufacture
installation openings,
in from
position toothing
galvanized35 mm etc.,
iron
thick all complete
sheet
glazed of provision
1.20
window asmm per
instructions
4.4.1
for
4.5
drawing, SHUTTER/FRAME
recesses,
WINDOW of
specificationsthe
openings,
GRILL Engineer. andProviding
curing, providing
instructions & fixing 25x3mm 40.29 100,717.13 51.53
thick
and 32
including
ventilator hinges,made
shutter jamb, with lock 1.2mmjamb,of the base
head,
thick sq.m 54.65 2,500.00 136,625.00 128,825.00 (11.24) (28,107.88) 73.72%
32mm
GI Straps
Engineer. thick Fixed solid to core
Providing
Providing,columns flush MS and
atdoor every
solid shutters,
fixing 5th
bars tocourse
of in
door single
required of
ties
4.6 of 1.2
33
COLLAPSIBLE
galvanized mmironleaf pressed
sheet GATE GI
folded welded in required on rigidly size fixed
and sq.m 10.03 10,000.00 100,300.00 10.13 101,250.00 10.03 100,300.00 0.10 950.00 100.95%
leaf
brickor
frames
size andanddouble
24fixingmm
60mm thick
inwidth asfactory
positionper 14 detailed
gauge
mild made drawing.
PVC
welded
steel grille door The
GIlugs shutter
mesh
made
together
shape
5. FLOORING 34 by
including mechanicalWORKS
glazing means,
Supplying
with 5 mm adjustableand
thick fixing
clear with
infloat sq.m 654.34 900.00 588,906.02 608.11 547,297.20 605.89 545,301.00 2.22 1,996.20 92.93%
flush
made
anchored
with doors
of
required to shall
styles GI and be
strap, factory
rails of
allstrips, made
UPVC
complete solid
hollow
as per core block
section
design, of
splitHARDENED
position
glass
5.1
5.2. end
with
NEAT tail
local toMS
glazing
CEMENT each
make flats,
CEMENTjamb
collapsible
beads, SKIRTING including
washer
bars
CONCETEgateand
fabricated
steel
of special butt
approved
FLOOR
as per
glazing r.m 306.86 100.00 30,686.00 296.43 29,643.00 296.43 29,643.00 - - 96.60%
board59shutters
size
drawing,
drawings, 35 x specifications
24 mm
fixing bondedandposition
in with
wall phenol
thickness
instructionsusing formaldehyde
2 mm
of
approved � 0.2
thereinforcing
Engineer.
hinges
size
putty, and 2.5make
required mm thick
properly
numbers with and
Providing, mortar
fabricated sizes guards,
with in
Providing,
hardware
laying vertical
laying
like in
required
resin.
mm
5.3
fasteners The
TERRAZZO
with 36 lipping
inbuilt
including shall
edging
CAST-IN
2x coat beon of
of both
SITUteakwood
enamel sides.
DADO and Theall-round
Zinc stylesRich sq.m 35.43 1,500.00 53,145.00 2.40 3,600.00 2.40 3,600.00 - - 6.77%
to
double
hinges,door
required hardware,
channels
tower-bolts,
line, level 20strike-plate,
and 10 xmm 2mm shock
atmm 100mmabsorbers centers as
line,
the
and
Providing
Primer
6. level
flush
rails
ROOFING/ 37base and
door
motred
and coat,pattern
with
layingand ahandles,
etc.,
TERRACING 40 pattern
minimum
jointed
25 allmm complete
eye-hook,
40
thick
atthickthickness
the
WORKS IPS
corners
terrazzo thick
applying
floor
as detailed ofby IPS
finish
12mm.
cast-in-
means
in k.g 513.54 220.00 112,978.80 - - - - 0.00%
required,
and
priming
floor braced
finish factory
coat with Zinc
M.S. Rich
flat Primer
diagonal etc.,
20 all
xapproved
5mm, complete
with
with
drawing,
6.1
as
6.2
cement
Thegalvanized/plastic
of
situ following
dado
METAL
per
CGI 38 upwith with
concrete
to
specification
drawings,
SHEET
C.P.
WORKS the cement
Zinc of
fittings
height
specification
ROOFING
Rich
brackets
and
concrete
mix
(TRUSS)
Primer
shall
shown 1:2:4
of
instructions
and
be of(1
size
in of
mixcement
used:
drawing
75
instructionof x1:2:4
(a)
220
the with
of
(1
-: 2-150
2mm
the sq.m 33.54 2,000.00 67,080.00 - - - - 0.00%
top
make,
cement
sand
mm and
Handles :bottom
: 4etc., 2 sand
crushedall in rails
complete
:stone
each of
4 crushed Tasiron
aggregate
leaf; per
(b) stone 40 xaggregate
drawings,
12
Tower-bolt 40mm x 6mm and 12
�tubular with
down
300 mm
having
marble
Engineer.
Engineer. wall
chips thickness
rubbed and1.0
Providing
Providing polished
mm & and and
fixing to
stainless
granolithic
fixing
precoated steel
38mm
6.3
grade)
mm CGI
specification
and down
long 39
dia
laidSHEETsteel
atgrade)
intopand 1pulleys
ROOFING
alternatelaid
instruction
in in
each complete
alternate
panel leafthickRIDGE
of
orand the with
panel
providing
200 bolts
Engineer.
at orbottom nuts in
providing
Glass r.m 6.95 1,200.00 8,340.00 - - - - 0.00%
screws.
finish
roof under
trusses
4.1.1GIdividing
galvanized DOOR The styles
layer
with
iron FRAME ofof
rafters,
profile 19
the mm shutter
purlins,
Terracota reinforced
windcement
colour ties, concrete
sheetsby
brackets
locking
Providing
glass
6.4
dividing 40 arrangements
FACIA (&c laying
strips ) strips
(EAVES)
1and andsteppers
prefinished finished handles
plain
with including
(colour
approved Kg 69.60 250.00 17,400.00 - - - - 0.00%
each made
inserting
1:2:4
etc., leaf;
(1 cement
galvanized 2 finished
no.
:pitch 300
sand
tube mm4 with
:corrugation
of long
crushed
size approved
20 C.P.
x20
stone Aldrops
mm floor
aggregate
and 1by
(size,
applying
matching
floor
hardener
6.5
with
shape
hardener
CEMENT41
Godrej atowithand
priming
(Dreitoproofing
made
required
(Dreitop
BOARD coat
Providing,
FH
padlock;
of
sheet)
ofFH ofgradeCGI
Zinc
of mild
fabrication
equivalent
FALSE (d) Sheet
Richmm
equivalent
CEILING
125
steel
asPrimer
floorRidge
to tubes
approved
floor Cover
required
hardener)
heavy
and
sq.m 23.75 1,500.00 35,625.00 - - - - 0.00%
mm
10
mild mm
Engineer) � steel and
0.1 mm
down
sections
0.52 mmwallgrade)
of thickness.
+/- required
5% base total andThe
sizes, top
coated lock layer
including rail
thicknessofmade6duty
mm
carriage
of
size
applied
GI
7. 0.52
hardener) and
But 42
PLASTERING/ mmhoisting
as
Hinges per +/-
applied
shape 5%
and all
manufacturer's
3in nos. complete
total
asWALLper
fixinginhollowcoated
manufacturer's
eachinFINISHING as
position
Providing per
thickness
instructions
leaf. (ratespecification
1.2
and shall(TCT),
instructions
mm thick
including
WORKSfixinginclude atx sq.m 687.61 600.00 412,565.99 514.13 308,478.92 635.08 381,048.00 (120.95) (72,569.08) 74.77%
of
thick 'H'
hoisting,
(TCT), with
section,
Base required
fixing a UPVC
Material color
position marble
Thickness with section
chips
MS
(BMT) bed of size
sizes
plates,
of 0.50 100from
shoe
and
Base
including
GI
mixing
all Material
folded
height
required 6mixing
layingplates
mm Thickness
in of laying
size
required
thick Cement (BMT)
shown
in required
slope, of
inintrigal
Board 0.50
drawing
slope,
false mm including
intrigal
finishing
ceiling,
7.1
124mm
7.1.2
angles,
mm, CEMENT
mm ONtoanchor
43
Zinc and 2door
4CEILING
mm
coating mm�boltshardware).
PLASTER
nominal (1:4)
etc.,
120gsm size WORKS
andas laid
concrete
per in
IS: cement
277 grouting,
,withmarble
5-7 sq.m 320.22 500.00 160,110.00 453.98 226,990.50 296.62 148,310.00 157.36 78,680.50 141.77%
direction
(Coating
finishing and
of
using the Primer
Engineer.
appropriate as above) over ridge all
the
using
7.1.1
0.2
powder cost
including
mm
concreting
7.1.3
microns ON
ON44
fixing
appropriate
mix
wall providing
INNER
nut
OUTER
epoxy 3:1 brackets,
thickness
bolts,
primer
power
WALL
WALLand
(312.5.mm,
cement flats,
fixed
fabrication,
on :power
(1:6) 1toscrews,
trowelling
fixing thick
(1:6):
both
of
marble
the
side
trowelling
frame
shutter
cement
fixingof
painting
equipment,
powder
the
work
andandstyles
sheet mix
sand
treated
with
madeetc.
andby: sq.m 284.26 600.00 170,556.01 730.59 438,352.50 472.11 283,266.00 258.48 155,086.50 257.01%
required
equipment,
enamel
allmarble
of special
complete fixing
with etc.
Zinc
sections
as accessories
all
per complete
Rich
power
drawing, Primer,
Providing like
pressed as self
per
required
specification
and from tapping
drawing,
applying MS screw,
scaffolding
andsheet
atTheall
7means
plaster
with
7.1.3.1
polyester
7.1.3.2 two of
45work chips)
a
coats
EXTERNAL
BAND top plastic/galvanized
of of
coat by
mix
PLASTER volume
1:4
anticorrosive
15-18 (1
PLASTER including
cement
microns. iron
paints 'U'
&
Sheet 4cement
cleats.
sand)
all complete
should slurry,
in have r.m 198.80 100.00 19,880.00 - - - - 0.00%
clips,
instructions
Galvanized
levels clamps,
specification
to work and at any of
with
shape washer
and height,
the zinc
20 etc.all
instructions
Engineer.
mm etc.,
coatingthick all complete
of
complete
and the
cement consistingon
Engineer.as
plaster building
per angle
shutter
required
concrete
as frame
perINTERNAL pigment,
surface,
drawings, shall grinding,
be
ceiling filled
specifications
Providingsurface with
polishing,
and
and UPVC
at all buffingin
height
instructions
applying andof
protective
do doas
floors
7.1.4
design,
hanger
building
applying- above
including
46
as
-multichambered
as of per guard
drawing,
above, for
design,
25x25x0.55
inside
sealer
mixing in
film
Band
but
coat,
single forof
drawing,
PALSTER
specifications
specified
mortar, 100
of
etc.,
25
Plaster
panel
microns
allmm
required
cement
laying
specifications
ON high
complete
of
WALL
instructions
inlength
required
minimum
skirting.
mortar
perfect at
asshould
size
perin ofat
1250mm
line,
to
the
two
having
all sq.m 35.21 700.00 24,647.00 - - - - 0.00%
the
levels
avoid Engineer.
instructions
(1:4)WITH
Engineer.
7.2 and
scratches
47
PAINTING of8Rate
shape
CEMENT the 20
while
WORKS shall
mm
Engineer. include
thick
transportation
PUNNING preparing
cement andplaster shop in be sq.m 1003.26 200.00 200,652.00 1,131.23 226,246.51 931.70 186,340.00 199.53 39,906.51 112.76%
c/c
layers
over
level fixed
drawing,
drawings,
building allas
and to
6 to
thickness
plumbpurlins
specification
obtaining
exterior mm and
inof with
thick
20 and nut
mm
finishing
Engineer's
specified final ans
instruction
and inor
cement bolts
coat1 mm
regular with
Client'sand
of�
mortar 1:6other
the
and 0.1 (1 mm
even
approval,
with end
supplied
7.2.1
of 12.5.mm,
angle in single
DISTEMPER
48 thick length
cement
PAINT upand to 6sand meter plasterorboltsasworkdesired
totoof
7.2.2
cement
wall
Engineer.
surface
supplying,
1:6
by (1 :6hanger
EXTERIOR
thickness. fine
including
cement
Engineer. fabricating,
:6
The
being
sand)
The WEATHER
all
fine
sheet
fixed
cement
panel
necessary
sand)shall filled
delivering inwith
mortar
be allCOATnut
vertically
singleat
surface
fixed
and
overor
site, PAINT
using the
atand 12tie
multi-stage
hoisting
all
self
GI sq.m 300.38 350.00 105,133.00 778.59 272,505.63 459.55 160,842.50 319.04 111,663.13 259.20%
mix
main 1:4channel(1 cement 45x18x0.6 &cement
4 sand)
Providing running 6and
: and
Providing 3atmm
applyingthe thick
rate
and two of or24
14
7.2.3
bar mm
at
scaffolding,
and
height 49
CLEAR
two
fixing
drilling thick
includingplaces
in 1:6
providing
position,(1
SILICONby
mixing inserting
and WATER-REPELLANT
temporary fixing
mortar, coarse
horizontally
200
staging,
laying sand)
mm in 6applying
under
wide mm
perfect sq.m 175.68 550.00 96,624.00 - - - - 0.00%
cement
more
900mm
two or coatspunning
c/c
more of
to which over
washable plaster
ceilingdistemper for
section water paint tank,Septic
0.55mm of approved
thick
coat
/self in
COATNG
galvanized
gauge
7.2.4
preparation
line,
tank,Man 50
GI
level all
ENAMEL
tapping
manufacturer and
hole ofcoats
surface
rod
Chicken andPAINT
surface,
plumb
screws
ande.t.c
of
at
wire
shadeof
on
first
all
fastened
and mesh quality
height
applying
size with
finishing
concrete
over (5.5x
hundred
atincluding
nuts
junction
Zinc
55mm)
surface,
atapered
coat in
of
and
Rich
regularof percent
mixing
Providing
washers,
with R.C.C.
Primer
ceiling
alkali and sq.m 262.19 400.00 104,876.00 294.92 117,966.00 255.96 102,384.00 38.96 15,582.00 112.48%
bottom
acrylic
mortar,
and Applying
complete
masonry,wedge
paint
laying
asbeforeof
per of
in
Water 45mm
approved
perfect Repellant
manufacturer's
making with
grooves shade
line, leveland
Coating and
specification
and flanges
pattern plumb
on
by Exposed of
toand the
and
of
even
8.
EPDMone
surface
resistant
26mm
51
coat
surface
MISCELLANEOUS
seal
and
each cement etc.,
wall
having
Providing
includingall and
surface
primer one
all
complete
clips ofat
of
and
coat
necessary
all
approved
2.3mm up
heightto recesses,
applying
after any
at
erection
single pitch
including
manufacturer
613mm
or multi-
in
with
sq.m 175.68 400.00 70,272.00 - - - - 0.00%
exterior
finishing
Brick
instruction
throating,
spray/brush
including
stage
8.1 walls
Surface in of
dusting,
two
scaffolding,
POINTING two of
regular
using
coats buildings
Engineer.
WOKRS and
Silicone
dripping,
ormaking
more
of even
coats
synthetic etc.,
grooves The
surface
Base
wetting,
ofenamel
1st andrates
including
MC-Nisiwa
curing,
quality shall
paint
recesses, of allthe
SH
horizontal/
8.2
mixing
as perCEMENT52 mortar, vertical
manufacturer's BOARD
laying or curved
in WALL
perfect
specifications surfaces
line, excluding
level
to the and
surface sq.m 3.38 6,500.00 21,970.00 - - - - 0.00%
ceiling
include
necessary
or equivalent
(Plasopan
protection,
synthetic
approved
throating,
8.1.1
section
for
POINTING
costRAILING
ofceiling, orscrapping
single
etc.
enamel
make
dusting,
purlins, or and
Sintex)
all or
and
rafters
perimeter
superior ,
Rate
complete
paint color
dripping,
WORK washing
multi-stage
of
and including
shall
etc.
IN as
approved channels
the
per
all
wetting,
trusses BRICK
Supplying,
surface
scaffolding,
include cleaning
drawing
and
ofthe
manufacturer
complete curing,
MASONRY
0.5mm
including
with
as
fabrication,,making
brick
cost per of of
plumb
8.3
wall,
thick
water,
grooves 53
and
25mm
applying
and finishing
beams
high a
recesses, having
coat in regular
columns,
of flanges
approved
throating, and
canopies,
of
dusting,even
20mm
quality surface
staircase,
and
water
dripping, Kg 1478.28 220.00 325,221.61 1,508.41 331,851.04 1478.28 325,221.60 30.13 6,629.44 102.04%
surface
door
(Asian,
drawing,
protection,
Providing
cutting
fixing of using
hardware.
specification Berger
to brick
and
specification
providing
and
size
cement orboard
applying
and cleaning
instruction.
equivalent)
shape and
chicken
atwherever
in all
positionchemical,
[Rate
over
instruction
wire
levels shall
wooden
mesh
for ofsingle
Pointing also
the
at
internal or
the or
metal
Works
and
including
lobbies
8.4
30mm
base PUMP
wetting, 54 etc.,
long,
cement all
Providing,
curing,SHED necessary
all
the
primer,complete
perimeter single
fabrication
surface
protection, as of per or as
ceiling multi-stage
preparation,
providing per
drawings, design
fixed
chicken to
scaffolding wire nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 - - 100.00%
multi-stage
include
surface
Engineer.
junction
in Cement
required.
external for
in ofand
made scaffolding,
providing
required
concrete
Mortar with shade
1:2 and
9mm drips
(1 etc.at
masonry
cement
thick all
band,
any complete
:2moulds,
height,
cement etc.,
fine all as
shape, per
groove,
complete
sand)
board on the
(Shera
scaffolding,
drawings
specifications
Supply, providing
fabrication, installation
and , concrete
instruction.making
installation in position
Thegrooves Mild
rates and
atSteel
shall
wall/partition
etc.,
8.5
mesh all
SEWER,55
manufacturer's
chicken
including
as
face
or per
Siamof
recesses,
complete
atdrawing
the
wire
brick surface
Cement
throating,
with
RAIN
junction
mesh as the
,instruction,
masonry Board atper
AND help
preparation,
specificationwall
dusting, or
the
ofjunction of
WASTE
project
including
equivalent) ofof
raw
manufacturer's
and
RCC 2mx1.5m
plugs
WATER
fillers/putty,
and masonry
specification
instructionand
mixing
from
and
450mm
both etc.,
masonry,
of
mortar,
1m
and
the R.m 44.26 1,500.00 66,390.00 39.10 58,650.00 44.26 66,390.00 (5.16) (7,740.00) 88.34%
railing
include
high
c/c
etc.,
laying
sides
pump
with
to
scaffolding,
Engineer.
in
recommendations
INSTALLATION
all complete
instruction for staircase,
complete
in
fixed
scraping,
shed
finished
of
[Rate
perfect
to as75mm
theper
protectionmade
25mm
andverandah
washing
drawing
Engineer.
the
shall
line,
with
as
works
Xalso long
etc.
level
0.6mm at,dripping,
approved
all
include
and
and
50x50x6the
drive
any
other
complete
plumb
thick
surface
specification byMS
all
heights.
for
wetting,
areas
screws
the as
providing
and
C-stud
with
Angle
Engineer.
and
per @
finishing
fixed to, - - - -
curing,
including
water,
frame
230mm
PVC ,
SWR
instruction protection,
surface cutting
covered
interval,
(Soil,
of the to etc.
preparation,
outside
jointing
Waste,
Engineer. all
requiredand complete
and
Rain) shape
scaffolding
roof
[Rate fixing with
pipes shallas
and
to per
CGI
withinsize,
etc.,
also drawing
all
sheet,
required
all include
drawings,
CIVIL
drips
in
U-Track band,
regular
specification
welding WORKS specifications
and
with
joints, moulds,
andeven
spacing - SITEgroove,
surface
300mm
instruction.
installation and instructions.
DEVELOPMENT
ofchicken o/c of
[Rate
base wire
horizontal
shall
anchor The
mesh
also
plates atof -
complete
locakable
pattern, as
door,
finished per the
including
with manufacturer's
recommendedpad lock, base
filler, PCC making
56 necessary
for providing
finished
junction
,all complete of ring
surfaceRCC gaskets,
drips
ascore shall
and band,givePVC
masonry, moulds,
even fittings,
and
etc., groove,including
uniform
to complete chicken MSthe
1. SITE
frame,
include
appropriate
recommendations
(1:2:4)
openings
clamps,
CLEARANCE
central
for
75mm for
hangers, size allper
providing
light withand drawing
filled
complete as&RCC
drips
required
fittings,
cutting,
, per
band,
approved
as
access
specification
MOBILIZATION:
with cement
numbers by mortar
moulds,
design,
panel, the of and
groove,with
Engineer.
drawing,
cutouts
sq.m 159.14 100.00 15,914.00 141.88 14,187.50 160.00 16,000.00 (18.13) (1,812.50) 89.15%
57 2. wiregranules
surface.
works
PE mesh
instruction
Clearing
EARTHWORK
etc., atcomplete
towith
expansion any
and at
bolts
junction
heights.
ofhaving
theof
grubbing Engineer.
the IN
ofthejointing,
combined
EXCAVATION
works site
at
and
density
any
sealing,
masonry,
forproviding
construction
heights. :suitably
etc., byto cu.m 150.60 400.00 60,240.00 33.74 13,496.70 23.26 9,304.00 10.48 4,192.70 22.40%
and
made instructions
installation
complete theframe
ofworkspipesofofrequired
theand
at Engineer.
perimeter
any specialssize,
heights]. channels
including required
making
58 3removing
approximately
size bends,
EARTH
fixed all
holes and
150mm
finishing
BACK
complete
cutting 900 thick
kg/m3,
weld
FILLING top
as per drawing
grooves on
soil
including
joints:walls
including
Excavationto and or sealing
produce in bushes,
specification
floor and joints
smooth cu.m 6.63 300.00 1,989.00 4.50 1,350.00 - 4.50 1,350.00 67.87%
smallfiber
with
foundationstrees, leveling
tapesinsame and ofcoat
joint undulated
sealing ground,
compound, shorting
filling
surface,
Back filling
and direction
repairing applying
the ofall type
one
foundation
the itsoforiginal
toEngineer soils
of metal
and forfinish.
sides
but foundation,
primer
of foundation
excluding Pipes andthe totwo
cost
be
and
screw stacking/storing
trenches, heads footing, asof per selected
manufacturer's
pits top soil for
installation reuse in at
or
of more
with approved
painting.
installed
landscaping
coats
on soil
trenches
works,
enamel oretc.
obtained
disposingwalls to from
paint theor required
offloor
required
the
unsuitable
depth
excavation
or duct shade,
materials as per
guidelines,
including
etc.,
site all
and
drawings, complete
stacked sealing
dewatering
specifications,atas perimeter
per
site by or manual
drawings,
brought gaps
manufacturer's or with
mechanicalsilicon
specifications
from outside in
frominstruction
sealant,
means
and
layer site,
not etc.,
etc. etc.,
asall
exceeding perall
of complete
complete cmasthick
specifications
the 15Engineer. asperper with drawings,
drawing,
(compacted all of the
Prepared by contractor recommendations,
specifications � and Checkedinstructions,
instructions by Consultant, cleaning
of the ofEngineer. DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
contractor
thickness)
system, testing s own
including and machinerytransportation
ready and
for operation. equipment's,
soil,The rateRate
shall
shall include for all labour and materialsjoint
providing
spreadinginclude in the
crossing
required cost of of
track,
line metaland framing,
shoring,
level, strutting,
sprinkling required.and
screw
timbering
water,
The head
ramming,
measurement and sealing,
buttressing required
compacting
shall bewith done additional
with appropriate runningmaterials
formechanical meters,
strengthening
and all
rammers, such
fittings etctesting, member
measures
not payable etc., all for
necessary the wall to
complete as per drawing,
seperately. length
retain exceeding
in position
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
Contract
4 BOULDER SOLING : 59 cu.m 26.73 6,000.00 160,380.00 21.80 130,807.50 17.10 102,600.00 4.70 28,207.50 81.56%
Providing
5. 60
P.C.C (1:3:6) and laying WORKS uncoursed hand packed Dry cu.m 2.03 14,000.00 28,420.00 0.55 7,720.13 0.56 7,840.00 (0.01) (119.88) 27.16%
Rubble
Providing
6. P.C.CStone
61 andsoling
(1:2:4) laying
WORKS inmachine
foundation, mixed underPlainfloor Cement cu.m 9.32 16,000.00 149,120.00 21.28 340,500.00 7.95 127,200.00 13.33 213,300.00 228.34%
plinth
Concrete
Providing
7. P.C.C. of
62 with and
FOR out
nominal any
R.C.C.mix
laying special
machine
WORKS dressing
1:3:6 (1: cement
mixed ofPlainstone : 3Cementsand : cu.m 0.99 20,000.00 19,800.00 0.99 19,800.00 0.99 19,800.00 - - 100.00%
6including
Concrete
8. coarse
63
SILICA
filling
aggregate
ofCEMENT
nominal mixinterstices
) for leveling
Providing
ADMIXTURE
with
1:2:4 (1and suitable
course
cement in quarry
laying: 2insand : KG 9.90 300.00 2,970.00 9.90 2,970.00 9.90 2,970.00 - - 100.00%
waste
4foundations or stone and chips
under or quarry
floor of sand,
building, watering,
position
9.
compacting
coarse
64
STEEL aggregate
machine
REINFORCEMENT
using
) for
mixed Providing
appropriate
leveling
and machine course
mechanical andvibratedmixing all
inetc. in
Mt. 0.10 130,000.00 13,000.00 0.10 12,902.51 0.10 12,902.51 - - 99.25%
level
foundations
cement with broken
concrete and ofstone
under mix aggregate
floor
1:1.5:3 of (1 of
in building, sizeetc.
cement:1.5 not in more all at
Silica
10.
compaction
than 65
FORM25
Cement
mm WORKS
means
of
Admixture
approved Providing
with all ofcontractors
quality
structural
and fixing
including in sand:
concrete
materials, sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,296.00 2.21 1,768.00 124.23%
3level
the
position coarse
rate with of
Fe broken
aggregate)
2.50%
500 stone
by
steel M20
weight aggregate
grade
reinforcement
Supplying of the for
and
of ofsize
reinforced
cement
laying variousnotformore
handling,
11.
formwork
than 66
STONE
25 mm placing
MASONARY
wherever
of etc.
approved all
necessary, complete
WORKS
quality as
dewatering,
including per
(1:6 drawings,
c/s) cu.m 14.12 10,000.00 141,200.00 - - - - 0.00%
cement concrete
promoting workability, workto ofusingimproving approved cement with
diameter
centering,
specifications
batching,
12.
formwork
20 67
BRICK
mm
confirming
graded
shuttering
mixing, and
MASONRY
wherever machine instruction
transporting, relevant
various
necessary, WORKS
crushed the(strength,
IS
pattern
ofdewatering,
Providing
placing,
stone
code
1Engineer.
and inc/slaying
formworksR.C.C.
4compacting,
:aggregate ) ONEThe of cu.m 0.57 20,000.00 11,400.00 - - - - 0.00%
achieving
works
with
complete 19/12 waterproofing
including
itemmmincluding straightening,
thick water properties,
all proof
lead cutting,
&ply bleeding
wood bending, & steel
Random
curing,
SIDE
batching,
13.
approved
prevention,
binding 68
BRICK Rubble
including
FAIRFACEmixing,
with MASONRY
quality
etc.20
stone
all
in
Silica
SWG
lead
variousmasonry
transporting,
Cement and
WORKS
annealed
lift,
locationsworks
placing,
Admixture
wire (lift.
etc. 1forandin
:all foundation
complete
4compacting,
c/s
heights
shall
tying ) the be cu.m 0.22 18,000.00 3,960.00 0.53 9,540.00 0.57 10,260.00 (0.04) (720.00) 240.91%
adjustable
and
as
Providing
curing, perabove drawings, props
plinth
and
including for
for all
Retaning
specifications
laying all first
lead kinds class
and ofWall
andRCC
selected
lift,
Providing etc. in
the works
1:6 (1
instructions
all
and factory
complete
laying for
cement
including
14.
the
reinforcement 69
NEATtransportation
product CEMENT
ofcolumns,
Silica
bars of junctions
SKIRTING
atJapan
each concrete
or superior to site slab,
and
(binding of
shall wire r.m 4.72 100.00 472.00 4.80 480.00 4.72 472.00 0.08 8.00 101.69%
:foundations,
of6 per
pressed
as
first sand)
the class cement
Engineer.
wire
drawings,
chimneycut mortar
Fair Face
specifications
fired shear
including walls,
brick and(machinebeams,
providing
the made
instructions
placing,
meet
15.
shallMETAL 70 the
not compaction,
requirements
WORKS asbrick
finished
Providing,
FOR mentioned
FENCEone
to layingor
required in morein linebrick
alland
required
specification k.g 1697.69 220.00 373,491.79 1,227.30 270,006.00 1227.30 270,006.00 - - 72.29%
staircase,
through/bond
brick)
of materials
thick
level,
line,
of thelevel onebe
Engineer.
wall
protection ormeasured
lintel,
in
and and
stone
more
cement
sill,brick
and
pattern
separately)
pergola,
at required
mortar
curing,
Workmanship, 40 thick
mm
Providing 1:4
including
etc. wall
thick(1all
including
interval
Division
and in
cement
complete
IPS
nails,
including
cement
floor�
installation : 44:finish
coarse
as per
in
waste
16.
propping
providing 71
METAL and cut pieces,
WORKS
scaffolding,
single provision
or multi-stage FOR
staging, GATE for
supporting
self adequate
standing and and k.g 130.78 220.00 28,771.60 123.31 27,128.09 118.89 26,155.80 4.42 972.29 94.29%
mortar
sand)
drawings,
with
Concrete
position in1:4
cement MS (1concrete
foundation
Works, cement
specifications
angles Articleup
of :of 4coarse
tomix
andplinth,
2.4
required the sand)
1:2:4sizes (1 in
superstructure
instructions cement
as shown of
: 2inthe
numbers
bracing
17.
scaffolding, 72
ON
,superstructure inof
OUTER spacers,
proper
curing,and lines
WALL chairs,
Providing,
and
protection,
other (1:6): providing
level,
specified fabricating
etc.,sealingall
places and theplacing
complete
in and
joints
all as sq.m 7.92 600.00 4,752.00 7.80 4,680.00 7.80 4,680.00 - - 98.48%
other
Engineer,
sand
drawings
cement :specified
4 but
crushed
for
mortar line,places
excluding
stone
(1:1) corner, in
cover all
the
aggregate
end, heights
cost
blocks of
12
bracing and
centering,
mm
toapplying
keep level
post,andthe down
topbars and
installation
with
per
18.
heights
including 73 heavy
drawings,
EXTERIOR and the
of
duty
level 4000
cost
brown
WEATHER mm
ofProviding
specifications
includingsingle
x 1800
self adhesive
orand
the and
COAT mm
cost
multi ofmils
tape,
PAINT
stage single steel
aligning
ator all in sq.m 8.87 350.00 3,104.50 8.28 2,898.00 8.28 2,898.00 - - 93.35%
shuttering,
grade)
bottom
intended
entrance
to line
levels laid
rail
gate
and shape
and and
in
including
position
levels reinforcement,
alternate
fabricated
20 at all
including
mm panel
applying
levels
with
thick or
Ties, all
all
50 onemm
cement complete
providing coat
complete
PVC dia Zinc
MS
Spacer,
plaster asas
Glass per
Rich
per
pipe
in
instruction
multi
19.
scaffolding, 74
CHAIN stage of
self
LINK the
soaking engineer.
standingFENCE
bricks, Providing
scaffolding,
(50
curing, x approved
50 MESH) and
soaking applying sq.m 184.58 1,000.00 184,580.00 168.00 168,000.00 168.00 168,000.00 - - 91.02%
drawings,
dividing
Primer
drawings, and specifications
stripspaintingand
specifications finished
with and
two
and instructions
withcoat
instructions ofrakingzinc of joints,
the
floor
paint,
perimeter
Providing
building
two
bricks,
provision
20.
Engineer.
hardener
etc.,
or more
75
FLAGallcement
frame,
openings/
exterior
curing,
for
POLE
(Dreitop coats 25
raking
recesses,inof mm
cutouts/
specified
first
joints,dia
openings,
FHDe-shuttering
of
vertical
quality pockets,
cement
provision
Providing
equivalent hundred
toothing
post
floor forof
applying
mortar
1.2 spacedthe
percentwith
recesses,
meter
etc.,
hardener) all
at
De-
nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 - - 100.00%
Engineer.
100
shuttering
1:6
acrylic mm
(1 paint (Authorized
o/c, 1.2
chemical,
of :6 mm
fine
approved sand)lap
thick length
plate
shadein all and and
band as
surface for
from
approved
pattern the
at both
all
to bar by
openings,
high
complete
applied
21.
complete
length
side 76 chain
METAL
at as toothing
as
exceeding
the
link
asper per
Providing fence
RAILLING
per
center, drawing,etc.,
manufacturer's
drawings,
10
making
having
meter
all complete
mesh
andspecifications
fixing
specification
in
locking length
size as
inarrangement,
instructions position
shall
per
50mm
and
and 75the
drawing,
including
be
xmm K.g 63.98 220.00 14,075.60 198.94 43,767.24 - 198.94 43,767.24 310.94%
the Engineer
height ofetc., complete atheavy
all levels asshallperwire
exterior
50mm
instructions
dia
mixing
instruction
measured
bottom 8.5 including
specifications walls
woven
meter
laying
for
holding of
of
and
with
the
long
in
the
the
mixing
buildings
instructions
SWG
Engineer.
GI
required
Providing,
Engineer.
payment,
down pipe mortar,
10 etc.,
flag
slope,
except
of laying
The
pole
fabrication the
intrigal
to
GIrates
with as
in
Engineer.
coated
column).
perfect
round
finishing
per design cap - - - -
drawing,
line,
include
with
at
using toplevel
50x50x5forspecifications
includingand
appropriate
plumb
scrapping
mm flag ISA
power ,bolts,
and
hoistingand
washing
line fixing
instructions
finishing
post
trowelling rope the
spacedgate
in
surface
with
equipment,
leaf
of
regular
at
ring
to
the
with
2.5 and and
meter
etc.
77 drawings
column
CIVIL
Engineer.
even
water,
and
post
WORKS
surface
applying
installation
using
including
a - bush
coatRESERVOIR
of type
all in position
hinge,
necessary
approved WATER Mild
finishing
single
quality
Steel
or
water metal
TANK
multi- sq.m 22.31 100.00 2,231.00 22.31 2,231.00 22.26 2,226.00 0.05 5.00 100.00%
center
pulley
all
railing complete to
on center,
installation
stair as and 50x50x5
per of flag coats
drawing,
above mm
pole
retaning corner
by excavating
specification wall, and andend
andother post ,
78 1. surface
stage
1.2
base
50x50x5 EARTH
EARTHWORK
cement with
mmWORKS
scaffolding, two
primer,
ISA ormaking
more
IN
surface
bracing grooves
EXCAVATION
post of
preparation, enamel
at every and recesses, with
:scaffolding
15 meter Zinc cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.02 9,608.00 0.55 220.72 99.97%
foundation,
instructions
areas
Rich including
Primer, foundation
of the
etc., cuttingEngineer.
all filled
to
complete requiredwithas percement
shape drawings,andconcrete,
size,
79 1.1 throating,
etc.,
-1.3
straight
etc
welding doall
SITE
-allas
EARTH run CLEARANCE
dusting,
complete
complete
above,
joints, BACK
and at dripping,
asevery
perdrawings,
FILLING
asinstruction
but per
for
installation the
100
&
change mm
of
MOBILIZATION:
wetting,
Excavation
manufacturer's
: high
base
curing,
inspecification
direction
anchorskirting.
in
platesmore and of cu.m 4.02 300.00 1,206.00 4.01 1,202.85 3.46 1,038.00 0.55 164.85 99.74%
80 1.4 specification
Clearing
protection,
foundations
recommendations
than 15 degree
BOULDER and inandgrubbing
providingall
and type
and
SOLING atBackendofthe
chicken
as soils
approved of
site
filling
:and the
wire
for
corner for Engineer.
mesh
by construction
infoundation,the
foundation
post, atEngineer.
the
40x40x5Civil and cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,480.00 (0.00) (18.00) 99.86%
instruction
appropriate
works
by removing associatedofsize the
150mmwithEngineer.
with required
this
thick Associated
work
top numbers
except
soil civil
of
todepth
including metal works
81 2. junction
trenches,
sides
mm
shall ISAof
be of
top
paid concrete
footing,
foundation and pits
bottom and
with
Providing
separately. etc. masonry
to
approved
rail the laying
including
and etc.,
required
soil all complete
obtained
installation
uncoursed cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,920.00 (0.00) (15.75) 99.86%
expansion CONCRETE boltstrees, WORKS
shall
bushes,
as
of per
including
from
hand
2.1 all
P.C.C
be
the
post
packed
measured
small
drawing dewatering
excavation
by , of
excavating
Dry
2.1.1
required
Rubble
P.C.C
leveling
specification
atby site hole
Stone
(1:3:6)
size,
andand
manual of providing
undulated
or
stacked
and solinginstruction
mechanical
filling inatwithsite
required
of
or the
82 2.2 size
separately.
ground,
Engineer. bends,
P.C.C. finishing
FOR
shorting
[Rate R.C.C.and weld WORKS joints
stacking/storing to:for produce smooth
selected cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,200.00 0.00 95.00 99.93%
means
brought
concrete
83 foundation,
Providing
surface,
etc.
from
1:2:4as
and
applying
per
under (1shall
outside
laying cement
floor
one
also
specifications
in
machine
coat : include
layer
plinth
Providing 2ofsandnot
withwith
mixed
Metal exceeding
: 4out
and
providing
all
stone
Primer any
Plain
laying 15 cm
special
Cement
and
in two Kg 74.20 300.00 22,260.00 22,230.00 0.05 14.25 99.93%
2.3
top SILICA
soil
drips (compacted
contractor
thick band, for � CEMENT
reuse
moulds,
smm in
ownincluding groove,
machinery
thickness) ADMIXTURE
landscaping chicken
and
including works, disposing
wire stretching
equipment's, mesh at 74.15 22,244.25 74.10
aggregate
dressing of20stone and down grade),
filling rails,
interstices 3 with
84 Concrete
or
position
unsuitable
2.4
junction
providing
chain
suitable
more
STEEL
transportation link of
of
coats
machine nominal
of enamel
materials
REINFORCEMENT
RCC
crossing
fabric,
quarry
mixed
and
ofwaste
soil,
fixing
mix from
masonry,
offor track,
1:3:6
paint
and
Providing
spreading
or chain
stone site,
shoring,
(1required
ofetc.,
machine
link
chipsin
cement
etc., and
to
required
fabric
or
vibrated
all mixing
complete
strutting,
:shade,
complete
line
securely
quarry
sand :
sand, the
andin Mt. 1.46 130,000.00 189,800.00 1.58 204,902.61 1.58 205,400.00 (0.00) (497.39) 107.96%
6etc.,
cement
Silica
as coarse
per all aggregate
complete
concrete
Cement
drawings, of as
Admixture ) per
mix
specifications leveling
drawings,
1:1.5:3
Providing (1 course
of in appropriate
and and specifications
cement:1.5
structural in concrete
instructions
fixing in sand: at sq.
85 2.5 works
timbering
level,
all
watering, FORM
post, at any
and
sprinkling
top heights.
WORKS
and
compacting buttressing
water,
bottom with
ramming,
usingrail, etc.,
appropriate compacting
all complete materials
mechanical with
in allper
as 54.93 800.00 43,944.00 56.46 45,170.80 56.46 45,168.00 0.00 2.80 102.79%
3foundations
and
the
of
position
and theinstruction
coarse
rate
allwith aggregate)
of
Engineer.
Fe
such 2.50%
500 of
measures
under
steelthe
by M20
weightfloor
Engineer.
grade
reinforcement
necessary
Supplying
of the
of building,
for
andtoof reinforced
cement
of
retain
laying
etc.
variousin forposition
m
sq.
86 3. mechanical
PLASTERING/
drawings,
compaction
level
cement concrete rammers,
specification
means
broken WALL
with
stone
workto testing,
and
all
aggregate
using etc.,
FINISHING
instruction
contractors
approved all complete
size WORKS
of
cement the
materials,
not more as
with 33.66 700.00 23,562.00 35.46 24,824.45 35.46 24,822.00 0.00 2.45 105.36%
promoting
diameter
the
centering,sides of workability,
confirming
the
shuttering foundation of improving
relevant
various pit and IS
pattern strength,
code
including in
formworksR.C.C. m
sq.
87 43.1 per
Engineer.
handling,
than
20 drawing,
CEMENT
WATER
mm 25including
mm MS
placing
graded PROOF
ofspecification
PLASTER
work, etc.
approved
machine excavation
allcrushed
COATING and instructions
WORKS
complete
quality for asfoundation
including
stone per
aggregate of the
drawings, andof 33.66 550.00 18,513.00 35.46 19,504.93 35.46 19,503.00 0.00 1.92 105.36%
achieving
works
refilling
with
Engineer.
3.1.1 19/12 the
Internal waterproofing
mm excavated straightening,
thick
Plaster water
on properties,
material
Wall proof cutting,
with
(1:4) ply bleeding
with wood bending,
watering, Cement &+steel m
concreting
specifications
Providing
formwork
approved shall
and
wherever
quality and be
applying paid
ininstruction
necessary,
various separately.
MC- of the
Dichtament
dewatering,
locations Engineer.
and DS
heights The - - - -
prevention,
binding
ramming,
adjustable
Punning with etc.
leveling
props 20 Silica
SWG
for theallCement
annealed
site
kinds and Admixture
wire
disposing
ofwater
RCC for
works
12.5.mm, offshall
tying the
for the
thick be
88 BILL complete
Nafufill
batching,
including
the product item
BB2
mixing,
3.
of (
NO.transportation including
Crystallization
ELECTRICAL
Silica transporting, all lead
ofoutside
concrete &
placing,
WORKS lift.
proofing
to compacting,
site slab,of No 1.00 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 - - 100.00%
reinforcement
surplus/unusable
foundations, bars
columns, earthatJapan
each
towork
shear or superior
junctions the and
(binding
construction shall wire
89 A.
cement
system)
curing,
placing,
meet
1.2.
shall Common
Stand
not
and
or
theincluding
be
sand
equivalent
compaction,
Alone
plaster
Installation
requirements
measured DP&
6allApergola,
lead andwalls,
assuperior
finished mentioned
MCB
separately)
of required
lift,
to mix
with by
etc.beams,
in
1:4
coating
all
Enclosure
including
(1
line cement
complete system
alland
specification No 1.00 8,500.00 8,500.00 - - - - 0.00%
premises,
staircase,
&
on 4per
as CABLES newsand) etc.
lintel,
and
concrete
drawings, all
3 sill,
mmcomplete
structure, thick
specifications asincluding
cement
sunkenperand drawings,
punning
slabs, nails,
roof over terrace R
90 2. level,
1.1.
of
waste Stand
materials
specifications
propping protection
and Alone
cut and
& and
pieces,
andWIRES 40 curing,
A
Workmanship, DP
provision
instructions etc.
MCB forall
of the with
Division
Supply,complete
adequate Enclosure
Engineer. � 4: as per 60.00 800.00 48,000.00 60.00 48,000.00 60.00 48,000.00 - - 100.00%
plaster
and
the
2.2. chemical forscaffolding,
instructions
2 Nos water
2.5 toSq tank
be
of mm mixed
the staging,
on concrete
Engineer.andthe
Multistranded
supporting
apply surface,
asCu per and
ceiling
the m
91 bracing drawings,
Concrete
installation,
numbers
surface inof
and
specifications
Works, testing
spacers,
proper
wall Article
lines
surface and
chairs, andand
2.4
commissioning
Supply,
at providing
level,
all height
instructions
installation,
sealing Supply,
and ofWire
including the of+the
factory
placing
testing
joints
1
R 50.00 250.00 12,500.00 - - - - 0.00%
instruction
No
Engineer, 1.5
installation,
fabricated Sq of
mm
but
and the
testing
factory manufacturer,
Multistranded
excluding and the
assembled costCu
commissioning application
wire
of centering,
recessed of on factory
mounting
92 concrete cement
&
with
mixing
B. commissioning
SCHOOLheavy mortar
mortar, duty (1:1)
BLOCKS brown
laying ofcover
following
inself blocks
perfectadhesivesizes to keep
line, of
tape,
levelPVC theand bars in
aligning m
No 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 - - 100.00%
shuttering,
fabricated
dust and surface
and
verminand and
reinforcement,
factory
proof, pressure assembled
fully grouting
allconductor
enclosed complete
recessedby
steel injection
asper per
93 insulatedintended
to DISTRIBUTION
plumb
1. line and position
multistranded
levels
finishing at integral
all
including
in levels
Copper
regular Ties,alland complete
PVC even Spacer, as
surface
system
1.2.
drawings,
mounting
enclocure First withFloor mixing
specifications
dust
suitable DB
and to (BOARDS
DB-2)
vermin
accomodate waterproofing
andIncoming
instructions
proof, 6 Afully NEA:
Din of the
enclosed
Bar 1 No 1.00 22,000.00 22,000.00 1.00 22,000.00 1.00 22,000.00 - - 100.00%
drawings,
cables/wires
Providing
including specifications
of
openings/
all 1.1
necessary KV cutouts/ and
grade
single instructions
to be
pockets,
orIncoming
Supply, drawn
multi-stage of
applying
installation, in the32 mm
De-
94 steel xcompound
1.3. 25A
Engineer.
mounted Second DP
enclocureDP MC-
MCB Floor
MCB Special
Incoming
DB
suitable ( DM
DB-3)
to
asDe-shuttering
a,lap
stand or
Solar: equivalent,
accomodate
alone 1
protection x 10A
NEA:
stand DP No 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
Engineer.
dia 2 mm (Authorized
thick PVC pipe length
for 2 Nos and 10 for Sq the mm barCu
95 1length
shuttering
scaffolding,
testing
including
MCB
alone
1.4. 1 x66A
breaker 25A 40and
Outgoing
DP A
chemical,
required
providing
commissioning
surface
DP Din
MCB MCB NEA:
Bar preparation,
with
at10 mounted
Admin
making
Incoming
Enclosure of
or DPgrooves
factory
cleaning,
5 xMain 16
Solar: A as
MCB
Block
approved
SP MCB and
fabricated
repairing
asall 1atoxstand
by
and
10A
be 1+ No 1.00 8,500.00 8,500.00 - - - - 0.00%
thex6 Engineer Sq exceeding
mm Cu meter
Multistranded inat length
and 20shall be
96 DP
recesses,
xfactory
loose
alone
supplied
2. A
MCB
CABLES pockets
SP throating,
assembled,
MCB
protection
at
etc.,
inWIRES
Outgoing
Male
&
complete
dusting,
sheet
concrete,
Outgoing
breaker
and NEA:
Female
steel
treating
Solar: all
dripping,
clad
required
Supply,
Toilets
levels
powder
2xto x1.5 16 xmm
construction
2at as
wetting,
6AA
Admin
installation,
complete
PVC
per
coated,
SPSPMCB as or Rm 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 - - 100.00%
measured
Pipe
drawing,
curing, for 2 for
Nos the
specifications
protection, 2.5 payment,
Sq
etc. mm and
all Cuexcept+ 1
instructions
complete as column).
Sq
per of mm
the
alldrawing Cu
97 testing
recessed
joints,
MCB
Main
required.
as
2.2. deemed Nos 6mounting
curing,
22Distribution
xand
Block all3protection,
2Acommissioning
xSP
4including
Sq
A
MCB
mm
SP
completedust MCB and
Supply,
fixing
Multistranded
flood
Outgoing
as vermin
of test,
required.
factory Solar:
installation,
hardware, Cu
proof,
etc. MCB
fabricated
fish
Wire
double
testing
wires+SWG2:1 xNo
and3,
&
etc. Rm 15.00 500.00 7,500.00 15.00 7,500.00 15.00 7,500.00 - - 100.00%
Engineer.
specification
door
complete
Neutral
A SP &asEarth and
per instruction.
Boards
drawings,
Links -1orfabricated [Rate
specifications
Set shall
from also
14
and
2.2.
MCB 2 MCB
HPL/IndoAsian
factory
commissioning
as required :Nos 2.5
assembled
HPL/IndoAsian
allthe Sq of mm
or
complete. following Multistranded
equivalent.
recessed The mounting
equivalent.
sizes
Cables of and Cudust
PVC Wire and
insulated
Conduit +1
98 2.5 include
sheet Sq
instruction
Neutral
mm
steelfor
&
Multistranded
providing
provided
of
Earth with
Engineer.
Links drips
-1
Cu
Set band,
hinged wiregasketted
(Minimum moulds, 10 groove,
door
years Rm 30.00 250.00 7,500.00 30.00 7,500.00 30.00 7,500.00 - - 100.00%
No
vermin 1.5 Sq
proof, mmCopper Multistranded
fully enclosed Cu point
steel wire
enclocure suitable
99 multistranded
shall
etc.,
with
3.General
guarantee
to
becomplete
to
locking
accomodate
drawn
service
shall from
facility
6be Athelight the
works
and
provided
Din
conductor
existing
point at
including anycables/wires
wiring
against heights.
suitably
the assuming
DPcompleted rated of 1.1 the Pts 46.00 700.00 32,200.00 39.00 27,300.00 39.00 27,300.00 - - 84.78%
KV
existing
copper grade towiring,
point
phase be drawn
isLight
bars, in Admin
Earth inBar&
mounted
recessed
Block
Neutral ofmounted
the
Links
MCB
existing 20 mm as a
100 work). Supplying,
3.2.2Two
stand
dia
block mmalone
of
Way
the protection
thick school. PVC
testing
Point
pipe
The breaker
Pipe
and
as
commissioning
required
deemed
shall be at all
including
laid toiletand Pts 1.00 900.00 900.00 3.00 2,700.00 3.00 2,700.00 - - 300.00%
101 putting complete
3.3.
blocks Ceiling into
Male as operation
required.
and
and Exhaust
Female Make
of lights,
Fan
all ofPoint
DB
completeceiling & breakers:
Wiringasfans,required. exhaust Pts 14.00 900.00 12,600.00 4.00 3,600.00 4.00 3,600.00 - - 28.57%
fixing
underground
HPL/IndoAsian
fans hardware, i.e.or fish
50 mm wires
equivalent. below etc. as required
finished
All MCBsground all
shall be
102 4. MCB 6Apoints
complete.
level. Universal
Cables:
using
: HPL/IndoAsian.
Cables: pin
Havells
2.5 sq
Light
Havells
mm
Nepal powermulti
Nepal
/PVC
Nepal
stranded
point
/ insulated
Nepal wiring
Cable. Cable.
copper Pts 28.00 700.00 19,600.00 28.00 19,600.00 28.00 19,600.00 - - 100.00%
10 kA.
conductor,
Supplying, Refer 1100 SLD
wiring, volts for
testing details.
grade, and commissioning wires
103 5. 2.1.
1.1.
drawn 2Ground
Switch Nos
through 610
Socket Sq Sq
Floor mm Outlets
mm DB
pre-installedMultistranded
Multistranded
(DB-1) 20 Incoming
mm Cu CuWire
dia Wire
NEA:
rigid +1and
+PVC 1No No 28.00 900.00 25,200.00 28.00 25,200.00 28.00 25,200.00 - - 100.00%
putting
4No Sqinto operation for 6Fan/Wall
ACulight power point
104 6. 1Sqx640A
Sweep
conduit mm mm
as Multistranded
Multistranded
Ceiling/Exhaust
DP MCB
a cable sleeve Cu
Supply,
Incoming wire
concealed installation,
wire
Solar: inFan wall and 1 xfloor No 2.00 6,000.00 12,000.00 24.00 144,000.00 24.00 144,000.00 - - 1200.00%
using 2
interconnection, x 2.5 sq mm
testing + 1 x
and 1.5 Sq
commissioningmm multi
105 7. 16A Light
including
stranded DP Fixtures/Luminaires
MCBall fixing
copper Outgoing and connecting
conductor, NEA:
1100
& Supply,
Accessories
volts 1 x 16ofPVC
installation,
materials.
grade, A
The DP Nos. 24.00 2,700.00 64,800.00 24.00 64,800.00 24.00 64,800.00 - - 100.00%
following
106 interconnection,
MCBfor
rate pointtypes
2 xwiring25 of Amodular
testing DP
shall and
MCB formation
commissioning
include Supply, the flush
2 xcircuit 16 Aand
storing, SP
7.2.
insulated
mounted
putting
12 W
assembling,
LED
wires
switch
into operation
Surface
drawn
socket
installation, of
Mounted
through
including
following
testing preand
Cylindrical
GI installed
box
sizes to
of
commissioning 2wiring
be
sweep
type
mm Nos. 13.00 2,400.00 31,200.00 13.00 31,200.00 13.00 31,200.00 - - 100.00%
MCBLED
from deginated 2 x 6Light A SPmade
Distribution MCB Outgoing
Board (DB) Solar:
107 thick CRCA
7.3.
installed HDP
ceiling/exhaust
Powder
Wall
in pipe,
specified
Coated
cable
fans as
withofPMMA
sleeve/support
location
per
high
and grade
height butup
Diffuser to the
die-cast
including
all Nos. 2.00 1,800.00 3,600.00 1.00 1,800.00 1.00 1,800.00 - - 50.00%
108 having of xfollowing
27.4.
first 10
aluminium WA
9light/fan/
6000DPPowder
LED types
MCB
K control
Color
Surface wall/ceiling,
Coated 2 xdrawing
switch
Mounted 3on
with A SP
wards
PMMA specification
surface/recessed,
MCB
Cylindrical toDiffuser
light/fan
typeAll Nos. 1.00 2,000.00 2,000.00 - - - - 0.00%
specified
complete.
including
LED lighting dia
Make:
the pipes
extended
fixtures concealed
Polycab hanging
with in rod
/ constant
Legrand wall as and
currentdeemed.floor isolated
109 driver Neutral
then the
Temperature,
having
CRCA &
6000
Powder Earth
looping K IP20 Links
between
Color
Coated rated. -1
with Set
switches
PMMA /lights/fans/
Diffuser etc.
including
7.5.
5.1 6W all
LED fixing
Recessed and connecting
Circular type materials.
CRCA The Nos. 3.00 1,800.00 5,400.00 - - - - 0.00%
(No6A
speed cable
Temperature,
having
rate for
Universal
regulator
and
6000
point
making
jointing
K IP65
ofpower
Color
wiring
ceiling
connections
is allowed
rated
shall
Switch
fan except
with
include
shall
7
Socket
with
W
be
LED
the
1.5 electronic
switch
circuit
Sq.mm
Lamp. andwiring
Cu
110 MultistrandedPowder
7.6. 7suitable
type Coated
W The LEDcost for with
T5modular
wire Slim PMMA
with Mirror
light
fixing Diffuser
Light
switch
and having
board.
connecting 6000 Nos 1.00 2,000.00 2,000.00 - - - - 0.00%
fixture).
Temperature,
from deginated IP20 shall
rated.
Distribution be including
Board rigid
(DB) PVC
up to the
111 K 8. Color
Exhaust
Pull Box
materials
conduit,
Temperature,
fan shall
completeformation
modular have IP20
operational
as per specification.controlbetween louver and
The Light No 3.00 700.00 2,100.00 3.00 2,100.00 3.00 2,100.00 - - 100.00%
112 9. first
rated.
switching
fixtures power
External shall point
shall
post bebe thenmade
Supply,
Direct
top lightthe by looping
Backlit
pole modular
fabrication LED and sockets.
switch
having and
UL fan No 3.00 7,500.00 22,500.00 3.00 22,500.00 3.00 22,500.00 - - 100.00%
switches/electronic
The cost shall be fan dimmers integrated in multi
113 10. terminals
installation
Class
modularPost 2, THD shall
plate
Top beexcluding
ofExternal
flushed connected
250x250x100
<10 %, P.F. inSupply,
Light
modular
0.9,
required viaCRI&gt;=
mm
Fixtures ceiling
wallceiling
Erection,
size
formation
of rose.
GI 80,box,
Testing Make: GI No 3.00 9,800.00 29,400.00 3.00 29,400.00 3.00 29,400.00 - - 100.00%
switch sockets
Finolex/Usha/Bajaj
mounted recessed and their
type flushing GI box but
114 11. Burning
and
fish wire,Life&gt;40,000
commissioning
Earthing cuttingand and
Lightning 3Pull
offilling hours,
meter Box
chases
Supply, high
protection at specified
lumen&gt;80.
62.5
for mm dia
recessed
installation, Nos. 3.00 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 - - 100.00%
including
6.1
Make:
steel 225
locations mm GIdia
made fish
Philips/Legero/Wipro
tubular externalM/D
out wire,
of 2
lightcutting
exhaustmm thick
pole or and
fan hotfilling
equivalent.
suitable dip for chases
the for
115 11.2 pipesEarthing
recessed as deemed
interconnection
11.1. Chemicalpipes Bar
as as
testing
Earhting per &
deemed drawing
putting
astop per andintolay
drawing out
operation
and planlayof all
out Nos. 3.00 2,200.00 6,600.00 3.00 6,600.00 3.00 6,600.00 - - 100.00%
galvanised
7.1.
mounting
complete.18 W of MS
LED
Modular sheets
Surface
specified having
post
switches Mounted four
and lightFan corner
Square toptype
fixture.
dimmer counterThe shall
116 300 Supply,
plan
12.
shunk
mm
GI allsteel dia
Strip/Cu polycarbonate
Installation,
complete. wire Supply
testing,
Earthing make post
installation,
commissioning light and Mtr. 65.00 300.00 19,500.00 65.00 19,500.00 65.00 19,500.00 - - 100.00%
CRCA
pole
be
fixture shall
- Polycab
interconnection,
putting to
into bescrews
Powder
be fixed
operation
Coated
/embedded
Legrand. in
testingopening
above
of
with
1200x50x6
and meter
Cables: stainless
PMMA
mentioned
putting in the
Havells in
mm
steel
Diffuser
ground
to Nepal
light
GI
cover.
pole
operation
Earth with
/
Supply
The pull &box laying hsall ofbeHot Dipped
suitable for G.I.
four(80 sides micron) entry
having
concrete
Nepal
suitable
of
Bar earth
with
earthing
6000
Cable.
for
station 12
14cable
strip/
K
mm W
Cu
Color
asdia LED ISbulb
perholes(stud)
wire. 3043. complete
Complete
of suitable with with all
numbers all of
Telephone
Temperature,
foundation
3.1.
fixing One and way IP20
as light
per
connecting
materials, pipes rated.
drawings
point
including complete as&
all complete.
testing per commissioning
complying
12.1.
drawing 25 x
and 3themm
site number
GI Strip
conditions. of Earth strips to be
materials
of maintenance and accessories.
free Chemical earthing of Dual be Pipe
Prepared by contractor connected technology.
to Earth
2 meter Checked Bar.
long with
The byEarthConsultant,
Outer The
Bar shall
dia. of DSC
76 mm Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
housed in enclosure made of Bricks. enclosure
inner cover
and front dia of plate 38 mm shall with be80-100
made from micron SS 304 of
galvanization
370x370x3 mm. . The TheEarthingwhole assembly Electrodeshall shallbe be
placed inside
concealed in such the removable
a way thatperforated the SS 304PVC frontPipe cover of
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity Remarks
No. As per Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
Contract
117 12.2. 12 SWG Cu wire Mtr. 15.00 200.00 3,000.00 20.50 4,100.00 20.50 4,100.00 - - 136.67%
118 13. Earth Test link No 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 - - 100.00%
119 Design,
14. fabrication
Lightning Arrester and installation Earth Test Link No. 1.00 7,500.00 7,500.00 1.00 7,500.00 1.00 7,500.00 - - 100.00%
120 suitable
C. SOLAR for PVGI strip.
SYSTEM Supply, installation, testing No 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 - - 100.00%
121 andTubular
1.
2. commissioning
Solar PVDeepPanelcycle of Battery
Air Finial Lighting Arrestor No 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 - - 100.00%
122 (including
3. HybridReceiving, 20 mm
Inverter dia. 1200
installation
Receiving, mmand long
installation GI
andRod and
interconnection No 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
Connection
of RETS
interconnection
Receiving, wire)
Certified ofmounted
Poly
12V
installation and Tubularon top
crystalline Deepof the
solar
interconnection building
cycle solar
of
123 D. FIRE
and electrically EXTINGUISHER
connected to therated
ground Nos. 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 - - 100.00%
photovoltaic
battery
Selectable
a) Supplying of Low module
input
Fire voltage with90-280
extinguisher IP65
self-discharge,maintenance VAC
ABC andthrough
juction
stored box a
output
Pressure - - - -
25
mounted
free,sealedmm X with Aluminium/GI
no leakage design,High Module including andall
124 volatge
5.0kg
3BILL mm
230
size
No.
GI 4.VAC
ABC
strip
� 5%
stored
SANITARY
to the
with
pressure
separate WORKS typeVibration
frequency
earthing Fire
as
50/60Hz
per Rm 46.00 1,600.00 73,600.00 60.00 96,000.00 60.00 96,000.00 - - 130.43%
suitable
Temperature
(Auto
extinguisher. fixing
sensing) materials,
Resistant withconnecting
RETS wire
Certified
and transfer time 20 ms of power 2.5 and
125 A.
- 25PIPING
drawing.
cables.
including mm WORKS
distilled water, allHybrid
fixing inverter
and connecting Rm 10.00 1,000.00 10,000.00 8.00 8,000.00 8.00 8,000.00 - - 80.00%
KVA 24 Volt single phase
Providing with
126 1.1.
- 20 24V
materials
external mm MPPT250W
with properPV
and Module ofand
sizecharge
solar
fixing
battery in position
rack.
controller Ah. Make: Rm 11.00 700.00 7,700.00 3.00 2,100.00 3.00 2,100.00 - - 27.27%
127 of
-Su-kam15allmm
Efficiency work&gt;90items with
%,orWh allEfficiency
necessary fittings
&gt; 75%. Rm 2.00 500.00 1,000.00 2.00 1,000.00 2.00 1,000.00 - - 100.00%
complete / Luminous
with testing equivalent
and ready for operation as
128 Make:
b) Su-kamIron
Galvanised / Exide
Pipe orofequivalent.
Medium Class including Rm 6.00 2,600.00 15,600.00 - - - - 0.00%
per
2.1. drawings,
12V, specifications, manufacturer's
129 MS mm 200Ah@C10
40 clamps
-recommendations and brackets, Tubular
nails Solar
and
and instructions. The rate
Battery
hooks, and all Rm 6.00 1,600.00 9,600.00 - - - - 0.00%
130 necessary
c)
shall CPVC includeGI specials
Ball Valve
for positionrequired for complete
marking, maintain line, No. 2.00 2,000.00 4,000.00 3.00 6,000.00 3.00 6,000.00 - - 150.00%
131 installation,
- 25
level40 mm or grade cutting,
wherever jointing, sealingsand
required, of joints etc, No. 2.00 900.00 1,800.00 1.00 900.00 1.00 900.00 - - 50.00%
installation
filling/compaction, of pipes and specials including
earth cutting and backfilling, making
132 -holes
20 mm and cutting of grooves on walls or No. 2.00 400.00 800.00 - - - - 0.00%
133 cutting,
d) 40 mmchasing diasame
Gun Metal walls,Check plasters valveorfloor
tiles andetc. and No. 1.00 4,500.00 4,500.00 - - - - 0.00%
repairing
making the
good to
and touchingits originalup finish.
to restore Pipes to to70 be
134 e) Electric
installed on Centrifugal
trenches or Water
walls Pump
or floor oforcapacity
duct Set 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 - - 100.00%
original
lpm at 15mconditions
head, wherever
approx. 0.50 instructed
HP motor andas per
complete
135 drawings,
f) 1000 litres
applicable specifications
forcapacity theand
any of Nepatop instructions,
items Rooftopcleaning
orbelow. or No. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 - - 100.00%
136 with
of theelectric
equivalent
2. SEWER, system,brand
RAINtesting
Plastic
AND andcyllindrical
ready
WASTE forWATER
operation.
vertical The
water Rm 38.00 1,400.00 53,200.00 47.50 66,500.00 47.50 66,500.00 - - 125.00%
-Sanitaryware:
cables, starter Hindware,
switch Parryware RAK or
137 rate
storage shall
INSTALLATION include
tank
- 75 mm ED 6 kg/sqcm
equivalent completefor all labour and materials Rm 30.00 1,200.00 36,000.00 - - - - 0.00%
138 required.
with
PVC
-CP
- 50 mm SWR The
Fixtures:
ED 6measurement
inter-connection,
(Soil, Waste,
Hindware,
kg/sqcm overflow,
Rain)shall
Parryware,be done
washout
pipes with for
and
all vents
Jaquar or Rm 2.00 350.00 700.00 - - - - 0.00%
running
60cm
necessary
equivalent Diameters,
CI Manhole
ring fittingsCover
gaskets, etc not
PVC payable
(For
fittings, 90cm seperately.
Dia MS
including
139 --SWR
50 mm No. 1.00 14,000.00 14,000.00 - - - - 0.00%
Manhole)
clamps, hangers,
Pipes: cutting,
NepatopCover jointing,
/ Marvel sealing,
/75x75cm
Mangalam PVC
140 60x60cm CIofManhole (Forincluding No. 3.00 10,000.00 30,000.00 - - - - 0.00%
installation
/Manhole)
Supreme PVC pipes and specials making
141 60x60cm
holes and CI Manhole
cutting grooves Cover (For 65x65cm ST No. 2.00 9,000.00 18,000.00 - - - - 0.00%
-Cold Water Supply Pipeonand walls or floor
fittings: and
Marvel/
142 Cover)
B. SCHOOL
repairing
b) White glazed
the BLOCKS
same earthernware
to its original 580x480mm
finish. Pipes Orissa
to be Set 1.00 34,000.00 34,000.00 - - - - 0.00%
Mangalam/ Hilltake CPVC
143 1. SANITARY
installed
Pan
-Gun (without
on trenches
Metal GateINSTALLATION
flush) complete
or walls
Valve: with
or floor
LEADER/SANT testing
or duct andas ready
per Set 2.00 3,100.00 6,200.00 1.00 3,100.00 1.00 3,100.00 - - 50.00%
144 a)
c) White
drawings,
forWhite
-Ball
d) glazed
operation
glazed
Valve: earthernware
specifications,
earthernware
Marvel/ Mangalam/ Indian
manufacturer's
wall-hung
Squatting Pattern
Hilltake Water
HandUrinal
Plate wash Set 1.00 8,000.00 8,000.00 - - - - 0.00%
145 Closet
basin
-Water
size set
600x350mmwith
recommendations,
of Pump: standard
size 550x400mm
Kirloskar/
with testingbakelite
instructions, with
KSB/
and seat
cleaning
15 Wilo cover,
mm PVC
ready of
for PVC
the Set 2.00 110,000.00 220,000.00 - - - - 0.00%
low leveltesting
system,
connector flushing and cistern
ready withoperation.
for flush pipe Theand cistern
rate
146 1. CP self with
e) WATER
operation
accessories, closing both
SUPPLY
bracket, bibends
CPcock couplings,
INSTALLATION
angular cock,
15mm
PVC
CP No 6.00 4,000.00 24,000.00 4 16,000.00 - 4.00 16,000.00 66.67%
shall
angular
a) include
CPVC cockpipesfor
-1 all 15mm
no,
SDR-11labour andPillar
CP
includingmaterialsCock,
MS required.
32mm
clamps
147 f) CPmeasurement
spreader
connector
The pipe for Urinalbewith
complete
shall done testing
for and
running ready for
meters, Set 2.00 2,500.00 5,000.00 - - - - 0.00%
PVC bottle trap,nails
and brackets, waste and coupling
hooks, with and all testing
necessary
148 g) CP
operation
fittings
and Toilet
readyetcfornotPaper
payable
operationHolder heavy
seperately. No. 1.00 2,600.00 2,600.00 - - - - 0.00%
CPVC/Brass specials required for complete
149 h) 15mm CP
- 110 mm EDcutting,
installation, Commode
6 kg/sqcm Spray with plastic
jointing, sealing of joints head No. 1.00 2,000.00 2,000.00 - - - - 0.00%
150 i) PVC
etc, Multi-floor of trap with cover No. 5.00 600.00 3,000.00 - - - - 0.00%
j) CPinstallation
Waste Coupling pipes andand PVC specials
bottle trap including
for water
151 making holes and cutting grooves on walls or No. 2.00 1,500.00 3,000.00 - - - - 0.00%
trough
152 floor
k) 40 and
mm SS repairing
Grab bar theofsame600mm to its original
Length - Sidefinish. Set 1.00 4,500.00 4,500.00 - - - - 0.00%
153 Pipes
l) 40 mm to beSSinstalled
Grab baron of trenches
600mm Length or walls or floor
- Rear Set 1.00 4,500.00 4,500.00 - - - - 0.00%
154 or duct as per
m) CP Foldable Hinge drawings, specifications and Set 2.00 5,500.00 11,000.00 - - - - 0.00%
instructions, cleaning of the system, testing and
155 Fabrication, Transportation and Installation of Lot. 1 3,000,000.00 3,000,000.00 1 3,000,000.00 1.00 3,000,000.00 - - 100.00%
ready for operation. The rate shall include for all
Furniture in SHREE NAMRUK L. S. SCHOOL 27,661,910.93 24,886,587.66 23,268,870.95 1,617,716.71
labour and materials required. The
(ECD-8)
measurement shall be done for running meters,
Gakhu-1, Gorkha, Nepal. as per drawings,
fittings etc not payable seperately.
specifications and schedule of quantity appended in
- 40 mm
specification division - 19 all complete.
STUDENT DESK_G3-5 (3 SEATER) D-02B - 7
nos., STUDENT DESK_6-12 (3 SEATER) D-02C -
21 nos., ECD STUDENT DESK (6 SEATER) D-03
- 2 nos., STUDENT BENCH_G3-5 (3 SEATER) B-
02B - 7 nos., STUDENT BENCH_G6-12 (3
SEATER) B-02C - 21 nos., TEACHER'S TABLE
T-01 - 6 nos., TEACHER'S CHAIR C-01 - 6 nos.,
SOFT BOARD F-01 - 1 nos., BOOK SHELF F-02 -
3nos., WHITE BOARD F-03 - 5 nos., COMPUTER
TABLE T-04 - 8 nos., COMPUTER CHAIR C-02 -
16 nos., WHITE BOARD WITH STAND F-05 - 1
nos., NOTICE BOARD F-14 - 1 nos., CUSIONS F-
16 - 12 nos., CARPET (SQ.M) - 38.98 Sq.m.
Amount carried out from the calculated amount
from the schedule of quantities attached in
specification.

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Abstract of Cost
Type Design
Pay Quantity Total This Bill
Description of Works Unit Rate (NRs.) Toilet Site Water
Item No. in BOQ 3-6C(XS)-A Quantity
Maintenance Development Tank
A. PRELIMINARY/TEMPORARY WORKS
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00
2 SITE OFFICE ESTABLISHMENT Per month 12.00 25,000.00 12.00
3 PROJECT INFORMATION BOARD Nos. 1.00 10,000.00 1.00
4 SAFETY SIGN BOARD Nos. 1.00 10,000.00 1.00
5 BARRICADING WORKS R.m. 65.00 2,000.00 60.60
DISMANTLING OF COMPLETELY DAMAGED
6 Sq.m 99.85 3,000.00 97.50
BUILDING
7 SAFETY MATERIALS & SITE SAFETY L.S 1.00 100,000.00 1.00
8 CONSTRUCTION OF NEW TLC Sq.m 93.91 3,000.00 64.75
9 LAB TEST (WATER TEST) job 1.00 7,500.00
10 TEMPORARY TOILET Nos. 2.00 150,000.00 2.00
11 ROAD REPAIR & MAINTENANCE K.m 14.00 50,000.00 14.00

B. CIVIL WORKS-BUILDING
1 EARTHWORKS
1.1 SIITE CLEARANCE AND MOBILIZATION sq.m 380.51 100.00 318.45 25.00 343.45
1.2 EARTHWORKS IN EXCAVATION cu.m 228.95 400.00 162.25 162.25
1.3 EARTHBACK FILLING cu.m 107.31 300.00 123.92 123.92
1.4 BOULDER SOLING cu.m 58.52 6,000.00 46.59 46.59
1.5 SAND FILLING cu.m 2.49 6,000.00 2.49 2.49
2 CONCRETE WORKS -
2.1 P.C.C. -
2.1.1 P.C.C. (1:3:6) cu.m 10.02 14,000.00 8.21 8.21
2.1.2 P.C.C. (1:2:4) cu.m 14.29 16,000.00 11.87 11.87
2.2 P.C.C. FOR R.C.C. WORKS cu.m 225.51 20,000.00 210.52 0.53 211.05
2.3 SILICA CEMENT ADMIXTURE Kg 2255.1 300.00 2,105.19 5.30 2,110.49
2.4 STEEL REINFORCEMENT Mt. 36.09 130,000.00 33.11 33.11
2.5 FORM WORKS sq.m 1452.23 800.00 1,288.82 10.26 1,299.08
3 BRICK MASONRY WORKS -
BRICK MASONRY WORKS ( 1 : 4 c/s )ONE SIDE
3.1 cu.m 78.16 20,000.00 -
FAIRFACE
7.2.3 CLEAR SILICON WATER-REPELENT COATING sq.m 550.00 -
8.1.1 POINTING WORK IN BRICK MASONARY sqm 400.00 -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for
-
3-6C(S)-E
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 -

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 -
Exterior Weather Coat Paint sq.m 350.00 -
-
BRICK MASONRY WORKS ( 1 : 4 c/s ) FIRST CLASS
3.2 cu.m 45.91 18,000.00 85.34 0.20 85.54
CHIMNEY MADE
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 54.44 1,500.00 13.07 0.18 13.25
3.4 HONEY COMB BRICK WORKS cu.m 0.24 9,000.00 0.24 0.24 0.48
4 DOORS & WINDOWS WORKS -
4.1 METAL FRAME -
4.1.1 DOOR FRAME R.m 101.10 1,100.00 100.30 100.30
4.1.2 WINDOW FRAME R.m 226.25 1,100.00 231.68 231.68
4.2 METAL SHUTTER -
4.2.1 WINDOW SHUTTER sq.m 51.04 7,500.00 40.41 40.41
4.3 WOODEN SHUTTER -
4.3.1 FLUSH DOOR SHUTTER sq.m 39.17 8,000.00 40.40 40.40
4.5 WINDOW GRILL sq.m 54.65 2,500.00 40.29 40.29
4.6 COLLAPSIBLE GATE sq.m 10.03 10,000.00 10.13 10.13
5 FLOORING WORKS -
5.1 HARDENED CEMENT CONCRETE FLOOR sq.m 654.34 900.00 605.69 2.42 608.11
5.2 NEAT CEMENT SKIRTING r.m 306.86 100.00 296.43 296.43
5.3 TERRAZZO CAST IN SITU DADO sq.m 35.43 1,500.00 2.40 2.40
-
7 PLASTERING/WALL FINISHING WORK -
7.1 CEMENT PLASTER WORK -
7.1.1 ON INNER WALL sq.m 687.61 600.00 514.13 514.13
7.1.2 ON CEILING (1:4) sq.m 320.22 500.00 453.98 453.98
7.1.3 ON OUTER WALL (1:6) -
7.1.3.1 EXTERNAL PLASTER sq.m 284.26 600.00 730.59 730.59
7.2 PAINTING WORKS -
7.2.1 DISTEMPER PAINT sq.m 1003.26 200.00 968.11 163.12 1,131.23
7.2.2 EXTERIOR WEATHER COAT PAINT sq.m 300.38 350.00 730.59 48.00 778.59
7.2.4 ENAMEL PAINT sq.m 262.19 400.00 294.92 294.92
8 MISCELLANEOUS -
8.2 CEMENT BOARD WALL sq.m 15.39 6,500.00 -
8.3 RAILING kg 1478.28 220.00 1,508.41 1,508.41
8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00
8.5 SEWER, RAIN AND WASTE WATER INSTALLATION Rm 44.26 1,500.00 39.10 39.10
-
B CIVIL WORKS : SITE DEVELOPMENT -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 150.60 100.00 141.88 141.88
2 EARTHWORK IN EXCAVATION Cu.m 87.28 400.00 33.74 33.74
3 EARTHBACK FILLING Cu.m 20.94 300.00 4.50 4.50
4 BOULDER SOLING Cu.m 22.42 6,000.00 21.80 21.80
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 0.55 0.55
6 P.C.C (1:2:4) Cu.m 12.11 16,000.00 21.28 21.28
7 P.C.C FOR R.C.C WORK Cu.m 0.99 20,000.00 0.99 0.99
8 STEEL REINFORCEMENT Mt. 0.10 130,000.00 0.10 0.10

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
9 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.90 9.90
10 FORM WORKS Sq.m 9.12 800.00 11.33 11.33
12 BRICKS MASONRY WORKS Cu.m 0.22 18,000.00 0.53 0.53
13 NEAT CEMENT SKIRTING r.m 4.72 100.00 4.80 4.80
14 METAL WORKS FOR FENCE k.g 1548.97 220.00 1,227.30 1,227.30
15 METAL WORKS FOR GATE k.g 130.78 220.00 123.31 123.31
16 PLASTER ON OUTER WALL Sq.m 7.92 600.00 7.80 7.80
17 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 8.28 8.28
18 CHAIN LINK FENCE Sq.m 151.83 1,000.00 168.00 168.00
19 FLAG POLE nos. 2 25,000.00 2.00 2.00
20 METAL RAILING Kg 63.98 220.00 198.94 198.94
-
CIVIL WORKS - RESERVOIR WATER TANK -
1 EARTH WORKS -
1.1 SITE CLEARANCE & MOBILIZATION sq.m 22.31 100.00 22.31 22.31
1.2 EARTHWORK IN EXCAVATION cu.m 24.58 400.00 24.57 24.57
1.3 EARTH BACK FILLING cu.m 4.02 300.00 4.01 4.01
1.4 BOULDER SOLING cu.m 2.08 6,000.00 2.08 2.08
2 CONCRETE WORKS -
2.1 P.C.C -
2.1.1 P.C.C (1:3:6) cu.m 0.78 14,000.00 0.78 0.78
2.2 P.C.C. FOR R.C.C. WORKS cu.m 7.42 20,000.00 7.41 7.41
2.3 SILICA CEMENT ADMIXTURE Kg 74.20 300.00 74.15 74.15
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.58 1.58
2.5 FORM WORKS sq.m 54.93 800.00 56.46 56.46
3 PLASTERING/ WALL FINISHING WORKS -
3.1 CEMENT PLASTER WORKS -
3.1.1 Internal Plaster on Wall (1:4) with Cement Punning sq.m 33.66 700.00 35.46 35.46
4 WATER PROOF COATING sq.m 33.66 550.00 35.46 35.46
-
ELECTRICAL WORKS -
A Common Installation -
1.1 Stand Alone 40 A DP MCB with Enclosure No 1 12,000.00 1.00 1.00
2 CABLES & WIRES -
2.1 2 Nos 10 Sq mm Multistranded Cu Wire + 1 No 6 Sq mm Rm 800.00 60.00
Multistranded Cu wire 60 60.00
2.2 2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm Rm 50 250.00 -
Multistranded Cu wire
B SCHOOL BLOCKS -
1 DISTRIBUTION BOARDS -
1.1 Ground Floor DB (DB-1) No 1 30,000.00 1 1.00
1.2 First Floor DB ( DB-2) No 1 22,000.00 1 1.00
1.3 Second Floor DB ( DB-3) No 1 32,000.00 1 1.00
1.4 6A DP MCB with Enclosure No 1 8,500.00 -
2 CABLES & WIRES -
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm 10.00
Multistranded Cu wire Rm 10 600.00 10.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
2.2 2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm 15.00
Multistranded Cu wire Rm 15 500.00 15.00
2.3 2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm Rm 30 30.00
Multistranded Cu wire 250.00 30.00
3 General service light point wiring -
3.1 One way light point Pts 46 700.00 39.00 39.00
3.2 Two Way Light Point Pts 1 900.00 3.00 3.00
3.3 Ceiling and Exhaust Fan Point Wiring Pts 14 900.00 4.00 4.00
4 6A Universal pin Light power point wiring Pts 28 700.00 28.00 28.00
5 Switch Socket Outlets -
5.1 6A Universal power Switch Socket No 28 900.00 28.00 28.00
6 Sweep Ceiling/Exhaust Fan/Wall Fan -
6.1 225 mm dia M/D exhaust fan No 2 6,000.00 24.00 24.00
7 Light Fixtures/Luminaires & Accessories -
7.1 18 W LED Surface Mounted Square type CRCA Powder
Coated with PMMA Diffuser having 6000 K Color 2,700.00 24.00
Temperature, IP20 rated. Nos. 24 24.00
7.2 12 W LED Surface Mounted Cylindrical type CRCA Powder
Coated with PMMA Diffuser having 6000 K Color 13.00
Temperature, IP20 rated. Nos. 13 2,400.00 13.00
7.3 LED Wall Light made of high grade die-cast aluminium
Powder Coated with PMMA Diffuser having 6000 K Color 1.00
Temperature, IP65 rated with 7 W LED Lamp. Nos. 2 1,800.00 1.00
7.4 9 W LED Surface Mounted Cylindrical type CRCA Powder
Coated with PMMA Diffuser having 6000 K Color -
Temperature, IP20 rated. Nos. 1 2,000.00
7.5 6 W LED Recessed Circular type CRCA Powder Coated with
PMMA Diffuser having 6000 K Color Temperature, IP20 Nos. -
rated. 3 1,800.00
7.6 7 W LED T5 Slim Mirror Light Nos 1 2,000.00 -
8 Pull Box No 3.00 700.00 3.00 3.00
9 External post top light pole No 3.00 7,500.00 3.00 3.00
10 Post Top External Light Fixtures No 3.00 9,800.00 3.00 3.00
11 Earthing and Lightning protection -
11.1 Chemical Earhting Nos. 3.00 45,000.00 3.00 3.00
11.2 Earthing Bar Nos. 3.00 2,200.00 3.00 3.00
12 GI Strip/Cu wire Earthing -
12.1 25 x 3 mm GI Strip Mtr. 65.00 300.00 65.00 65.00
12.2 12 SWG Cu wire Mtr. 15.00 200.00 20.50 20.50
13 Earth Test link No 1.00 1,500.00 1.00 1.00
14 Lightning Arrester No. 1.00 7,500.00 1.00 1.00
C SOLAR PV SYSTEM -
1 Solar PV Panel -
1.1 24V 250W PV Module No 8.00 26,000.00 8.00 8.00
2 Tubular Deep cycle Battery No 4.00 30,000.00 4.00 4.00
3 Hybrid Inverter No 1.00 100,000.00 1.00 1.00
D FIRE EXTINGUISHER Nos. 1.00 8,000.00 1.00 1.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
-
4 SANITARY WORKS -
A PIPING WORKS -
- 40 mm Rm 46.00 1,600.00 60.00 60.00
- 25 mm Rm 10.00 1,000.00 8.00 8.00
- 20 mm Rm 11.00 700.00 3.00 3.00
- 15 mm Rm 2.00 500.00 2.00 2.00
b) - 50 mm Rm -
- 40 mm Rm -
c) CPVC Ball Valve -
-- 40
40 mm
mm No. 2.00 2,000.00 3.00 3.00
- 25 mm No. 2.00 900.00 1.00 1.00
e) Electric Centrifugal Water Pump of capacity 70 lpm Set 1.00 12,500.00 1.00 1.00
cables,
f) 1000 starter switch Nepatop or Rooftop or equivalent brand
litres capacity No. 1.00 34,000.00 1.00 1.00
Plastic cyllindrical vertical water storage tank -
with inter-connection, overflow, washout and vents
2. SEWER, RAIN AND WASTE WATER -
INSTALLATION Rm 38.00 1,400.00 47.50 47.50
- 110 mm ED 6 kg/sqcm
PVC SWR (Soil, Waste, Rain) pipes with all necessary
B.
ringSCHOOL
gaskets, BLOCKS
PVC fittings, including MS clamps, hangers, -
1.
b) SANITARY
cutting, glazedINSTALLATION
Whitejointing, sealing, installation
earthernware 580x480mm of pipes and
Orissa Panspecials Set 2.00 3,100.00 1 1.00
a) White flush)
including
(without glazed
making earthernware
holes
complete and Indian
with testingPattern
cutting grooves
and Water
ready on Closet
forwalls orset
operation
e) CP
with self closing bib cock nos 4 4,000.00 4 4.00
floorstandard bakelitethe
and repairing seat cover,
same PVC
to its low level
original flushing
finish. Pipes to
i) PVC with
cistern Multi-floorpipe trapand
with cover -
be installed flush
on trenches orcistern
walls accessories, bracket,
or floor or duct CP
as per
angular
drawings, cock, PVC connector
specifications, pipe complete with testing and
manufacturer's -
ready for operation
Fabrication,
recommendations, Transportation
instructions,andcleaning
Installation ofsystem,
of the Furniture Lot. 1 3,000,000.00 1 1.00
Gakhu-1,
testing andGorkha,
ready for Nepal. as
operation.per The
Total drawings, specifications
rate shall include for
and schedule
all labour andofmaterials
quantityrequired.
appendedThe in specification
measurement shall
division
be done for - 19running
all complete.
meters, fittings etc not payable
STUDENT
seperately. DESK_G3-5 (3 SEATER) D-02B - 7 nos.,
STUDENT
- 110 mm ED DESK_6-12
6 kg/sqcm (3 SEATER) D-02C - 21 nos.,
ECD STUDENT DESK (6 SEATER) D-03 - 2 nos.,
STUDENT BENCH_G3-5 (3 SEATER) B-02B - 7 nos.,
STUDENT BENCH_G6-12 (3 SEATER) B-02C - 21 nos.,
TEACHER'S TABLE T-01 - 6 nos., TEACHER'S CHAIR
C-01 - 6 nos., SOFT BOARD F-01 - 1 nos., BOOK SHELF
F-02 -
3nos., WHITE BOARD F-03 - 5 nos., COMPUTER
TABLE T-04 - 8 nos., COMPUTER CHAIR C-02 - 16
nos., WHITE BOARD WITH STAND F-05 - 1 nos.,
NOTICE BOARD F-14 - 1 nos., CUSIONS F-16 - 12 nos.,
CARPET (SQ.M) - 38.98 Sq.m.
Amount carried out from the calculated amount from the
schedule of quantities attached in specification.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Abstract of Cost
Amount (NRs) Remarks

500,000.00
300,000.00
10,000.00
10,000.00
121,200.00
292,500.00
100,000.00
194,250.00
-
300,000.00
700,000.00
-
-
-
34,345.25
64,899.56
37,175.73
279,521.10
14,940.00
-
-
114,877.00
189,877.00
4,220,982.88
633,147.43
4,304,315.42
1,039,261.62
-
-
-
-
-
-
-

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
-
-
-
1,539,807.91
19,874.10
4,279.50
-
-
110,330.00
254,842.50
-
303,040.13
-
323,203.60
100,717.13
101,250.00
-
547,297.20
29,643.00
3,600.00
-
-
-
308,478.92
226,990.50
-
438,352.50
-
226,246.51
272,505.63
117,966.00
-
-
331,851.04
80,000.00
58,650.00
-
-
14,187.50
13,496.70
1,350.00
130,807.50
7,720.13
340,500.00
19,800.00
12,902.51

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
2,970.00
9,064.00
9,540.00
480.00
270,006.00
27,128.09
4,680.00
2,898.00
168,000.00
50,000.00
43,767.24
-
-
-
2,231.00
9,828.72
1,202.85
12,462.00
-
-
10,904.25
148,295.00
22,244.25
204,902.61
45,170.80
-
-
24,824.45
19,504.93
-
-
-
12,000.00
-
48,000.00

-
-
-
30,000.00
22,000.00
32,000.00
-
-
6,000.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
7,500.00

7,500.00
-
27,300.00
2,700.00
3,600.00
19,600.00
-
25,200.00
-
144,000.00
-

64,800.00

31,200.00

1,800.00

-
2,100.00
22,500.00
29,400.00
-
135,000.00
6,600.00
-
19,500.00
4,100.00
1,500.00
7,500.00
-
-
208,000.00
120,000.00
100,000.00
8,000.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
-
-
-
96,000.00
8,000.00
2,100.00
1,000.00
-
-
-
6,000.00
900.00
12,500.00
34,000.00
-
-
66,500.00
-
3,100.00
16,000.00
-
-
3,000,000.00
24,886,587.66

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Breadth
S.No Description No. Length (m) Height (m) Qty. Unit
(m)
1 Site Office Establishment 1 12 Per month

2 Project Information Board 1 1 No.

3 Safety Sign Board 1 1 No.

4 Barricading Works 1 60.6 Rm

Dismantling of completely
5
damaged building
Building 1 1 97.50 sq.m

Safety materials and site


6 1 1 L.S
safety

7 Relocating of existing TLC 5 3.7 3.5 64.75 sq.m

8 Construction of new TLC


Building 1 ( 5 Class room) 1 sq.m
Construction of Temporary
10
Toilet 2 2 Nos.

Road Repair and


11 14 14 km
maintenance
Remarks
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization 1 21.95 13.95 306.20
Soak Pit 1 3.50 3.50 12.25
Total 318.45 Sq.m

1.2 Earthwork in excavation


For Footing
For Isolated Foundation
F1 2 2.00 2.00 1.50 12.00
For Combined Foundation
CF1 2 2.50 7.50 1.50 56.25
CF2 1 6.80 2.10 1.50 21.42
CF3 2 2.10 7.50 1.50 47.25

Excavation for lower tie beam


For Lower Tie Beam
Along Grid A, D 2 0.25 0.60 0.70 0.21
Along Grid B, C 2 0.20 0.60 0.70 0.17
Along Grid 1, 2 2 9.40 0.60 0.70 7.90
Along Grid 3 1 7.70 0.60 0.70 3.23
Drain 1 16.95 0.60 0.05 0.51
1 16.95 1.13 0.15 2.87
External Steps 1 16.00 0.83 0.15 1.98

Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Soak Pit 1 4.15 Area 1.55 6.44
Total 162.25 Cu.m

1.3 Earth Back filling


Excavated earthwork 162.25
1 Boulder soling -16.40
2 PCC -7.32
3 RCC -28.76
Brick masonry work below plinth tie
-6.28
4 beam
5 Class room 2 5.70 5.70 0.18 11.37
6 Staircase 1 3.20 5.70 0.18 3.19
7 Corridoor 1 14.60 2.20 0.18 5.62
8 Below Ramp 1 1.40 1.30 0.14 0.25
Total 123.92 Cu.m
1.4 Boulder Soling
For Footing
Isolated F1 2 1.70 1.70 0.20 1.16
Combined CF1 2 7.20 2.20 0.20 6.34
Combined CF2 1 6.50 1.80 0.20 2.34
Combined CF3 2 7.20 1.80 0.20 5.18

For Lower Tie Beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Along Grid A, D 2 0.55 0.45 0.10 0.05
Along Grid B, C 2 0.50 0.45 0.10 0.05
Along Grid 1, 2 2 10.30 0.45 0.10 0.93
Along Grid 3 1 8.30 0.45 0.10 0.37

Building Floors
Classroom
Class Room 2 5.70 4.70 0.20 13.23
Corridor 2 5.70 2.20 0.20 5.18
1 4.20 2.20 0.20 1.46
Below Staircase 1 4.20 4.70 0.20 3.74

Pavement along Drain 1 16.95 0.98 0.10 1.66


External Steps 1 16.50 0.68 0.10 1.11
Side Pavement 2 5.98 1.00 0.10 1.20
Pebbels along Drain 1 16.95 0.60 0.05 0.51

Below ramp
For Slope 1 1.30 1.36 Area 1.77
For Front wall 3-AB 1 0.50 0.45 0.10 0.02
For Side wall -3B 1 6.80 0.45 0.10 0.31
Total 46.59 Cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 1.88 Area 1.32 2.49
Total 2.49 Cu.m

2 Concrete Works
2.1 P.C.C.
2.1.1 PCC work (1:3:6)
For Footing
Isolated F1 2 1.70 1.70 0.10 0.58
Combined CF1 2 7.20 2.20 0.10 3.17
Combined CF2 1 6.50 1.80 0.10 1.17
Combined CF3 2 7.20 1.80 0.10 2.59

For Lower Tie Beam


Along Grid A, D 2 0.55 0.45 0.05 0.02
Along Grid B, C 2 0.50 0.45 0.05 0.02
Along Grid 1, 2 2 10.30 0.45 0.05 0.46
Along Grid 3 1 8.30 0.45 0.05 0.19
Total 8.21 Cu.m

2.1.2 P.C.C.(1:2:4) Works


Entire Building Floors 1 15.60 6.90 0.08 8.07
Below staircase 1 1.50 0.06 0.08 0.01
Ramp
Below Ramp 1 6.80 1.30 0.08 0.66
Ramp Side Support 1 6.80 0.45 0.05 0.15
1 6.80 0.13 0.05 0.04
Ramp Front Side Support 1 1.33 0.45 0.05 0.03
1 1.33 0.25 0.05 0.02
Side Pavement 2 5.98 1.00 0.05 0.60
Front Steps/Drain 1 10.03 1.50 0.05 0.75
Back Drain 1 15.95 0.98 0.05 0.78
Side Steps 1 2.43 0.60 0.05 0.07
1 2.50 0.60 0.05 0.08
Above exterior steps 1 0.90 0.05 0.61
Total 11.87 Cu.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
2.2 PCC for RCC Work 1:1.5:3
For Footing
Footing F1
Square portion 2.00 1.70 1.70 0.20 1.16
Trapezoid portion 2.00 1.81 Area 0.45 1.63
Combined CF1 2 7.20 2.20 0.65 20.59
Combined CF2 1 6.50 1.80 0.65 7.61
Combined CF3 2 7.20 1.80 0.65 16.85

Lower Tie Beam


Grid 1,2,3 3 15.15 0.30 0.30 4.09
Grid A,B,C,D 4 6.35 0.30 0.30 2.29
Column
From lower to plinth tie beam 12 0.45 0.58 1.20 3.73
Plinth tie beam
Grid 1,2,3 3 15.15 0.30 0.30 4.09
Grid A,B,C,D 4 6.35 0.30 0.30 2.29
Ground Floor
For column 12 0.45 0.58 3.00 9.32
G.F Staircase
Landing beam 1 4.05 0.25 0.43 0.43
Landing 1 4.20 2.00 0.21 1.72
First flight
Intial Staircase gap 1 2.00 0.90 0.30 0.54
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Second Flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42

First floor beam


Primary Beam
Grid 1-2-3 3 15.15 0.30 0.50 6.82
Grid A-B-C-D 4 6.35 0.30 0.50 3.81
Secondary Beam
Grid A1-C1 2 7.20 0.25 0.43 1.53
Edge Beam 1 7.95 0.13 0.50 0.52
F.F. Slab
Class room 4 2.73 4.70 0.13 6.40
Corridoor 4 2.73 2.20 0.13 3.00
1 4.20 2.20 0.13 1.16
Cantilever slab 1A-B & 1C-D 2 5.55 0.60 0.13 0.87
Canopy slab 3B-C 1 5.89 0.90 0.13 0.69
Lintel Bands, Ground floor level
Along grid A,B,C,D 4 4.43 0.23 0.13 0.64
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, Ground floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 15.15 0.23 0.08 0.19
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.50 0.25 0.08 0.19

First Floor
For column 12 0.575 0.45 3.00 7.29
F.F Staircase
Landing beam 1 4.05 0.25 0.43 0.43
Landing Slab 2 1 4.20 2.00 0.21 1.72

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
First flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Second Flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Landing Projection Slab 1 4.05 0.60 0.13 0.32
Second Floor Beam
Primary Beam
Grid 1-2-3 3 15.15 0.30 0.50 6.82
Grid A-B-C-D 4 6.35 0.30 0.50 3.81
Secondary Beam
Grid A1-C1 2 7.20 0.25 0.43 1.53
S.F. Slab
Class room 4 2.73 4.70 0.13 6.40
Corridoor 4 2.73 2.20 0.13 3.00
1 4.20 2.20 0.13 1.16
Cantilever slab 1A-B & 1C-D 2 5.55 0.60 0.13 0.87

Lintel Bands, First floor level


Along grid A,B,C,D 4 4.43 0.23 0.13 0.51
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Sill Bands, First floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 15.15 0.23 0.08 0.26
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.50 0.25 0.08 0.19

Second Floor
For column 12 0.575 0.45 3.00 7.29
S.F Staircase
Landing beam 1 4.05 0.25 0.43 0.43
Landing Slab 3 1 4.20 2.00 0.21 1.72
First flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Second Flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Landing Projection Slab 1 4.05 0.60 0.13 0.32
Top Floor Beam
Primary Beam
Grid 1-2-3 3 15.15 0.30 0.50 6.82
Grid A-B-C-D 4 6.35 0.30 0.50 3.81
Secondary Beam
Grid A1-C1 2 7.20 0.25 0.43 1.53
T.F. Slab
Class room 4 2.73 4.70 0.13 6.40
Corridoor 4 2.73 2.20 0.13 3.00
1 4.20 2.20 0.13 1.16
Cantilever slab 1A-B & 1C-D 2 6.45 1.00 0.13 1.68
Grid A & D 2 9.80 1.00 0.13 2.55
Grid 3 1 16.65 1.00 0.13 2.16
Grid3B-C 1 6.50 0.50 0.13 0.42
Lintel Bands, Second floor level
Along grid A,B,C,D 4 4.43 0.23 0.13 0.51
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Sill Bands, Second floor level
Along grid A,B,C,D 4 5.55 0.23 0.08 0.38
Along grid 1 1 15.15 0.23 0.08 0.26
Along grid 2 1 11.10 0.23 0.08 0.19
Vetical Band 4.00 2.50 0.25 0.08 0.19

Top Floor
For column 6 0.575 0.45 2.60 4.04
Roof Beam
Primary Beam
Along grid 1,2,3 3 4.05 0.30 0.50 1.82
Along grid B & C 2 6.35 0.30 0.50 1.91
Roof Floor Slab 1 9.30 6.30 0.13 7.62
Lintel Bands, Top floor level
Along grid B,C 2.00 6.35 0.23 0.13 0.38
Along grid 1,3 2.00 4.05 0.23 0.13 0.24
Parapet Wall
Sill band 1.00 51.75 0.33 0.10 1.71
Vertical band 35 0.23 0.13 0.8 0.84

Roof Floor
Parapet Wall
Sill band 1.00 29.20 0.33 0.10 0.96
Vertical band 20 0.23 0.13 0.9 0.54

Deduction of Doors For Sill


Ground floor level
D1 -4 1.10 0.230 0.08 -0.08
First floor level
D1 -4 1.10 0.230 0.08 -0.08
Second floor level
D1 -4 1.10 0.230 0.08 -0.08

Bench Slab 2 2.50 0.60 0.08 0.23


Soak Pit
RCC slab 1 2.27 Area 0.13 0.28
Total 210.52 Cu.m
2.3 Silica Admixture
10 Kg per cu.m. of R.C.C. M20 10 210.52 2,105.19 Kgs
Total
2.5 Form Works
For Footing
Isolated footing F1 4 6.00 0.20 4.80
Combined footing
CF1 2 18.80 0.65 24.44
CF2 1 16.60 0.65 10.79
CF3 2 18.00 0.65 23.40
Lower tie beam
Grid 1,2,3 3 15.15 0.60 27.27
Grid A,B,C,D 4 6.35 0.60 15.24
For Column 0.00
From lower to plinth tie beam 12 2.05 1.20 29.52
Deduction1 at beam and column junction -34 0.25 0.30
at LTB -2.55
Deduction1 at beam and column junction
-34 0.30 0.30
at UTB -3.06
For Plinth Tie Beam 0.00
Grid 1,2 & 3 3 15.15 1.05 47.72
Grid A,B,C &D 4 6.35 1.05 26.67

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Landing Beam 1 4.05 0.90 3.62
Ground floor
For column 12 2.05 3.00 73.80
Deduction for Beam opening part -34 0.30 0.50 -5.10
Staircase GF to FF
First flight
Waist slab 1 3.00 2.00 6.00
Landing 1 1 4.20 2.00 8.40
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38
2 2.00 0.15 0.60
Second flight
Waist slab 1 3.00 2.00 6.00
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38
First floor beam
Main beam
Grid 1 (A-B & C-D) 2 5.55 1.17 12.99
Grid 1 (B-C) 1 4.05 1.30 5.27
Grid 2 1 15.15 1.04 15.76
Grid 3(A-B & C-D) 1 5.55 1.17 6.49
Grid 3(B-C) 1 4.05 1.04 4.21
Grid A & D 2 6.35 1.17 14.86
Grid B & C (1-2) 2 6.35 1.17 14.86

Secondary beam
Grid A1-C1 2 7.20 0.85 12.24

FF Slab
Class room 4 4.70 2.73 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24

First Floor 0.00


For column 12 2.05 3.00 73.80
-34 0.30 0.50
Deduction on beam and column junction -5.10
Staircase FF to SF 0.00
First flight 0.00
Waist slab 1 3.00 2.00 6.00
Landing 2 1 4.20 2.00 8.40
Landing Projection Slab 1 4.31 0.73 3.15
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38
2 2.00 0.15 0.60
Second flight 0.00
Waist slab 1 3.00 2.00 6.00
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38
Second Floor Beam 0.00
Main beam 0.00
Grid 1 (A-B & C-D) 2 5.55 1.17 12.99
Grid 1 (B-C) 1 4.05 1.30 5.27
Grid 2 1 15.15 1.04 15.76
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 6.35 1.17 14.86

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid B & C 2 6.35 1.17 14.86

Secondary beam 0.00


Grid A1-C1 2 7.20 0.85 12.24

SF Slab 0.00
Class room 4 4.70 2.73 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
0.00

Second Floor 0.00


For column 12 2.05 3.00 73.80
-34 0.30 0.50
Deduction on beam and column junction -5.10
Staircase SF to TF 0.00
First flight 0.00
Waist slab 1 3.00 2.00 6.00
Landing 3 1 4.20 2.00 8.40
Landing Projection Slab 1 4.31 0.73 3.15
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38
2 2.00 0.15 0.60
Second flight 0.00
Waist slab 1 3.00 2.00 6.00
Riser 10 2.00 0.15 3.00
Side 2 3.35 0.36 2.38

Top Floor Beam 0.00


Main beam 0.00
Grid 1 (A-B & C-D) 2 5.55 1.04 11.54
Grid 1 (B-C) 1 4.05 1.30 5.27
Grid 2 1 15.15 1.04 15.76
Grid 3 1 15.15 1.04 15.76
Grid A & D 2 6.35 1.04 13.21
Grid B & C 2 6.35 1.17 14.86

Secondary beam 0.00


Grid A1-C1 2 7.20 0.85 12.24

TF Slab
Class room 4 2.73 4.70 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Cantilever slab 1A-B & 1C-D 2 6.71 1.13 15.16
Grid A & D 2 9.93 1.13 22.44
Grid 3 1 16.65 1.13 18.81
Grid3B-C 1 6.76 0.63 4.26

Top Floor
For column 6 2.05 2.60 31.98
-14 0.30 0.50
Deduction on beam and column junction -2.10
Roof Beam
Primary Beam
Along grid 1,2,3 3 4.05 1.04 12.64
Along grid B & C 2 6.35 1.04 13.21

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Roof Floor Slab
Grid 1-2 1 4.20 4.70 19.74
Grid 2-3 (corridoor) 1 4.20 2.20 9.24
Projected slab grid 1 & 3 2 4.95 0.81 7.97
Projected slab grid B & C 2 9.56 0.81 15.39

Lintel Bands 0.00


Ground floor level 0.00
Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 11.10 0.15 1.67
Along grid 2 1.00 11.10 0.15 1.67
First floor level 0.00
Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 11.10 0.15 1.67
Along grid 2 1.00 11.10 0.15 1.67
Second floor level 0.00
Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 11.10 0.15 1.67
Along grid 2 1.00 11.10 0.15 1.67
Sill Bands 0.00
Ground floor level 0.00
Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 15.15 0.15 2.27
Along grid 2 1.00 11.10 0.15 1.67

First floor level 0.00


Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 11.10 0.15 1.67
Along grid 2 1.00 11.10 0.15 1.67
In Computer lab - Partition wall 1.00 3.38 0.15 0.51
Second floor level 0.00
Along grid A,B,C,D 4.00 4.43 0.15 2.66
Along grid 1 1.00 11.10 0.15 1.67
Along grid 2 1.00 11.10 0.15 1.67
Vetical Band 0.00
Ground Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.48 0.38 3.76
First Floor 4.00 2.60 0.38 3.95
Top floor level
Along grid B,C 2.00 6.35 0.23 2.92
Along grid 1,3 2.00 4.05 0.23 1.86
Parapet Wall
Sill band 1.00 51.75 0.30 15.53
Vertical band 35 0.23 0.25 2.01
Roof floor level
Parapet Wall
Sill band 1.00 29.20 0.30 8.76
Vertical band 20 0.23 0.25 1.15

Deduction of Doors For Sill 0.00


Ground floor level 0.00
D1 -8 1.10 0.08 -0.66
First floor level 0.00
D1 -8 1.10 0.08 -0.66
Second floor level 0.00
D1 -8 1.10 0.08 -0.66

Bench 0.00
Bench Top Slab 2 5.80 0.125 1.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Bottom 2 1.99 0.50 1.99
Total 1,288.82 Sq.m

3 Brick work
3.2 Foundation upto plinth
Grid 1,2,3 3 15.15 0.23 0.40 4.18
Grid A,B,C,D,E 4 7.60 0.23 0.40 2.80

Ground floor
Along grid A,B,C,D/(1-2) 4 4.43 0.23 2.35 9.57
Along grid 1A-B &C-D 2 5.55 0.23 2.35 6.00
Grid 1 B-C 1 4.05 0.23 2 1.86
Along grid 2 1 11.10 0.23 2.35 6.00

Deduction for doors and windows


Ground floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.55 -1.11
W3 -1 1.50 0.23 0.33 -0.11
D1 -4 1.10 0.23 2.50 -2.53

First floor level


Along grid A,B,C,D/(1-2) 4 4.43 0.23 2.35 9.57
Along grid 1A-B &C-D 2 5.55 0.23 2.35 6.00
Grid 1 B-C 1 4.05 0.23 2.08 1.93
Along grid 2 1 11.10 0.23 2.08 5.30
Partition wall in lab 1 3.6 0.23 1.2 0.99
Deduction for doors and windows
First floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.55 -1.06
W2 -1 1.50 0.23 1.08 -0.35
D1 -4 1.10 0.23 2.50 -2.35

Second floor level


Along grid A,B,C,D/(1-2) 4 4.43 0.23 2.35 9.57
Along grid 1A-B &C-D 2 5.55 0.23 2.35 6.00
Grid 1 B-C 1 4.05 0.23 2.08 1.93
Along grid 2 1 11.10 0.23 2.08 5.30

Deduction for doors and windows


Second floor plan
W1 -8 1.10 0.23 1.13 -2.28
V1 -8 1.10 0.23 0.55 -1.11
W2 -1 1.50 0.23 1.08 -0.37
D1 -4 1.10 0.23 2.50 -2.53

Top floor level


Grid 1 & 3 2 4.05 0.23 2.10 3.91
Grid B & C 2 6.35 0.23 2.10 6.13
Parapet wall
Grid A & D 2 9.30 0.23 0.80 3.42
Grid 1 1 7.55 0.23 0.80 1.39
Grid 3A-B & 3C-D 2 5.50 0.23 0.80 2.02
Grid 3B-C 1 7.30 0.23 1.40 2.35
Deduction for doors and windows
Top floor plan
W2 -1 1.50 0.23 1.08 -0.37
D2 -2 1.10 0.23 1.90 -0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Roof floor
Parapet wall
Grid B & C 2 5.80 0.23 0.90 2.40
Grid 1 & 3 2 8.8 0.23 0.90 3.64
0.00
Below ramp 0.00
For Front wall 3-AB 1 6.50 0.35 0.30 0.68
For Side wall -3B 1 1.33 0.35 0.30 0.14
Above ramp 0.00
For Front wall 3-AB 1 1.40 0.23 0.38 0.12
1 4.25 0.23 0.19 0.18
For Side wall -3B 1 1.33 0.23 0.59 0.18

External Steps 1 13.50 0.48 0.10 0.64


1 13.50 0.18 0.15 0.35
1 13.50 0.08 0.10 0.10
Grid 2A 1 0.60 0.50 0.45 0.14
Grid 3A 1 0.53 0.40 0.45 0.09
Grid 2D 1 0.60 0.50 0.45 0.14
Total 85.34 Cu.m
3.3 Half brick work (1:4 c/s)
Storeroom below staircase 1 3.00 1.35 4.05
1 0.20 1.35 0.27
1 0.90 1.50 1.35
1 1.50 1.65 2.48
Deductions D3 -1 1.00 1.55 -1.55
Ramp
Grid 3AB
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
4 2.15 0.53 4.52
4 0.25 0.53 0.53
Total 13.07 Sq.m

3.4 Honey Comb Brick Works


Soak Pit Brick work 1 0.20 1.20 0.24
Total 0.24 Sq.m

4 Doors and Windows Works


4.1 Metal Frame
4.1.1 Door Frame
D1 12 7.20 86.40
D2 2 4.90 9.80
D3 1 4.10 4.10
Total 100.30 R.m

4.1.2 Window Frame


W1 24 5.58 133.80
W2 3 6.23 18.68
V1 24 3.30 79.20
Total 231.68 R.m

4.2 Metal Shutter


4.2.1 Window Shutter
W1 24 1.01 1.04 25.09
W2 3 1.41 0.99 4.17
V1 24 1.01 0.46 11.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Total 40.41 Sq.m

4.3.1 Flush Door Shutter


D1 12 1.01 2.41 29.21
D2 2 1.01 1.81 10.32
D3 1 1.46 0.91 0.87
Total 40.40 Sq.m

4.5 Window Grill


W1 24 1.01 1.04 25.09
W2 3 1.41 0.99 4.17
W3 1 1.50 0.33 0.49
V1 24 1.01 0.44 10.54
Total 40.29 Sq.m

4.6 Collapsible Gate


1 4.05 2.5 10.13
Total 10.13 sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 4.75 54.86
Corridor 1 16.80 2.53 42.42
1 0.42 4.20 1.76
Below Staircase 1 4.52 4.20 18.98
Ramp 1 6.52 1.30 8.48
Exterior Steps 1 14.40 1.05 15.12
3 0.60 0.50 0.90
Staircase Tread 18 0.3 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.10 2.00 4.20
1 2.10 2.00 4.20
Pavement along Drain 1 16.95 1.01 17.12

First floor plan


Class Room 2 5.78 4.75 54.86
Corridor 1 16.80 2.53 42.42
1 0.31 4.20 1.28
Staircase Tread 18 0.3 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.10 2.00 4.20
Second floor plan
Class Room 2 5.78 4.75 54.86
Corridor 1 16.80 2.53 42.42
1 0.31 4.20 1.28
Staircase Tread 18 0.3 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.00 2.20 4.40
1 2.10 2.00 4.20
Top floor plan
Corridor 1 4.2 2.375 9.98
Top Floor Slab 1 118.95 Area 118.95

Roof plan
Roof Floor Slab 1 5.3 8.3 43.99
Total 605.69 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
5.2 Neat Cement Skirting works
Ground floor plan
Class Room 2 21.05 42.10
Corridor 1 11.1 11.10
Store Below Landing 1 17 17.00
1 4.03 4.03
Staircase/Landing 1 14.245 14.25
Column 4 2.05 8.20
6 1.30 7.80
2 0.78 1.55
Deduction
D1 -8 1.10 -8.80
D3 -2 1.00 -2.00

First floor plan


Class Room 2 21.05 42.10
Corridor 1 14.74 14.74
Staircase/Landing 1 14.245 14.25
Column 2 2.05 4.10
2 0.815 1.63
Along Partition wall -Computer lab 2 3.375 6.75
Deduction
D1 -8 1.10 -8.80
W2 -1 1.50 -1.50

Second floor plan


Class Room 2 21.05 42.10
Corridor 1 14.74 14.74
Staircase/Landing 1 14.245 14.25
Column 2 1.33 2.65
2 0.815 1.63
Deduction
D1 -8 1.10 -8.80
W2 -1 1.50 -1.50

Top floor Plan


Corridor 1 9.70 9.70
Top Floor Outer wall 1 23.08 23.08
1 7.30 7.30
Deduction
D2 -4 1.10 -4.40

Roof Plan
Along Wall 1 27.20 27.20
Total 296.43 r.m

5.3 25mm Terrazo Finishing


For In-built Furniture
Bench 2 2.40 0.50 2.40
Total 2.40 sq.m

7 PLASTER/PAINTING WORKS
7.1 Cement Plaster Works
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 21.07 2.91 122.63
Staircase 1.00 13.46 2.91 39.17
Store Below Landing 2.00 1.57 Area 3.13

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
2.00 0.45 1.30 1.17
1.00 1.42 Area 1.42
2.00 1.96 1.59 6.23
Column
Grid 2A,2D 2.00 0.61 2.77 3.39
Grid 2B,2C 2.00 1.27 2.77 7.01

Deductions
W1 -8.00 1.10 1.75 -7.70
W3 -1.00 1.50 0.33 -0.24
D1 -4.00 1.10 2.50 -5.50
D3 -2.00 1.00 1.55 -1.55

First Floor
Classroom 2.00 21.05 2.87 120.83
Staircase 1.00 13.38 2.87 38.39
In partition wall- Computer lab 2.00 3.38 1.20 8.10
Column
Grid 2A,2D 2.00 0.61 2.77 3.39
Grid 2B,2C 2.00 1.27 2.77 7.01

Deductions
W1 -8.00 1.10 1.75 -7.70
W2 -1.00 1.50 1.08 -0.81
D1 -4.00 1.10 2.50 -5.50

Second Floor
Classroom 2.00 21.05 2.87 120.83
Staircase 1.00 13.38 2.87 38.39
Column
Grid 2A,2D 2.00 0.61 2.77 3.39
Grid 2B,2C 2.00 1.27 2.77 7.01

Deductions
W1 -8.00 1.10 1.75 -7.70
W2 -1.00 1.50 1.08 -0.81
D1 -4.00 1.10 2.50 -5.50

Top Floor
Along Grid 1&3/ B-C 2.00 4.05 2.45 9.92
Along Grid B&C/ 1-3 2.00 7.70 2.45 18.87
Deductions
W2 -1.00 1.50 1.08 -0.81
D2 -2.00 1.10 2.10 -2.31
Total 514.13 sq.m
7.1.2 Internal Plaster on Ceiling (1:4)
Ground floor
ECD 2 2.73 4.70 25.62
Classroom 1 2 2.73 4.70 25.62
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Secondary Beam
Along Grid A1-C1 2 6.90 0.89 12.28
Below staircase
Waist slab 2 3.00 2.00 12.00
Landing 1 1.93 4.20 8.09

First floor
Computer lab 2 2.73 4.70 25.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Classroom 2 2 2.73 4.70 25.62
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Secondary Beam 0.00
Along Grid A1-C1 2 6.90 0.89 12.28
Below staircase
Waist slab 2 3.00 2.00 12.00
Landing 1 1.93 4.20 8.09

Second floor
Classroom 3 2 2.73 4.70 25.62
Classroom 4 2 2.73 4.70 25.62
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Slab Extension
Grid A & D 2 9.80 1.00 19.60
Grid 1 2 6.30 1.00 12.60
Grid 3 2 5.50 1.00 11.00
1 6.80 1.50 10.20
Secondary Beam 0.00
Along Grid A1-C1 2 6.90 0.89 12.28
Below staircase
Waist slab 2 3.00 2.00 12.00
Landing 1 1.93 4.20 8.09

Top floor
Grid 1-2 1 4.7 4.2 19.74
Corridor 1 4.2 2.2 9.24
Slab Extension 1 28.2 0.75 21.15
Total 453.98 sq.m
7.1.3 On Outer Wall (1:6)
7.1.3.1 External Plaster
Below Plinth
Grid A & D 2 5.73 0.45 5.15
Grid 1 1 17.78 0.45 8.00

Column plaster
Ground floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions
Junctions -32 0.3 0.50 -4.80

First floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions
Junctions -32 0.3 0.50 -4.80

Second floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Junctions -32 0.3 0.50 -4.80

Top floor
Grid 1 & 3 4 2.6 1.24 12.87
Grid 2 2 2.6 0.73 3.77
Deductions
Junctions -14 0.3 0.50 -2.10

Beam plaster
Ground floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00
Edge beam 1 7.95 1 7.95
Landing beam 1 1 4.05 0.45 1.80

First floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00

Second floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00

Top floor
Grid 1 & 2 2 4.05 0.5075 4.11
Grid B & C 2 6.35 0.515 6.54

Exterior wall plaster


Ground floor
Grid 1 1 15.15 2.5 37.88
Grid 2 1 11.1 2.5 27.75
Grid A & D 2 4.425 2.5 22.125

First floor
Grid 1 1 15.15 2.5 37.88
Grid 2 1 11.1 2.5 27.75
Grid A & D 2 4.425 2.5 22.125

Second floor
Grid 1 1 15.15 2.5 37.88
Grid 2 1 11.1 2.5 27.75

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Grid A & D 2 4.425 2.5 22.125

Top floor
Grid 1 & 2 2 4.05 2.1 17.01
Grid B & C 2 4.425 2.1 18.585

Parapet Wall
Top Floor 2 22.25 2.15 95.68
1 7.30 3.35 24.455
Roof 1 29.20 2.35 68.62

Deduction
W1 -24 1.1 1.125 -29.70
W2 -3 1.5 1.075 -4.84
W3 -1 1.5 0.325 -0.49
V1 -24 1.1 0.55 -14.52
D1 -12 1.1 2.5 -33.00
D2 -2 1.1 1.9 -4.18
Total 730.59 sq.m
7.2 PAINTING WORKS
7.2.1 DISTEMPER PAINT
As per Internal plaster on wall 514.13
As per internal plaster on ceiling 453.98
Total 968.11 sq.m

7.2.2 Exterior Weather Coat Paint


As per exterior plaster 730.59
Total 730.59 sq.m

7.2.4 Enamel Painting


Doors Factor
D1 12 1.10 2.50 2.00 66.00
D2 2 1.10 1.90 2.00 8.36
D3 1 1.00 1.55 2.00 3.10
Collapsable Gate 1 4.05 2.50 2.00 20.25
Window
W1 24 1.10 1.13 2.00 59.40
W2 3 1.50 1.08 2.00 9.68
V1 24 1.10 0.55 2.00 29.04
Window Grill
W1 24 1.10 1.13 2.00 59.40
W2 3 1.50 1.08 2.00 9.68
W3 1 1.50 0.33 2.00 0.98
V1 24 1.10 0.55 2.00 29.04
Total 294.92 sq.m

8 MISCELLANOUS
8.3 Railing
Total Total Wt
Staircase Railing Length Kg/m
Length (Kgs)
Horizontal ISNB 40M 1 21.84 21.84 3.56 77.75
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 21.84 87.36 0.85 74.26
Horizontal 25mm Square Pipe (Top 8.50
Floor) 4 2.125 0.85 7.23
Balcony Railing
First Floor

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Horizontal ISNB 40M 1 19 19.00 3.56 67.64
Horizontal ISNB 32M 2 19 38.00 3.10 117.80
Vertical ISNB 32M 15 1.14 17.10 3.10 53.01
Inclined ISNB 32M 15 0.134 2.01 3.10 6.23
Vertical 25mm Square Pipe 128 0.82 104.96 0.85 89.22

Second Floor
Horizontal ISNB 40M 1 19 19.00 3.56 67.64
Horizontal ISNB 32M 2 19 38.00 3.10 117.80
Vertical ISNB 32M 15 1.14 17.10 3.10 53.01
Inclined ISNB 32M 15 0.134 2.01 3.10 6.23
Vertical 25mm Square Pipe 128 0.82 104.96 0.85 89.22

Parapet Wall
ISNB 40M(Horizontal Bars) 2 22.96 45.92 3.56 163.48
ISNB 32M(Horizontal Bars) 2 22.96 45.92 3.10 142.35
Vertical ISNB 32M 30 0.40 12.00 3.10 37.20
Inclined ISNB 32M 30 0.134 4.02 3.10 12.46
Vertical 25mm Square Pipe 332 0.30 99.60 0.85 84.66
Base plate 131 0.00009375 0.01 7850 96.41
12 mm dia. Anchor Bolt, Nut 524 0.13 68.12
Total 1,508.41 k.g

8.4 Sewer, Rain and Waste Water Installation


- 110 mm ED 6 kg/sqcm
Top Floor to Ground Level 4 9.00 36.00
Roof to Top Floor 1 3.10 3.10
Total 39.10 R.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Secondary School
Location : Gakhu, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
A Foundation for footing
1 Footing (F1,1700 X1700) 2
X- direction 16 8 1.9 30.4 1.59 48.34 0.1 0.1
Y- direction 16 8 1.9 30.4 1.59 48.34 1.7

2 Combine Footing CF1 2


For Top mesh
X- direction 16 36 2.3 165.6 1.59 263.30 0.1 0.1
Y- direction 16 11 7.30 160.6 1.59 255.35 2.1
For Bottom mesh
X- direction 16 36 2.3 165.6 1.59 263.30 0.1 0.1
Y- direction 20 11 7.30 240.9 2.47 595.02 7.1

3 Combine Footing CF2 1


For Top mesh
X- direction 16 29 1.9 55.1 1.59 87.61
Y- direction 16 6 6.60 39.6 1.59 62.96 0.1 0.1
For Bottom mesh 1.7
X- direction 16 29 1.9 55.1 1.59 87.61
Y- direction 20 6 6.60 39.6 2.47 97.81 0.1 0.1
6.4

4 Combine Footing CF3 2


For Top mesh
X- direction 16 36 1.9 136.8 1.59 217.51
Y- direction 16 6 7.30 87.6 1.59 139.28 0.1 0.1
For Bottom mesh 1.7
X- direction 16 36 1.9 136.8 1.59 217.51
Y- direction 20 9 7.30 131.4 2.47 324.56 0.1 0.1
7.3

B Column
1 All Grid 12 20mm ɸ 20mm ɸ
Main Bar 20 2 7.11 170.64 2.47 421.48
20 2 4.10 98.40 2.47 243.05
16 4 6.85 328.80 1.59 522.79
16 4 3.85 184.80 1.59 293.83 6.30 3.30

0.15 0.15
0.65 0.65

16mm ɸ 16mm ɸ

6.2
3.2

0.15 0.15
0.5 0.5

2 Stiruups 0.37 0.14


For 12 column 12 10 18 1.95 409.5 0.6 253.89 0.1 0.1
10 18 1.47 308.7 0.6 191.39 0.495 0.495
10 18 1.3 273 0.6 169.26

0.37
0.18 0.1

C For lower tie beam


1 Grid 1,2 & 3 3 3.49 3.49
Top bar (T/O) 12 2 11.25 67.50 0.89 60.08 0.485 11.25 0.485
12 4 3.98 47.76 0.89 42.51 8.75 8.75
12 1 9.24 27.72 0.89 24.67
12 1 9.24 27.72 0.89 24.67 0.485 0.485

Bottom Bar (T/O) 3 12 2 9.24 55.44 0.89 49.34 0.485 8.75 8.75 0.485
12 2 9.24 55.44 0.89 49.34
12 1 11.25 33.75 0.89 30.04
12 2 3.98 23.88 0.89 21.25 11.25
0.485 0.485
3.49 3.49
2 Grid A,B,C,D 4
Top bar (T/O) 12 3 8.65 103.80 0.89 92.38 7.88
Bottom bar (T/O) 12 3 8.65 103.80 0.89 92.38 0.385 0.385

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
3 Stirrups 0.385 0.385
Grid 1,2,3 3 10 180 1.20 648.00 0.62 401.76 7.88
Grid A,B,C,D 4 10 60 1.20 288.00 0.62 178.56
0.25
0.1
0.25

D Plinth Tie beam


1 For Grid 1,2 &3 3 3.63 3.63
Top bar 16 4 4.39 52.68 1.59 83.76 0.765 11.46 0.765
16 2 11.46 68.76 1.59 109.33
12 1 9.24 27.72 0.89 24.67 8.75 8.75
12 1 9.24 27.72 0.89 24.67
0.485 0.485
Bottom Bar 16 2 9.64 57.84 1.59 91.97
16 2 9.64 57.84 1.59 91.97 0.765 0.765
12 2 3.98 23.88 0.89 21.25 8.86 8.86
12 1 11.22 33.66 0.89 29.96
11.22
0.485 0.485
3.49 3.49

2 Grid A,B,C,D & E 5 0.665 0.665


Top Bar 16 2 9.21 92.10 1.59 146.44 7.88
12 1 8.65 43.25 0.89 38.49
Bottom bar 16 2 9.21 92.10 1.59 146.44 0.385 0.385
12 1 8.65 43.25 0.89 38.49 7.88

Stirrups 0.25
Grid 1,2,3 3 10 209 1.20 752.40 0.62 466.49 0.1
Grid A,B,C,D,E 5 10 65 1.20 390.00 0.62 241.80 0.25

E GF to FF Column
1 All Grid 12
Main Bar 20 2 7.20 172.80 2.47 426.82 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6

1.2 0.96

2 Stiruups 0.345 0.124


For 12 column 12 10 30 1.78 640.8 0.6 397.30 0.1 0.1
10 30 1.21 435.6 0.6 270.07 0.445 0.445
10 30 1.34 482.4 0.6 299.09

0.345
0.158 0.1

F Staircase (GF to FF)


1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
2 Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70 1.88
3 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
4 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
0.12
0.15

0.46 0.15
0.22
0.15

0.26 0.15 0.42


0.22 0.22
0.15 0.15

G First Floor Beam 3.63 3.63


Main Beam 0.765 11.46 0.765
1 For Grid 1 1
Top bar 16 4 4.39 52.68 1.59 83.76 8.875
16 2 11.46 68.76 1.59 109.33 8.875
16 1 9.64 28.92 1.59 45.98 0.765 0.765
16 1 9.64 28.92 1.59 45.98
0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
16 2 4.39 26.34 0.89 23.44 11.46
16 1 11.46 34.38 0.89 30.60 0.485 0.485
3.63 3.63
Stirupps 10 209 1.60 334.40 0.62 207.33

2 For Grid 2 1 3.79 3.79


Top bar 20 4 4.79 57.48 2.47 141.98 1 11.7 1
20 2 11.70 70.20 2.47 173.39
20 1 10.04 30.12 2.47 74.40 9.04 9.04
20 1 10.04 30.12 2.47 74.40
1 1
Bottom Bar 16 2 9.64 57.84 1.59 91.97
16 2 9.64 57.84 1.59 91.97 0.765 0.765
16 2 4.39 26.34 0.89 23.44 8.875 8.875
16 1 11.46 34.38 0.89 30.60
11.46
Stirupps 10 209 1.60 334.40 0.62 207.33 0.765 0.765
3.63 3.63

3 For Grid 3 1 3.63 3.63


Top bar 16 4 4.39 52.68 1.59 83.76 0.765 11.46 0.765
16 2 11.46 68.76 1.59 109.33
16 1 9.64 28.92 1.59 45.98 8.875 8.875
16 1 9.64 28.92 1.59 45.98
0.765 0.765

0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
12 2 3.98 23.88 0.89 21.25 11.25
12 1 11.25 33.75 0.89 30.04 0.485 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33 3.49 3.49

0.765 0.765
8.86 8.86
4 Grid A 1
Top bar 20 2 9.78 19.56 2.47 48.31 7.89
16 1 9.22 9.22 1.59 14.66 0.945 0.945
Bottom bar 20 2 9.78 19.56 2.47 48.31
16 1 9.22 9.22 1.59 14.66 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54

5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54

6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54

7 Grid D 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 20 2 9.78 19.56 2.47 48.31 0.665 7.89 0.665
16 1 9.22 9.22 1.59 14.66
Stirupps 10 58 1.60 92.80 0.62 57.54

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Secondary beam
1 Grid A1,C1 2 7.89
Top bar 16 3 9.22 55.32 1.59 263.88 0.665 0.665
Bottom bar 16 3 9.22 55.32 1.59 263.88
Stirupps 10 58 1.35 78.30 0.62 145.64 0.665 7.89 0.665

Extra bar
For short span 2.175
Grid 1 1 16 2 3.04 6.08 1.59 9.67 0.765 0.1
16 2 3.70 7.40 1.59 11.77
3.5
0.1 0.1
Grid 2 1 16 2 3.80 7.60 1.59 12.08
16 1 2.45 2.45 1.59 3.90 0.1 3.60 0.1
0.1 2.25 0.1

0.96 0.96
Bent up bar in primary
H and secondary beam 16 12 3.01 36.12 1.59 57.43
junction 0.42

0.25
I Landing Beam(GF to FF) 4.85
Top bar 16 3 6.35 19.05 1.59 30.2895 0.75 0.75
Bottom bar 16 3 6.35 19.05 1.59 30.2895 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375

J First Floor Slab Rebar 0.375 Type A


Grid A-B and C-D 2 0.085
Short Span 8.28
Main Bar Type A 8 20 8.74 349.40 0.4 139.76
Main bar Type B 8 20 8.83 353.36 0.4 141.34 Type B

0.375 0.55
Long Span 0.085 0.33
A-B 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 0.45 Type A 0.45
Main bar Type B 8 19 7.75 147.21 0.4 58.88 0.085 0.085
6.2
C-D 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 Type B
Main bar Type B 8 19 7.75 147.25 0.4 58.90 0.45 1.35 0.45
0.085 0.33
A-D Grid (2-3) 1
Main bar
Main Bar Type A 8 13 18.62 242.06 0.4 96.82
Main bar Type B 8 13 19.02 247.26 0.4 98.90

Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 2 8 12 8.5 204.00 0.4 81.60
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid A1,C1 2 8 14 2.16 60.48 0.4 24.19 0.055 2.05 0.055
Along Grid 2( A-B and C-D) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (B-C) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

Edge Beam
Along short Span 2
Top Bar 12 2 2.5 10 0.89 8.90 0.75 1 0.75
Bottom Bar 12 2 2.2 8.8 0.89 7.83

Along Long Span 1


Top Bar 12 2 7.6 15.2 0.89 13.53 0.75 6.1 0.75
Bottom Bar 12 2 7.6 15.2 0.89 13.53
Stirrup 1 10 55 1.28 70.4 0.62 43.65

K FF to SF Column
1 All Grid 12
Main Bar 20 2 7.20 172.80 2.47 426.82 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
1.2 0.96

2 Stiruups 0.345 0.124


For 12 column 12 10 30 1.78 640.8 0.6 397.30 0.1 0.1
10 30 1.21 435.6 0.6 270.07 0.445 0.445
10 30 1.34 482.4 0.6 299.09

0.345
0.158 0.1

L Staircase (FF to SF)


1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
2 Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70 1.88
3 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
4 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15
0.12
0.15

0.46 0.15
0.22
0.15

0.26 0.15 0.42


0.22 0.22
0.15 0.15

M Second Floor Beam 3.63 3.63


Main Beam 0.765 11.46 0.765
1 For Grid 1 1
Top bar 16 4 4.39 52.68 1.59 83.76 8.875
16 2 11.46 68.76 1.59 109.33 8.875
16 1 9.64 28.92 1.59 45.98 0.765 0.765
16 1 9.64 28.92 1.59 45.98
0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
16 2 4.40 26.40 0.89 23.50 11.46
16 1 11.46 34.38 0.89 30.60 0.765 0.765
3.63 3.63
Stirupps 10 209 1.60 334.40 0.62 207.33

2 For Grid 2 1 3.79 3.79


Top bar 20 4 4.79 57.48 2.47 141.98 1 11.7 1
20 2 11.70 70.20 2.47 173.39
20 1 10.04 30.12 2.47 74.40 9.04
20 1 10.04 30.12 2.47 74.40 9.04
1 1
Bottom Bar 16 2 9.64 57.84 1.59 91.97
16 2 9.64 57.84 1.59 91.97 0.765 0.765
16 2 4.40 26.37 0.89 23.47 8.875 8.875
16 1 11.46 34.38 0.89 30.60
11.46
Stirupps 10 209 1.60 334.40 0.62 207.33 0.765 0.765
3.63 3.63

3 For Grid 3 1 3.63 3.63


Top bar 16 4 4.39 52.68 1.59 83.76 0.765 11.46 0.765

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
16 2 11.46 68.76 1.59 109.33
16 1 9.64 28.92 1.59 45.98 9.04
16 1 9.64 28.92 1.59 45.98 9.04
0.765 0.765

0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
12 2 3.98 23.85 0.89 21.23 11.25
12 1 11.30 33.90 0.89 30.17 0.485 0.485
Stirupps 10 209 1.60 334.40 0.62 207.33 3.49 3.49

0.765 0.765
8.86 8.86
4 Grid A 1
Top bar 20 2 9.80 19.60 2.47 48.41 7.89
16 1 9.22 9.22 1.59 14.66 0.945 0.945
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 58 1.60 92.80 0.62 57.54 0.665 7.89 0.665

5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54

6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54

7 Grid D 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 0.00 0.00 1.59 0.00
Bottom bar 20 2 9.78 19.56 2.47 48.31 0.665 7.89 0.665
16 1 9.22 9.22 1.59 14.66
Stirupps 10 58 1.60 92.80 0.62 57.54

Secondary beam
1 Grid A1,C1 2 7.89
Top bar 16 3 9.22 55.32 1.59 263.88 0.665 0.665
Bottom bar 16 3 9.22 55.32 1.59 263.88
Stirupps 10 58 1.35 78.30 0.62 145.64 0.665 7.89 0.665

Extra bar
For short span 2.175
Grid 1 1 16 2 3.04 6.08 1.59 9.67 0.765 0.1
16 2 3.70 7.40 1.59 11.77
3.5
0.1 0.1
Grid 2 1 16 2 3.80 7.60 1.59 12.08
16 1 2.45 2.45 1.59 3.90 0.1 3.60 0.1
0.1 2.25 0.1

0.96 0.96
Bent up bar in primary
N and secondary beam 16 12 3.01 36.12 1.59 57.43
junction 0.42

0.25
O Landing Beam(FF to SF) 4.85
Top bar 16 3 6.35 19.05 1.59 30.2895 0.75 0.75
Bottom bar 16 3 6.35 19.05 1.59 30.2895 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375

P Second Floor Slab Rebar 0.375 Type A


Grid A-B and C-D 2 0.085
Short Span 8.28
Main Bar Type A 8 20 8.74 349.40 0.4 139.76
Main bar Type B 8 20 8.83 353.36 0.4 141.34 Type B

0.375 0.55
Long Span 0.085 0.33
A-B 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 0.45 Type A 0.45
Main bar Type B 8 19 7.75 147.21 0.4 58.88 0.085 0.085
6.2
C-D 1

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 Type B
Main bar Type B 8 19 7.75 147.25 0.4 58.90 0.45 1.35 0.45
0.085 0.33
A-D Grid (2-3) 1
Main bar
Main Bar Type A 8 13 18.62 242.06 0.4 96.82
Main bar Type B 8 13 19.02 247.26 0.4 98.90

Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 2 8 12 8.5 204.00 0.4 81.60
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid A1,C1 2 8 14 2.16 60.48 0.4 24.19 0.055 2.05 0.055
Along Grid 2( A-B and C-D) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (B-C) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

Q SF to TF Column
All Grid 12
Main Bar 20 2 5.50 132.00 2.47 326.04 20mmɸ 16mmɸ
16 4 5.30 254.40 1.59 404.50 4.3 4.34

1.2 0.96

2 Stiruups 0.345 0.124


For 12 column 12 10 30 1.78 640.8 0.6 397.30 0.1 0.1
10 30 1.21 435.6 0.6 270.07 0.445 0.445
10 30 1.34 482.4 0.6 299.09

0.345
0.158 0.1

R Staircase (SF to TF)


1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
2 Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70 1.88
3 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
4 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15
0.12
0.15

0.46 0.15
0.22
0.15

0.26 0.15 0.42


0.22 0.22
0.15 0.15

S Landing Beam(SF to TF) 4.85


Top bar 16 3 6.35 19.05 1.59 30.2895 0.75 0.75
Bottom bar 16 3 6.35 19.05 1.59 30.2895 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
0.375

T Top Floor Beam


Main Beam 3.49 11.25 3.49
1 For Grid 1 0.485 0.485
Top bar 1 16 4 9.64 38.56 1.59 61.31 8.875
1 12 1 3.98 3.98 0.89 3.54 8.875
1 12 1 11.25 11.25 0.89 10.01 0.765 0.765
1 12 1 3.98 3.98 0.89 3.54
0.485 0.485
Bottom Bar 1 16 2 4.40 8.79 1.59 13.98 8.75 8.75
1 16 2 11.46 22.92 1.59 36.44
1 16 2 4.40 8.80 1.59 13.99 11.46
1 12 2 3.98 7.95 0.89 7.08 0.765 0.765
3.63 3.63
Stirupps 1 10 209 1.60 334.40 0.62 207.33

2 For Grid 2 3.49 3.49


Top bar 1 16 4 9.64 38.56 1.59 61.31 0.765 11.46 0.765
1 16 1 4.40 4.40 1.59 7.00
1 16 1 11.46 11.46 1.59 18.22 8.875
1 16 1 4.40 4.40 1.59 7.00 8.875
0.765 0.765
Bottom Bar 1 16 2 4.40 8.80 1.59 13.99
1 16 2 11.46 22.92 1.59 36.44 0.765 0.765
1 16 2 4.40 8.80 1.59 13.99 8.875 8.875
1 16 2 9.64 19.28 1.59 30.66
11.46
Stirupps 1 10 209 1.60 334.40 0.62 207.33 0.765 0.765
3.49 3.49

3 For Grid 3 3.49 3.49


Top bar 1 16 4 9.64 38.56 1.59 61.31 0.765 11.46 0.765
1 16 1 4.40 4.40 1.59 7.00
1 16 1 11.46 11.46 1.59 18.22 8.875
1 16 1 4.40 4.40 1.59 7.00 8.875
0.765 0.765

0.485 0.485
Bottom Bar 1 16 2 4.40 8.80 1.59 13.99 8.75 8.75
1 16 2 11.46 22.92 1.59 36.44
1 16 2 4.40 8.80 1.59 13.99 11.46
1 12 2 9.24 18.47 0.89 16.44 0.765 0.765
Stirupps 1 10 209 1.60 334.40 0.62 207.33 3.49 3.49

4 Grid A
Top bar 1 16 3 9.21 27.63 1.59 43.93 7.89
Bottom bar 1 16 3 9.21 27.63 1.59 43.93 0.665 0.665
Stirupps 1 10 57 1.60 91.60 0.62 56.79
0.665 7.89 0.665

5 Grid B 7.89
Top bar 1 20 2 9.78 19.56 2.47 48.31 0.945 0.945
1 16 1 9.21 9.21 1.59 14.64
Bottom bar 1 16 3 9.21 27.63 1.59 43.93 0.665 7.89 0.665
Stirupps 1 10 57 1.60 91.60 0.62 56.79

6 Grid C 7.89
Top bar 1 16 3 9.21 27.63 1.59 43.93 0.665 0.665

Bottom bar 1 16 3 9.21 27.63 1.59 43.93 0.665 7.89 0.665


Stirupps 1 10 57 1.60 91.60 0.62 56.79

7 Grid D 7.89
Top bar 1 16 2 9.21 18.42 1.59 29.29 0.665 0.665
1 12 1 8.86 8.86 0.89 7.89
Bottom bar 1 12 3 8.86 26.58 0.89 23.66 0.485 7.89 0.485

Stirupps 1 10 57 1.60 91.60 0.62 56.79

Secondary beam
1 Grid A1,C1 2 7.75
Top bar 2 16 3 9.08 54.48 1.59 259.87 0.665 0.665
Bottom bar 2 16 3 9.08 54.48 1.59 259.87
Stirupps 2 10 59 1.35 159.30 0.62 296.30 0.665 7.75 0.665

Bent up bar in primary


U and secondary beam 1 16 12 3.01 36.12 1.59 57.43
junction 0.42

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
0.25
V Top Floor Slab
1 Main Bar Along X-axis 1.9 1.5 0.58
Type A (Grid 1-2) 2 8 18 8.04 289.44 0.4 115.78 0.09 0.09
Type B (Grid 1-2) 2 8 18 8.04 289.44 0.4 115.78 1.5 2.38
Type C (Grid 2-3) 1 8 8 12 96.00 0.4 38.40 Type A
1 8 8 7.48 59.84 0.4 23.94 0.58
Type D (Grid 2-3) 1 8 7 12 84.00 0.4 33.60 0.09 7.28 0.09
1 8 7 7.48 52.36 0.4 20.94 Type B

1.9 1.5 1.875 1.385


0.09
1.5 1.5 2.25
0.43 1.5 1.9
0.09
1.5 1.5
Type C

0.09 0.09
11.91 7.39
Type D
2 Distribution Bar
Along X axis 6.3
Type A (Grid 1-2) 2 8 20 6.3 252.00 0.4 100.80 Type A
Type B (Grid 1-2) 1 8 10 12 120.00 0.4 48.00
1 8 10 5.3 53.00 0.4 21.20 5.3
12
Type B
Along Y axis
Type A (Grid A-B & C-D) 2 8 21 7.8 327.60 0.4 131.04 7.8
Type B (Grid A-B & C-D) 1 8 17 2.8 47.60 0.4 19.04 Type A

2.8
Type B
3 Negative bar
Grid 1 2 8 9 2.9 52.20 0.4 20.88 0.05 2.8 0.05
Grid 2 2 8 9 2.65 47.70 0.4 19.08
1 8 6 1.25 7.50 0.4 3.00 0.05 2.55 0.05
Grid 3 2 8 9 2.15 38.70 0.4 15.48
1 8 6 2.65 15.90 0.4 6.36 0.05 1.15 0.05

0.05 2..5 0.05

0.05 2.55 0.05

W Column
TF to RF Column
All Grid 12
Main Bar 20 2 4.00 96.00 2.47 237.12 20mmɸ 16mmɸ
16 4 3.76 180.48 1.59 286.96 2.8 2.8

1.2 0.96

Stiruups 0.37 0.14


For 12 column 12 10 22 1.95 514.8 0.6 319.18 0.1 0.1
12 10 22 1.3 343.2 0.6 212.78 0.495 0.495
12 10 22 1.45 382.8 0.6 237.34

0.37
0.18 0.1

Y Roof Floor Beam


Main Beam
1 For Grid 1 4.87
Top bar 1 16 2 6.29 12.58 1.59 20.00 0.71 0.71
1 12 1 5.77 5.77 0.89 5.14
Bottom Bar 1 12 3 5.77 17.31 0.89 15.41 0.45 0.45
4.87
Stirupps 1 10 35 1.60 56.00 0.62 34.72

2 For Grid 2
Top bar 1 16 2 6.29 12.58 1.59 20.00 4.87
1 12 1 5.77 5.77 0.89 5.14 0.71 0.71

Bottom Bar 1 16 2 6.29 12.58 1.59 20.00 0.45 0.45


1 12 1 5.77 5.77 0.89 5.14 4.87

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Stirupps 1 10 35 1.60 56.00 0.62 34.72

3 For Grid 3
Top bar 1 16 2 6.40 12.80 1.59 20.35 4.87
1 12 1 5.84 5.84 0.89 5.20 0.765 0.765

Bottom Bar 1 16 2 6.40 12.80 1.59 20.35 0.485 0.485


1 12 1 5.84 5.84 0.89 5.20 4.87

Stirupps 1 10 35 1.60 56.00 0.62 34.72

4 Grid B 7.89
Top bar 1 16 2 9.21 18.42 1.59 29.29 0.665 0.665
1 12 1 8.86 8.86 0.89 7.89
Bottom bar 1 16 2 9.21 18.42 1.59 29.29 0.485 7.89 0.485
1 12 1 8.86 8.86 0.89 7.89

Stirupps 1 10 58 1.60 92.80 0.62 57.54

5 Grid C 7.99
Top bar 1 16 2 9.20 18.40 1.59 29.26 0.6 0.6
1 12 1 8.89 8.89 0.89 7.91
Bottom bar 1 16 2 9.20 18.40 1.59 29.26 0.45 7.99 0.45
1 12 1 8.89 8.89 0.89 7.91

Stirupps 1 10 58 1.60 92.80 0.62 57.54

Z Roof Floor Slab


Along X-axis 2.025 2.025
Type A (Grid B-C) 1 8 24 6.48 155.52 0.4 62.21 0.09 2.25 0.09
Type B (Grid B-C) 1 8 24 6.48 155.52 0.4 62.21 Type A
0.09 0.09
6.3
Type B

Along Y-axis 1.525 1.875 2.15


Type A (Grid 1-3) 1 8 14 11.98 167.72 0.4 67.09 0.09 0.09
Type B (Grid 1-3) 1 8 14 11.98 167.72 0.4 67.09 1.25 Type A 5

Distribution Bars 0.09 11.8 0.09


Along X-axis 1 8 30 4.8 144.00 0.4 57.60 Type B
Along Y-axis 1 8 18 7.8 140.40 0.4 56.16 4.8

7.8
Cantilever Bars
Type A (Along X-axis)
Top Bar 1 8 5 6.48 32.40 0.4 12.96 0.09 6.3 0.09
Bottom Bar 1 8 5 6.48 32.40 0.4 12.96 Type A
Type B (Along Y-axis)
Top Bar 1 8 5 11.98 59.90 0.4 23.96 0.09 11.8 0.09
Bottom Bar 1 8 5 11.98 59.90 0.4 23.96 Type B

Negative Bars
Grid 1-2 2.65
Type A 1 8 10 2.65 26.50 0.4 26.50
Grid 3 Type A
Type B 1 8 5 1.9 9.50 0.4 9.50
1.9
Grid B & C 1 8 16 2.5 40.00 0.4 40.00 Type B

2.5

I Sill & Lintel Bands


9.1 Ground Floor
Along Grid 1 A-B & C-D 2 10 8 0.83 13.20 0.62 8.18 5.55
2 10 4 5.55 44.40 0.62 27.53 0.83 0.83
Along Grid 1B-C 1 10 4 0.83 3.32 0.62 2.06
1 10 2 4.05 8.10 0.62 5.02 0.6 4.05 0.6
Along Grid 2 2 10 8 0.83 13.20 0.62 8.18 0.075 0.075
2 10 4 5.55 44.40 0.62 27.53
Along Grid A,B,C & D 4 10 8 0.83 26.56 0.62 16.47 4.43
4 10 4 4.43 70.88 0.62 43.95 0.83 0.83

Stirups 0.3
Grid 1 1 8 175 0.3 52.50 0.4 21.00
Grid 2 1 8 148 0.3 44.40 0.4 17.76
Grid A,B , C & D 4 8 59 0.3 70.80 0.4 28.32

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
9.2 First Floor
Along Grid 1 A-B & C-D 2 10 8 0.83 13.20 0.62 8.18
2 10 4 5.55 44.40 0.62 27.53
Along Grid 2 2 10 8 0.83 13.20 0.62 8.18
2 10 4 5.55 44.40 0.62 27.53
Along Grid A,B,C & D 4 10 8 0.83 26.56 0.62 16.47
4 10 4 4.43 70.88 0.62 43.95
Stirups
Grid 1 1 8 148 0.3 44.40 0.4 17.76
Grid 2 1 8 148 0.3 44.40 0.4 17.76
Grid A,B , C & D 4 8 59 0.3 70.80 0.4 28.32

9.3 Second Floor


Along Grid 1 A-B & C-D 2 10 8 0.83 13.20 0.62 8.18
2 10 4 5.55 44.40 0.62 27.53
Along Grid 2 2 10 8 0.83 13.20 0.62 8.18
2 10 4 5.55 44.40 0.62 27.53
Along Grid A,B,C & D 4 10 8 0.83 26.56 0.62 16.47
4 10 4 4.43 70.88 0.62 43.95
Stirups
Grid 1 1 8 148 0.3 44.40 0.4 17.76 0.6
Grid 2 1 8 148 0.3 44.40 0.4 17.76 0.075
Grid A,B , C & D 4 8 59 0.3 70.80 0.4 28.32

9.4 Top Floor


Along Grid 1B-C 1 10 4 0.83 3.32 0.62 2.06
1 10 2 4.05 8.10 0.62 5.02
Along Grid B 1-2 1 10 4 0.83 3.32 0.62 2.06
1 10 2 4.05 8.10 0.62 5.02
Along Grid B 2-3 1 10 4 0.83 3.32 0.62 2.06
Along Grid C 1-2 1 10 4 0.83 3.32 0.62 2.06
1 10 2 4.05 8.10 0.62 5.02
Along Grid C 2-3 1 10 4 0.83 3.32 0.62 2.06
Stirups
Grid 1 1 8 27 0.3 8.10 0.4 3.24
Grid B & C 2 8 41 0.3 24.60 0.4 9.84

Parapet Wall
Top floor 1 10 2 57.45 114.90 0.62 71.24
Stirrups 1 8 343 0.3 102.90 0.4 41.16
Roof floor 1 10 2 33.8 67.60 0.62 41.91
Stirrups 1 8 202 0.3 60.60 0.4 24.24

II Vertical Bands
10.1 First Floor 0.075
Grid 2 8 10 4 0.83 26.56 0.62 16.47
8 10 2 2.5 40.00 0.62 24.80
Stirrups 8 8 18 0.3 43.20 0.4 17.28 0.6
0.3
10.2 Second Floor 2.5
Grid 2 8 10 4 0.83 26.56 0.62 16.47
8 10 2 2.5 40.00 0.62 24.80
Stirrups 8 8 18 0.3 43.20 0.4 17.28 0.6

10.3 Top Floor


Grid 2 8 10 4 0.83 26.56 0.62 16.47 0.075
8 10 2 2.5 40.00 0.62 24.80
Stirrups 8 8 18 0.3 43.20 0.4 17.28

10.4 Parapet Wall


Top floor 35 10 2 1 70.00 0.62 43.40
Stirrups 35 8 7 0.3 73.50 0.4 29.40
Roof floor 20 10 2 1.1 44.00 0.62 27.28
Stirrups 20 8 8 0.3 48.00 0.4 19.20
TOTAL 33110.12 Kgs
33.11 MT.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Existing Toilet Maintenance
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Measurement sheet of toilet


Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
1 5.00 5.00 25.00
Total 25.00 sq.m

1.5 Sand Filling


Periphery ot Soak pit 1 1.88 Area 1.32 2.49
Total 2.49 cu.m

2 CONCRETE WORKS
P.C.C For R.C.C. Works
R.C.C Works M20
Along the water trough
1 1.83 0.500 0.100 0.09
1 1.92 0.500 0.100 0.10
3 0.58 0.300 0.100 0.05
I Soak Pit
RCC slab 1 2.27 Area 0.13 0.28
Total 0.53 cu.m

Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 0.53 5.30
Total 5.30 Kg

Steel Reinforcement
160 KG Per cu.m 84.80
Total 84.80 Kg
0.08 Tons

Formworks
Along the water trough 2 3.75 0.875 6.56
6 0.58 0.300 1.04
For Soak Pit
RCC slab
Base Area 1 1.13 1.13
Along Sides 1 5.34 0.15 0.80
side formwork for void and
2 2.44 0.15
Removable Cover 0.73
Total 10.26 sq.m

3 BRICK WORKS
Full Brick (230 mm) Works (1:4c/s)
Below Water Trough 1 0.58 0.23 0.30 0.04
1 0.58 0.23 0.45 0.06
Soak Pit Brick work 1 0.20 0.50 0.10
Total 0.20 cu.m

Half Brick (125 mm) Works (1:4c/s)


Water Trough 1 0.58 0.30 0.17
Total 0.18 sq.m

Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 0.20 1.20 0.24
Total 0.24 cu.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
FLOORING WORKS
Cement Concrete Flooring
(40mm)
Along theWith
waterNeat Cement
trough 1 3.45 0.7 2.42
Punning Total 2.42 sq.m

7.2 Painting works


7.2.1 Distemper painting Works
Internal plaster
i) Existing large toilet
Urinal hall 3 6.16 6.16 113.84
Toilet 2 4.00 6.16 49.28
Ceiling plaster 1 5.20 5.20 27.04
ii)Staff toilet (small toilet) 2 1.00 1.20 2.40
Ceiling plaster 1 3.10 2.10 6.51
199.07
Deducting 20% openings -39.81
Total 163.12 sq.m

7.2.2 Exterior Weather Coat Paint


Exterior wall of large toilet 4.00 4.00 2.50 40.00
Exterior wall of small staff toilet
Long wall 2 2.50 2.50 12.50
Short wall 2 1.50 2.50 7.50
60.00
Deducting 20% opening 1 -12.00
Total 48.00 sq.m

Pump Shed
1 1 1.00
Total 1.00 Nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 20 20 20 60.00 r.m
copper conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1 1 1 3.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 10.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 15.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 30.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3 12 11 11 2 39.00 pts.
3.2 Two Way Light Point 1 1 1 3.00 pts.
3.3 Ceiling Fan Point 4 4.00 pts.
4 6A Universal Pin Light Power Socket Wiring 4 20 4 28.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 4 20 4 28.00 nos.
6 Wall Fan 8 8 8 24.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type 8.00 8.00 8.00 24.00 no.
7.2 12 W LED Surface Mounted Cylindrical type 3.00 4.00 4.00 2.00 13.00 no.
7.3 LED Wall Light 1.00 1.00 no.
8 Pull Box
Junction Box At External Post Top Light 1 1 1 3.00 no.
9 External Post Top Light Pole 3 3.00 nos.
10 Post Top External Light Fixtures 3 3.00 nos.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3.00 no.
11.2 Earthing Bar 3 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 65 65.00 r.m
12.3.2 12 SWG Cu wire 20.5 20.50 r.m
13 Earth Test link 1 1.00 nos.
14 Lightning Arrester 1 1.00 nos.
C Solar PV System
1 Solar PV Panel 8 8.00 nos.
2 Tubular Deep Cycle Battery 4 4.00 nos.
3 Hybrid Inverter 1 1.00 no.
D Fire Extinguisher
5.0kg Size ABC Stored Pressure Type Fire
1 1 1.00 nos.
Extinguisher

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

S.N Furniture Description Symbol Qty Unit Remarks


1 ECD Student Desk (6 Seater) D-03 2 nos.
2 Student Desk G3-5 (3 Seater) D-02B 7 nos.
3 Student Bench G3-5(3 Seater) B-02B 7 nos.
4 Student Desk G6-12(3 Seater) D-02C 21 nos.
5 Student Bench G6-12(3 Seater) B-02C 21 nos.
6 Soft Board F-01 1 nos.
7 Book Shelf F-02 3 nos.
8 Teacher's Table T-01 6 nos.
9 Teacher's Chair C-01 6 nos.
10 White Board F-03 5 nos.
11 Computer Table T-04 8 nos.
12 Computer Chair C-02 16 nos.
13 White Board with Stand F-05 1 nos.
14 Cusions F-16 12 nos.
15 Carpet 27.43 Sq.m ECD Flooring
16 Notice Board F-14 1 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

S. No. Description Quantity Unit Remarks


A PIPING WORKS
1 WATER SUPPLY INSTALLATION
a CPVC Pipe
40 mm 60.00 r.m
25mm 8.00 r.m
20mm 3.00 r.m
15mm 2.00 r.m
c CPVC Ball Valve
40mm 3.00 nos.
25mm 1.00 nos.
d Electric Centrifugal water pump of 0.5 HP 1.00 nos.
e 1000 Litres Capacity Water Storage Tank 1.00 nos.
2 WASTE WATER INSTALLATION
1 PVC SWR
1.1 110mm 47.50 r.m
3 White Glazed Earthenware 580*480mm Orissa Pan 1 nos.
e) CP self closing bib cock 4 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Length Breadth Height


S.No Description No. Qty. Unit Remarks
(m) (m) (m)
1 Site Clearance
Infront of 3-6C(XS)-A 1 6.75 1.50 10.13
1 13.50 2.50 33.75
Infront of existing toilet 1 6.00 5.00 30.00
Gate area 1 6.00 9.00 54.00
Way from Gate to Bldg 1 7.00 2.00 14.00
Total 141.88 sq.m
2 Earth Work Excavation
Excavation For Pavement
Infront of 3-6C(XS)-A 1 6.75 1.50 0.15 1.52
1 13.50 2.50 0.15 5.06
Infront of existing toilet 1 6.00 5.00 0.15 4.50
Gate area 1 6.00 9.00 0.15 8.10
Way from Gate to Bldg 1 7.00 2.00 0.15 2.10

Excavation For Steps 1 7.00 3.00 0.25 5.25


Excavation For Boundary Wall
Chain Link Fence 57 0.15 0.15 0.60 0.77
Excavation For Gate Column
Column 2 1.20 1.20 1.50 4.32
Bracing 40 0.30 0.30 0.30 1.08
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 33.74 cu.m
3 Earth Back Filling
Total Excavation Work 1 5.40 5.40
Deduction
PCC -1 0.32 -0.32
RCC -2 0.90 0.90 0.25 -0.41
-2 0.30 0.30 0.95 -0.17
Total 4.50 cu.m

4 Boulder Soling
For Concrete Pavement
Infront of 3-6C(XS)-A 1 6.75 1.50 0.15 1.52
1 13.50 2.50 0.15 5.06
Infront of existing toilet 1 6.00 5.00 0.15 4.50
Gate area 1 6.00 9.00 0.15 8.10
Way from Gate to Bldg 1 7.00 2.00 0.15 2.10

Soling For Gate Column


Column 2 0.90 0.90 0.20 0.32
Stone Soling for Flag Pole 1 0.70 0.80 0.35 0.20
Total 21.80 cu.m
5 P.C.C.(1:3:6) Works
PCC For Gate Column

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S.No Description No. Qty. Unit Remarks
(m) (m) (m)
Column 2 0.90 0.90 0.08 0.12
PCC For Flag Pole
Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
2 0.06 0.08 0.01
Total 0.55 cu.m
6 P.C.C.(1:2:4) Works
For Concrete Pavement
Infront of 3-6C(XS)-A 1 6.75 1.50 0.15 1.52
1 13.50 2.50 0.15 5.06
Infront of existing toilet 1 6.00 5.00 0.15 4.50
Gate area 1 6.00 9.00 0.15 8.10
Way from Gate to Bldg 1 7.00 2.00 0.15 2.10
Total 21.28 cu.m

7 P.C.C For R.C.C. Works


R.C.C. Works M20
A Foundation
Gate Column Footing
Footing 2 0.90 0.90 0.25 0.41

B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m

8 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10.00 0.99 9.90
Total 9.90 Kg
9 Steel Reinforcement
For gate
Total
At base of the footing kg per m
length
Main bar(10mm) 12 0.9 10.80 0.62 6.70
Distribution bar(10mm) 12 0.9 10.80 0.62 6.70
For column Ld (12mm) 16 0.4815 7.70 0.89 6.86
For column (12mm) 16 2.8 44.80 0.89 39.87
For stirrups (external) 8mm 54 1.138 61.45 0.39 23.97
For stirrups (Internal)) 8mm 54 0.72 38.88 0.39 15.16
Total 99.25 Kg
0.10 Tons
10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m

13 Full Brick (250 mm) Works (1:4c/s)


Gate Column 2 0.54 0.23 1.85 0.46
2 0.3 0.23 0.45 0.06
Flag Pole Base 2 0.8 0.23 0.55 0.20

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S.No Description No. Qty. Unit Remarks
(m) (m) (m)
Total 0.53 cu.m

14 Neat Cement Skirting works


Gate Column 2 2.4 4.80
Total 4.80 r.m

15 Metal Works (Fence)


Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 140 280.00 2.40 672.00
ISA 50x50x5mm 57 1.89 107.73 3.80 409.37
Bracing ISA 50x50x5mm 30 1.28 38.40 3.80 145.92
Total 1,227.30 k.g

16 Metal work (Entrance Gate)


Metal Gate
50mm Dia MS Pipe 2 7.13 14.26 3.61 51.48
25mm Dia MS Pipe 56 0.7 39.2 1.58 61.94
Middle sheet 1 0.74 0.0012 7850 6.97
Hole Fast 4 0.45 1.8 3.61 2.92
Total 123.31 k.g

17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m

18 Exterior Weather Coat Paint


As per Outside Plaster 1 7.8 7.80
Gate Column Skirting 2 2.36 0.10 0.47
Total 8.28 sq.m

19 Chain Link Fence(50x50 Mesh)


Fencing 1.00 140 1.20 168.00
Total 168.00 sq.m

20 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

21 Metal Railing
Total Total Wt.
Staircase Railing Length Kg/m
Length (kg)
Vertical ISNB 40M 12 1 12.00 3.56 42.72
Horizontal ISNB 40M 2 14.85 29.70 3.56 105.73
Horizontal 25mm Square Pipe 4 14.85 59.40 0.85 50.49
Total 198.94 Kgs

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha

Length Breadth Height


S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 Site Clearance & Mobilization
1.1 For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

2 Earthwork in excavation
2.1 For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

3 Earthback Filling
Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

4 Boulder soling
4.1 Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.

5 PCC Work (1:3:6)


5.1 Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

6 PCC for RCC Work 1:1.5:3


6.1 For Base Slab 1 3.35 3.10 0.18 1.82
6.2 For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
6.3 Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
6.4 Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

7 Silica Admixture
10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

8 Form works
8.1 For Base Slab 1 12.9 0.18 2.26
8.2 For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23
Short Wall 2 3.10 1.83 11.32
Inside wall

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
8.3 Trianagle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.75 0.42 2.33
8.4 Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 56.46 Sq.m.

9 PLASTERING WALL FINISHING WORKS


9.1 CEMENT PLASTER WORKS WITH
PUNNING
9.1.1 Base Slab 1 2.40 2.15 5.16
9.1.2 For Water Tank Wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
9.1.3 Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.75 0.42 2.33
9.1.4 Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 35.46 Sq.m.

10 Water Proof Coating


10.1 Inside Water tank 1 35.46
Total 35.46 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 35 7.01 245.35 0.62 152.12 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 32 7.286 233.152 0.62 144.55


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 35 2.503 175.21 0.62 108.6302 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 32 2.503 170.204 0.62 105.5265 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 67 1.79 239.86 0.62 148.71 0.6 0.6

0.592
0.592 0.6 0.6

D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.5296

3.02 3.02

0.3 0.3

2 Longer Span 10 21 3.87 325.08 0.62 201.5496 0.3 0.3

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05

2 Longer Span 10 31 3.42 424.08 0.62 262.93 3.32


0.05 0.05
F Man Hole Rebar
1 horizontal Rebar -2 10 6 1.2 -14.4 0.62 -8.93 0.9 0.3
Total 1576.17 Kg
1.58 Mt.

Prepared and Submitted By: Checked By: Approved By: