Shree Namruk LSS, Gakhu
Shree Namruk LSS, Gakhu
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-6C(XS)-A
School Name : Shree Namruk Devi Lower Secondary School
Location : Gakhu, Gorkha
Abstract of Cost
Type Design
Pay Quantity Total This Bill
Description of Works Unit Rate (NRs.) Toilet Site Water
Item No. in BOQ 3-6C(XS)-A Quantity
Maintenance Development Tank
A. PRELIMINARY/TEMPORARY WORKS
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00
2 SITE OFFICE ESTABLISHMENT Per month 12.00 25,000.00 12.00
3 PROJECT INFORMATION BOARD Nos. 1.00 10,000.00 1.00
4 SAFETY SIGN BOARD Nos. 1.00 10,000.00 1.00
5 BARRICADING WORKS R.m. 65.00 2,000.00 60.60
DISMANTLING OF COMPLETELY DAMAGED
6 Sq.m 99.85 3,000.00 97.50
BUILDING
7 SAFETY MATERIALS & SITE SAFETY L.S 1.00 100,000.00 1.00
8 CONSTRUCTION OF NEW TLC Sq.m 93.91 3,000.00 64.75
9 LAB TEST (WATER TEST) job 1.00 7,500.00
10 TEMPORARY TOILET Nos. 2.00 150,000.00 2.00
11 ROAD REPAIR & MAINTENANCE K.m 14.00 50,000.00 14.00
B. CIVIL WORKS-BUILDING
1 EARTHWORKS
1.1 SIITE CLEARANCE AND MOBILIZATION sq.m 380.51 100.00 318.45 25.00 343.45
1.2 EARTHWORKS IN EXCAVATION cu.m 228.95 400.00 162.25 162.25
1.3 EARTHBACK FILLING cu.m 107.31 300.00 123.92 123.92
1.4 BOULDER SOLING cu.m 58.52 6,000.00 46.59 46.59
1.5 SAND FILLING cu.m 2.49 6,000.00 2.49 2.49
2 CONCRETE WORKS -
2.1 P.C.C. -
2.1.1 P.C.C. (1:3:6) cu.m 10.02 14,000.00 8.21 8.21
2.1.2 P.C.C. (1:2:4) cu.m 14.29 16,000.00 11.87 11.87
2.2 P.C.C. FOR R.C.C. WORKS cu.m 225.51 20,000.00 210.52 0.53 211.05
2.3 SILICA CEMENT ADMIXTURE Kg 2255.1 300.00 2,105.19 5.30 2,110.49
2.4 STEEL REINFORCEMENT Mt. 36.09 130,000.00 33.11 33.11
2.5 FORM WORKS sq.m 1452.23 800.00 1,288.82 10.26 1,299.08
3 BRICK MASONRY WORKS -
BRICK MASONRY WORKS ( 1 : 4 c/s )ONE SIDE
3.1 cu.m 78.16 20,000.00 -
FAIRFACE
7.2.3 CLEAR SILICON WATER-REPELENT COATING sq.m 550.00 -
8.1.1 POINTING WORK IN BRICK MASONARY sqm 400.00 -
BOQ Total of items 3.1., 7.2.3 & 8.1.1: -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for
-
3-6C(S)-E
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 -
500,000.00
300,000.00
10,000.00
10,000.00
121,200.00
292,500.00
100,000.00
194,250.00
-
300,000.00
700,000.00
-
-
-
34,345.25
64,899.56
37,175.73
279,521.10
14,940.00
-
-
114,877.00
189,877.00
4,220,982.88
633,147.43
4,304,315.42
1,039,261.62
-
-
-
-
-
-
-
-
-
-
30,000.00
22,000.00
32,000.00
-
-
6,000.00
7,500.00
-
27,300.00
2,700.00
3,600.00
19,600.00
-
25,200.00
-
144,000.00
-
64,800.00
31,200.00
1,800.00
-
2,100.00
22,500.00
29,400.00
-
135,000.00
6,600.00
-
19,500.00
4,100.00
1,500.00
7,500.00
-
-
208,000.00
120,000.00
100,000.00
8,000.00
Breadth
S.No Description No. Length (m) Height (m) Qty. Unit
(m)
1 Site Office Establishment 1 12 Per month
Dismantling of completely
5
damaged building
Building 1 1 97.50 sq.m
Breadth Height
S.No Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance and Mobilization 1 21.95 13.95 306.20
Soak Pit 1 3.50 3.50 12.25
Total 318.45 Sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Soak Pit 1 4.15 Area 1.55 6.44
Total 162.25 Cu.m
Building Floors
Classroom
Class Room 2 5.70 4.70 0.20 13.23
Corridor 2 5.70 2.20 0.20 5.18
1 4.20 2.20 0.20 1.46
Below Staircase 1 4.20 4.70 0.20 3.74
Below ramp
For Slope 1 1.30 1.36 Area 1.77
For Front wall 3-AB 1 0.50 0.45 0.10 0.02
For Side wall -3B 1 6.80 0.45 0.10 0.31
Total 46.59 Cu.m
2 Concrete Works
2.1 P.C.C.
2.1.1 PCC work (1:3:6)
For Footing
Isolated F1 2 1.70 1.70 0.10 0.58
Combined CF1 2 7.20 2.20 0.10 3.17
Combined CF2 1 6.50 1.80 0.10 1.17
Combined CF3 2 7.20 1.80 0.10 2.59
First Floor
For column 12 0.575 0.45 3.00 7.29
F.F Staircase
Landing beam 1 4.05 0.25 0.43 0.43
Landing Slab 2 1 4.20 2.00 0.21 1.72
Second Floor
For column 12 0.575 0.45 3.00 7.29
S.F Staircase
Landing beam 1 4.05 0.25 0.43 0.43
Landing Slab 3 1 4.20 2.00 0.21 1.72
First flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Second Flight
Waist Slab 1 3.00 2.00 0.21 1.23
Riser 10 2.00 Area= 0.02 0.42
Landing Projection Slab 1 4.05 0.60 0.13 0.32
Top Floor Beam
Primary Beam
Grid 1-2-3 3 15.15 0.30 0.50 6.82
Grid A-B-C-D 4 6.35 0.30 0.50 3.81
Secondary Beam
Grid A1-C1 2 7.20 0.25 0.43 1.53
T.F. Slab
Class room 4 2.73 4.70 0.13 6.40
Corridoor 4 2.73 2.20 0.13 3.00
1 4.20 2.20 0.13 1.16
Cantilever slab 1A-B & 1C-D 2 6.45 1.00 0.13 1.68
Grid A & D 2 9.80 1.00 0.13 2.55
Grid 3 1 16.65 1.00 0.13 2.16
Grid3B-C 1 6.50 0.50 0.13 0.42
Lintel Bands, Second floor level
Along grid A,B,C,D 4 4.43 0.23 0.13 0.51
Along grid 1 1 11.10 0.23 0.13 0.32
Along grid 2 1 11.10 0.23 0.13 0.32
Top Floor
For column 6 0.575 0.45 2.60 4.04
Roof Beam
Primary Beam
Along grid 1,2,3 3 4.05 0.30 0.50 1.82
Along grid B & C 2 6.35 0.30 0.50 1.91
Roof Floor Slab 1 9.30 6.30 0.13 7.62
Lintel Bands, Top floor level
Along grid B,C 2.00 6.35 0.23 0.13 0.38
Along grid 1,3 2.00 4.05 0.23 0.13 0.24
Parapet Wall
Sill band 1.00 51.75 0.33 0.10 1.71
Vertical band 35 0.23 0.13 0.8 0.84
Roof Floor
Parapet Wall
Sill band 1.00 29.20 0.33 0.10 0.96
Vertical band 20 0.23 0.13 0.9 0.54
Secondary beam
Grid A1-C1 2 7.20 0.85 12.24
FF Slab
Class room 4 4.70 2.73 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
SF Slab 0.00
Class room 4 4.70 2.73 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
0.00
TF Slab
Class room 4 2.73 4.70 51.23
Corridoor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Cantilever slab 1A-B & 1C-D 2 6.71 1.13 15.16
Grid A & D 2 9.93 1.13 22.44
Grid 3 1 16.65 1.13 18.81
Grid3B-C 1 6.76 0.63 4.26
Top Floor
For column 6 2.05 2.60 31.98
-14 0.30 0.50
Deduction on beam and column junction -2.10
Roof Beam
Primary Beam
Along grid 1,2,3 3 4.05 1.04 12.64
Along grid B & C 2 6.35 1.04 13.21
Bench 0.00
Bench Top Slab 2 5.80 0.125 1.45
3 Brick work
3.2 Foundation upto plinth
Grid 1,2,3 3 15.15 0.23 0.40 4.18
Grid A,B,C,D,E 4 7.60 0.23 0.40 2.80
Ground floor
Along grid A,B,C,D/(1-2) 4 4.43 0.23 2.35 9.57
Along grid 1A-B &C-D 2 5.55 0.23 2.35 6.00
Grid 1 B-C 1 4.05 0.23 2 1.86
Along grid 2 1 11.10 0.23 2.35 6.00
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Class Room 2 5.78 4.75 54.86
Corridor 1 16.80 2.53 42.42
1 0.42 4.20 1.76
Below Staircase 1 4.52 4.20 18.98
Ramp 1 6.52 1.30 8.48
Exterior Steps 1 14.40 1.05 15.12
3 0.60 0.50 0.90
Staircase Tread 18 0.3 2.00 10.80
Riser 20 0.15 2.00 6.00
Staircase landing 1 2.10 2.00 4.20
1 2.10 2.00 4.20
Pavement along Drain 1 16.95 1.01 17.12
Roof plan
Roof Floor Slab 1 5.3 8.3 43.99
Total 605.69 sq.m
Roof Plan
Along Wall 1 27.20 27.20
Total 296.43 r.m
7 PLASTER/PAINTING WORKS
7.1 Cement Plaster Works
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Classroom 2.00 21.07 2.91 122.63
Staircase 1.00 13.46 2.91 39.17
Store Below Landing 2.00 1.57 Area 3.13
Deductions
W1 -8.00 1.10 1.75 -7.70
W3 -1.00 1.50 0.33 -0.24
D1 -4.00 1.10 2.50 -5.50
D3 -2.00 1.00 1.55 -1.55
First Floor
Classroom 2.00 21.05 2.87 120.83
Staircase 1.00 13.38 2.87 38.39
In partition wall- Computer lab 2.00 3.38 1.20 8.10
Column
Grid 2A,2D 2.00 0.61 2.77 3.39
Grid 2B,2C 2.00 1.27 2.77 7.01
Deductions
W1 -8.00 1.10 1.75 -7.70
W2 -1.00 1.50 1.08 -0.81
D1 -4.00 1.10 2.50 -5.50
Second Floor
Classroom 2.00 21.05 2.87 120.83
Staircase 1.00 13.38 2.87 38.39
Column
Grid 2A,2D 2.00 0.61 2.77 3.39
Grid 2B,2C 2.00 1.27 2.77 7.01
Deductions
W1 -8.00 1.10 1.75 -7.70
W2 -1.00 1.50 1.08 -0.81
D1 -4.00 1.10 2.50 -5.50
Top Floor
Along Grid 1&3/ B-C 2.00 4.05 2.45 9.92
Along Grid B&C/ 1-3 2.00 7.70 2.45 18.87
Deductions
W2 -1.00 1.50 1.08 -0.81
D2 -2.00 1.10 2.10 -2.31
Total 514.13 sq.m
7.1.2 Internal Plaster on Ceiling (1:4)
Ground floor
ECD 2 2.73 4.70 25.62
Classroom 1 2 2.73 4.70 25.62
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Secondary Beam
Along Grid A1-C1 2 6.90 0.89 12.28
Below staircase
Waist slab 2 3.00 2.00 12.00
Landing 1 1.93 4.20 8.09
First floor
Computer lab 2 2.73 4.70 25.62
Second floor
Classroom 3 2 2.73 4.70 25.62
Classroom 4 2 2.73 4.70 25.62
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Slab Extension
Grid A & D 2 9.80 1.00 19.60
Grid 1 2 6.30 1.00 12.60
Grid 3 2 5.50 1.00 11.00
1 6.80 1.50 10.20
Secondary Beam 0.00
Along Grid A1-C1 2 6.90 0.89 12.28
Below staircase
Waist slab 2 3.00 2.00 12.00
Landing 1 1.93 4.20 8.09
Top floor
Grid 1-2 1 4.7 4.2 19.74
Corridor 1 4.2 2.2 9.24
Slab Extension 1 28.2 0.75 21.15
Total 453.98 sq.m
7.1.3 On Outer Wall (1:6)
7.1.3.1 External Plaster
Below Plinth
Grid A & D 2 5.73 0.45 5.15
Grid 1 1 17.78 0.45 8.00
Column plaster
Ground floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions
Junctions -32 0.3 0.50 -4.80
First floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions
Junctions -32 0.3 0.50 -4.80
Second floor
Grid 3 4 3 2.05 24.6
Grid 2 4 3 1.24 14.85
Grid 1B,1C 2 3 0.73 4.35
Grid 1A,1D 2 3 1.24 7.43
Deductions
Top floor
Grid 1 & 3 4 2.6 1.24 12.87
Grid 2 2 2.6 0.73 3.77
Deductions
Junctions -14 0.3 0.50 -2.10
Beam plaster
Ground floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00
Edge beam 1 7.95 1 7.95
Landing beam 1 1 4.05 0.45 1.80
First floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00
Second floor
Grid 1 1 15.15 0.41 6.14
Grid 2 1 11.1 0.41 4.50
1 4.05 1.04 4.21
Grid 3 1 15.15 1.17 17.73
Grid A & D 2 4.425 0.72 6.37
Corridor Beam
Grid A & D 2 1.925 1.17 4.50
Grid B & C 2 1.925 1.04 4.00
Top floor
Grid 1 & 2 2 4.05 0.5075 4.11
Grid B & C 2 6.35 0.515 6.54
First floor
Grid 1 1 15.15 2.5 37.88
Grid 2 1 11.1 2.5 27.75
Grid A & D 2 4.425 2.5 22.125
Second floor
Grid 1 1 15.15 2.5 37.88
Grid 2 1 11.1 2.5 27.75
Top floor
Grid 1 & 2 2 4.05 2.1 17.01
Grid B & C 2 4.425 2.1 18.585
Parapet Wall
Top Floor 2 22.25 2.15 95.68
1 7.30 3.35 24.455
Roof 1 29.20 2.35 68.62
Deduction
W1 -24 1.1 1.125 -29.70
W2 -3 1.5 1.075 -4.84
W3 -1 1.5 0.325 -0.49
V1 -24 1.1 0.55 -14.52
D1 -12 1.1 2.5 -33.00
D2 -2 1.1 1.9 -4.18
Total 730.59 sq.m
7.2 PAINTING WORKS
7.2.1 DISTEMPER PAINT
As per Internal plaster on wall 514.13
As per internal plaster on ceiling 453.98
Total 968.11 sq.m
8 MISCELLANOUS
8.3 Railing
Total Total Wt
Staircase Railing Length Kg/m
Length (Kgs)
Horizontal ISNB 40M 1 21.84 21.84 3.56 77.75
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 21.84 87.36 0.85 74.26
Horizontal 25mm Square Pipe (Top 8.50
Floor) 4 2.125 0.85 7.23
Balcony Railing
First Floor
Second Floor
Horizontal ISNB 40M 1 19 19.00 3.56 67.64
Horizontal ISNB 32M 2 19 38.00 3.10 117.80
Vertical ISNB 32M 15 1.14 17.10 3.10 53.01
Inclined ISNB 32M 15 0.134 2.01 3.10 6.23
Vertical 25mm Square Pipe 128 0.82 104.96 0.85 89.22
Parapet Wall
ISNB 40M(Horizontal Bars) 2 22.96 45.92 3.56 163.48
ISNB 32M(Horizontal Bars) 2 22.96 45.92 3.10 142.35
Vertical ISNB 32M 30 0.40 12.00 3.10 37.20
Inclined ISNB 32M 30 0.134 4.02 3.10 12.46
Vertical 25mm Square Pipe 332 0.30 99.60 0.85 84.66
Base plate 131 0.00009375 0.01 7850 96.41
12 mm dia. Anchor Bolt, Nut 524 0.13 68.12
Total 1,508.41 k.g
B Column
1 All Grid 12 20mm ɸ 20mm ɸ
Main Bar 20 2 7.11 170.64 2.47 421.48
20 2 4.10 98.40 2.47 243.05
16 4 6.85 328.80 1.59 522.79
16 4 3.85 184.80 1.59 293.83 6.30 3.30
0.15 0.15
0.65 0.65
16mm ɸ 16mm ɸ
6.2
3.2
0.15 0.15
0.5 0.5
0.37
0.18 0.1
Bottom Bar (T/O) 3 12 2 9.24 55.44 0.89 49.34 0.485 8.75 8.75 0.485
12 2 9.24 55.44 0.89 49.34
12 1 11.25 33.75 0.89 30.04
12 2 3.98 23.88 0.89 21.25 11.25
0.485 0.485
3.49 3.49
2 Grid A,B,C,D 4
Top bar (T/O) 12 3 8.65 103.80 0.89 92.38 7.88
Bottom bar (T/O) 12 3 8.65 103.80 0.89 92.38 0.385 0.385
Stirrups 0.25
Grid 1,2,3 3 10 209 1.20 752.40 0.62 466.49 0.1
Grid A,B,C,D,E 5 10 65 1.20 390.00 0.62 241.80 0.25
E GF to FF Column
1 All Grid 12
Main Bar 20 2 7.20 172.80 2.47 426.82 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6
1.2 0.96
0.345
0.158 0.1
5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15
0.46 0.15
0.22
0.15
0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
12 2 3.98 23.88 0.89 21.25 11.25
12 1 11.25 33.75 0.89 30.04 0.485 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33 3.49 3.49
0.765 0.765
8.86 8.86
4 Grid A 1
Top bar 20 2 9.78 19.56 2.47 48.31 7.89
16 1 9.22 9.22 1.59 14.66 0.945 0.945
Bottom bar 20 2 9.78 19.56 2.47 48.31
16 1 9.22 9.22 1.59 14.66 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54
5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54
6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54
7 Grid D 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 20 2 9.78 19.56 2.47 48.31 0.665 7.89 0.665
16 1 9.22 9.22 1.59 14.66
Stirupps 10 58 1.60 92.80 0.62 57.54
Extra bar
For short span 2.175
Grid 1 1 16 2 3.04 6.08 1.59 9.67 0.765 0.1
16 2 3.70 7.40 1.59 11.77
3.5
0.1 0.1
Grid 2 1 16 2 3.80 7.60 1.59 12.08
16 1 2.45 2.45 1.59 3.90 0.1 3.60 0.1
0.1 2.25 0.1
0.96 0.96
Bent up bar in primary
H and secondary beam 16 12 3.01 36.12 1.59 57.43
junction 0.42
0.25
I Landing Beam(GF to FF) 4.85
Top bar 16 3 6.35 19.05 1.59 30.2895 0.75 0.75
Bottom bar 16 3 6.35 19.05 1.59 30.2895 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375
0.375 0.55
Long Span 0.085 0.33
A-B 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 0.45 Type A 0.45
Main bar Type B 8 19 7.75 147.21 0.4 58.88 0.085 0.085
6.2
C-D 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 Type B
Main bar Type B 8 19 7.75 147.25 0.4 58.90 0.45 1.35 0.45
0.085 0.33
A-D Grid (2-3) 1
Main bar
Main Bar Type A 8 13 18.62 242.06 0.4 96.82
Main bar Type B 8 13 19.02 247.26 0.4 98.90
Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 2 8 12 8.5 204.00 0.4 81.60
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid A1,C1 2 8 14 2.16 60.48 0.4 24.19 0.055 2.05 0.055
Along Grid 2( A-B and C-D) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (B-C) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055
Edge Beam
Along short Span 2
Top Bar 12 2 2.5 10 0.89 8.90 0.75 1 0.75
Bottom Bar 12 2 2.2 8.8 0.89 7.83
K FF to SF Column
1 All Grid 12
Main Bar 20 2 7.20 172.80 2.47 426.82 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6
0.345
0.158 0.1
5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15
0.12
0.15
0.46 0.15
0.22
0.15
0.765 0.765
Bottom Bar 16 2 9.64 57.84 1.59 91.97 8.875 8.875
16 2 9.64 57.84 1.59 91.97
12 2 3.98 23.85 0.89 21.23 11.25
12 1 11.30 33.90 0.89 30.17 0.485 0.485
Stirupps 10 209 1.60 334.40 0.62 207.33 3.49 3.49
0.765 0.765
8.86 8.86
4 Grid A 1
Top bar 20 2 9.80 19.60 2.47 48.41 7.89
16 1 9.22 9.22 1.59 14.66 0.945 0.945
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 58 1.60 92.80 0.62 57.54 0.665 7.89 0.665
5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54
6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 58 1.60 92.80 0.62 57.54
7 Grid D 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 0.00 0.00 1.59 0.00
Bottom bar 20 2 9.78 19.56 2.47 48.31 0.665 7.89 0.665
16 1 9.22 9.22 1.59 14.66
Stirupps 10 58 1.60 92.80 0.62 57.54
Secondary beam
1 Grid A1,C1 2 7.89
Top bar 16 3 9.22 55.32 1.59 263.88 0.665 0.665
Bottom bar 16 3 9.22 55.32 1.59 263.88
Stirupps 10 58 1.35 78.30 0.62 145.64 0.665 7.89 0.665
Extra bar
For short span 2.175
Grid 1 1 16 2 3.04 6.08 1.59 9.67 0.765 0.1
16 2 3.70 7.40 1.59 11.77
3.5
0.1 0.1
Grid 2 1 16 2 3.80 7.60 1.59 12.08
16 1 2.45 2.45 1.59 3.90 0.1 3.60 0.1
0.1 2.25 0.1
0.96 0.96
Bent up bar in primary
N and secondary beam 16 12 3.01 36.12 1.59 57.43
junction 0.42
0.25
O Landing Beam(FF to SF) 4.85
Top bar 16 3 6.35 19.05 1.59 30.2895 0.75 0.75
Bottom bar 16 3 6.35 19.05 1.59 30.2895 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375
0.375 0.55
Long Span 0.085 0.33
A-B 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25 0.45 Type A 0.45
Main bar Type B 8 19 7.75 147.21 0.4 58.88 0.085 0.085
6.2
C-D 1
Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 2 8 12 8.5 204.00 0.4 81.60
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid A1,C1 2 8 14 2.16 60.48 0.4 24.19 0.055 2.05 0.055
Along Grid 2( A-B and C-D) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (B-C) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055
Q SF to TF Column
All Grid 12
Main Bar 20 2 5.50 132.00 2.47 326.04 20mmɸ 16mmɸ
16 4 5.30 254.40 1.59 404.50 4.3 4.34
1.2 0.96
0.345
0.158 0.1
5 Nosing ties
First type 2 8 25 0.68 34.20 0.40 13.68
Second type 2 8 5 0.88 8.82 0.40 3.53 0.62 0.15
Third type 2 8 10 0.98 19.62 0.40 7.85 0.12
Forth type 2 8 5 0.78 7.81 0.40 3.12 0.15
Fifth type 2 8 5 0.67 6.74 0.40 2.70
0.46 0.15
0.12
0.15
0.46 0.15
0.22
0.15
0.485 0.485
Bottom Bar 1 16 2 4.40 8.80 1.59 13.99 8.75 8.75
1 16 2 11.46 22.92 1.59 36.44
1 16 2 4.40 8.80 1.59 13.99 11.46
1 12 2 9.24 18.47 0.89 16.44 0.765 0.765
Stirupps 1 10 209 1.60 334.40 0.62 207.33 3.49 3.49
4 Grid A
Top bar 1 16 3 9.21 27.63 1.59 43.93 7.89
Bottom bar 1 16 3 9.21 27.63 1.59 43.93 0.665 0.665
Stirupps 1 10 57 1.60 91.60 0.62 56.79
0.665 7.89 0.665
5 Grid B 7.89
Top bar 1 20 2 9.78 19.56 2.47 48.31 0.945 0.945
1 16 1 9.21 9.21 1.59 14.64
Bottom bar 1 16 3 9.21 27.63 1.59 43.93 0.665 7.89 0.665
Stirupps 1 10 57 1.60 91.60 0.62 56.79
6 Grid C 7.89
Top bar 1 16 3 9.21 27.63 1.59 43.93 0.665 0.665
7 Grid D 7.89
Top bar 1 16 2 9.21 18.42 1.59 29.29 0.665 0.665
1 12 1 8.86 8.86 0.89 7.89
Bottom bar 1 12 3 8.86 26.58 0.89 23.66 0.485 7.89 0.485
Secondary beam
1 Grid A1,C1 2 7.75
Top bar 2 16 3 9.08 54.48 1.59 259.87 0.665 0.665
Bottom bar 2 16 3 9.08 54.48 1.59 259.87
Stirupps 2 10 59 1.35 159.30 0.62 296.30 0.665 7.75 0.665
0.09 0.09
11.91 7.39
Type D
2 Distribution Bar
Along X axis 6.3
Type A (Grid 1-2) 2 8 20 6.3 252.00 0.4 100.80 Type A
Type B (Grid 1-2) 1 8 10 12 120.00 0.4 48.00
1 8 10 5.3 53.00 0.4 21.20 5.3
12
Type B
Along Y axis
Type A (Grid A-B & C-D) 2 8 21 7.8 327.60 0.4 131.04 7.8
Type B (Grid A-B & C-D) 1 8 17 2.8 47.60 0.4 19.04 Type A
2.8
Type B
3 Negative bar
Grid 1 2 8 9 2.9 52.20 0.4 20.88 0.05 2.8 0.05
Grid 2 2 8 9 2.65 47.70 0.4 19.08
1 8 6 1.25 7.50 0.4 3.00 0.05 2.55 0.05
Grid 3 2 8 9 2.15 38.70 0.4 15.48
1 8 6 2.65 15.90 0.4 6.36 0.05 1.15 0.05
W Column
TF to RF Column
All Grid 12
Main Bar 20 2 4.00 96.00 2.47 237.12 20mmɸ 16mmɸ
16 4 3.76 180.48 1.59 286.96 2.8 2.8
1.2 0.96
0.37
0.18 0.1
2 For Grid 2
Top bar 1 16 2 6.29 12.58 1.59 20.00 4.87
1 12 1 5.77 5.77 0.89 5.14 0.71 0.71
3 For Grid 3
Top bar 1 16 2 6.40 12.80 1.59 20.35 4.87
1 12 1 5.84 5.84 0.89 5.20 0.765 0.765
4 Grid B 7.89
Top bar 1 16 2 9.21 18.42 1.59 29.29 0.665 0.665
1 12 1 8.86 8.86 0.89 7.89
Bottom bar 1 16 2 9.21 18.42 1.59 29.29 0.485 7.89 0.485
1 12 1 8.86 8.86 0.89 7.89
5 Grid C 7.99
Top bar 1 16 2 9.20 18.40 1.59 29.26 0.6 0.6
1 12 1 8.89 8.89 0.89 7.91
Bottom bar 1 16 2 9.20 18.40 1.59 29.26 0.45 7.99 0.45
1 12 1 8.89 8.89 0.89 7.91
7.8
Cantilever Bars
Type A (Along X-axis)
Top Bar 1 8 5 6.48 32.40 0.4 12.96 0.09 6.3 0.09
Bottom Bar 1 8 5 6.48 32.40 0.4 12.96 Type A
Type B (Along Y-axis)
Top Bar 1 8 5 11.98 59.90 0.4 23.96 0.09 11.8 0.09
Bottom Bar 1 8 5 11.98 59.90 0.4 23.96 Type B
Negative Bars
Grid 1-2 2.65
Type A 1 8 10 2.65 26.50 0.4 26.50
Grid 3 Type A
Type B 1 8 5 1.9 9.50 0.4 9.50
1.9
Grid B & C 1 8 16 2.5 40.00 0.4 40.00 Type B
2.5
Stirups 0.3
Grid 1 1 8 175 0.3 52.50 0.4 21.00
Grid 2 1 8 148 0.3 44.40 0.4 17.76
Grid A,B , C & D 4 8 59 0.3 70.80 0.4 28.32
Parapet Wall
Top floor 1 10 2 57.45 114.90 0.62 71.24
Stirrups 1 8 343 0.3 102.90 0.4 41.16
Roof floor 1 10 2 33.8 67.60 0.62 41.91
Stirrups 1 8 202 0.3 60.60 0.4 24.24
II Vertical Bands
10.1 First Floor 0.075
Grid 2 8 10 4 0.83 26.56 0.62 16.47
8 10 2 2.5 40.00 0.62 24.80
Stirrups 8 8 18 0.3 43.20 0.4 17.28 0.6
0.3
10.2 Second Floor 2.5
Grid 2 8 10 4 0.83 26.56 0.62 16.47
8 10 2 2.5 40.00 0.62 24.80
Stirrups 8 8 18 0.3 43.20 0.4 17.28 0.6
2 CONCRETE WORKS
P.C.C For R.C.C. Works
R.C.C Works M20
Along the water trough
1 1.83 0.500 0.100 0.09
1 1.92 0.500 0.100 0.10
3 0.58 0.300 0.100 0.05
I Soak Pit
RCC slab 1 2.27 Area 0.13 0.28
Total 0.53 cu.m
Steel Reinforcement
160 KG Per cu.m 84.80
Total 84.80 Kg
0.08 Tons
Formworks
Along the water trough 2 3.75 0.875 6.56
6 0.58 0.300 1.04
For Soak Pit
RCC slab
Base Area 1 1.13 1.13
Along Sides 1 5.34 0.15 0.80
side formwork for void and
2 2.44 0.15
Removable Cover 0.73
Total 10.26 sq.m
3 BRICK WORKS
Full Brick (230 mm) Works (1:4c/s)
Below Water Trough 1 0.58 0.23 0.30 0.04
1 0.58 0.23 0.45 0.06
Soak Pit Brick work 1 0.20 0.50 0.10
Total 0.20 cu.m
Pump Shed
1 1 1.00
Total 1.00 Nos.
Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 20 20 20 60.00 r.m
copper conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1 1 1 3.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 10.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 15.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 30.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3 12 11 11 2 39.00 pts.
3.2 Two Way Light Point 1 1 1 3.00 pts.
3.3 Ceiling Fan Point 4 4.00 pts.
4 6A Universal Pin Light Power Socket Wiring 4 20 4 28.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 4 20 4 28.00 nos.
6 Wall Fan 8 8 8 24.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type 8.00 8.00 8.00 24.00 no.
7.2 12 W LED Surface Mounted Cylindrical type 3.00 4.00 4.00 2.00 13.00 no.
7.3 LED Wall Light 1.00 1.00 no.
8 Pull Box
Junction Box At External Post Top Light 1 1 1 3.00 no.
9 External Post Top Light Pole 3 3.00 nos.
10 Post Top External Light Fixtures 3 3.00 nos.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3.00 no.
11.2 Earthing Bar 3 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 65 65.00 r.m
12.3.2 12 SWG Cu wire 20.5 20.50 r.m
13 Earth Test link 1 1.00 nos.
14 Lightning Arrester 1 1.00 nos.
C Solar PV System
1 Solar PV Panel 8 8.00 nos.
2 Tubular Deep Cycle Battery 4 4.00 nos.
3 Hybrid Inverter 1 1.00 no.
D Fire Extinguisher
5.0kg Size ABC Stored Pressure Type Fire
1 1 1.00 nos.
Extinguisher
4 Boulder Soling
For Concrete Pavement
Infront of 3-6C(XS)-A 1 6.75 1.50 0.15 1.52
1 13.50 2.50 0.15 5.06
Infront of existing toilet 1 6.00 5.00 0.15 4.50
Gate area 1 6.00 9.00 0.15 8.10
Way from Gate to Bldg 1 7.00 2.00 0.15 2.10
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m
17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m
20 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
21 Metal Railing
Total Total Wt.
Staircase Railing Length Kg/m
Length (kg)
Vertical ISNB 40M 12 1 12.00 3.56 42.72
Horizontal ISNB 40M 2 14.85 29.70 3.56 105.73
Horizontal 25mm Square Pipe 4 14.85 59.40 0.85 50.49
Total 198.94 Kgs
2 Earthwork in excavation
2.1 For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.
3 Earthback Filling
Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.
4 Boulder soling
4.1 Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.
7 Silica Admixture
10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg
8 Form works
8.1 For Base Slab 1 12.9 0.18 2.26
8.2 For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23
Short Wall 2 3.10 1.83 11.32
Inside wall
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.5296
3.02 3.02
0.3 0.3
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05