The engineering department conducted a risk assessment of various project activities. The top risks identified were:
1) Insufficient compaction during base course preparation could result in cracks in the pavement.
2) Lack of signage and flagmen during construction could lead to traffic issues and accidents.
3) Not providing proper PPE and first aid kits could result in safety issues and DOLE violations.
The department plans to maintain existing risk controls and monitoring for all activities.
The engineering department conducted a risk assessment of various project activities. The top risks identified were:
1) Insufficient compaction during base course preparation could result in cracks in the pavement.
2) Lack of signage and flagmen during construction could lead to traffic issues and accidents.
3) Not providing proper PPE and first aid kits could result in safety issues and DOLE violations.
The department plans to maintain existing risk controls and monitoring for all activities.
The engineering department conducted a risk assessment of various project activities. The top risks identified were:
1) Insufficient compaction during base course preparation could result in cracks in the pavement.
2) Lack of signage and flagmen during construction could lead to traffic issues and accidents.
3) Not providing proper PPE and first aid kits could result in safety issues and DOLE violations.
The department plans to maintain existing risk controls and monitoring for all activities.
EXISTING # ACTIVITIES RISKS IMPACT PRIORITY REACTION PLANS STATUS CONTROL SEV OCC DET NUMBER 1.Deploy field 1.Deteriorated Engineer for 1.insufficient outcome of supervision 2 1 2 4 Base course compaction PCCP (Cracks) 2.Proper 1 preparation/Sub- procedure 1.Maintain existing control grace preparation 2.Critical base 2.Risk using sufficient 2 1 2 4 Equipment equipment & base materials 1.Cause of 1.Providing of 1.No signboards/ 3 1 1 3 Accidents Signboards Signage 1.Maintain existing control 2 Traffic Management 2.Traffic 2.Assigning 2 1 1 2 2.No flagman commotion Flagman 1.Assigning 1.Cause of safety officer to accident/DOLE 1 1 1 1 1.Maintain Existing 1.No PPE supervise Construction Safety & violation Control 3 2.Providing of Health 2.No medicine kit first 1 1 1 1 2.Prone to aider/Medicine danger kit
1.Maintaining 1.Maintain with
1.Low Mixture the mixture 3 3 1 9 supervision Pouring of Portland 1.Scaling design 4 cement concrete 2.Curing did not 2.Meeting the 2.Maintain existing control pavement meet 2.Cracks 3 3 1 9 curing period 1.Referring to 1.Right of way 1.Delay of DPWH to Road Widening (Road project 5 conduct 2 2 2 8 1.Maintain Existing Excavation) 2.complain from meeting to the Control land owner 2.no approval owner
2.May cause 3.Assigning of
1.Location of 6 Embankment accident or helper on the 3 2 1 6 1.Maintain existing control embankment danger site location
1.May cause 1.Having an
1.wrong 2 2 2 8 accident installer with 1.Maintain with Formworks/ installation 7 certificate monitoring the existing Scaffolding 2.Subjected to 2.Strictly 2 3 1 6 control 2.NO PPE DOLE violation wearing a PPE
1.May cause 1.Providing
1.No PPE accident orientation & 1 3 1 3 training 1.Maintain existing control 8 Clearing and Grubbing 2.Lack of 2.Prone to 2.Providing tools/Minor tools danger adequate 1 3 1 3 supervision