Government Ofthe Republic of The Union of Myanmar: Ministry Construction
Government Ofthe Republic of The Union of Myanmar: Ministry Construction
MINISTRY OF CONSTRUCTION
PUBLIC WORKS
ANALYSIS OF RATES
FOR
BRIDGE WORKS
BRIDGES
SUB-HEADS
1O
. Foundation Work
6.0 Survey
Miscellaneous Notes
1
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work.
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
X IX. BRIDGES
Foundation Works
1 Labour For Driving (250 mm) Diameter Timber
Piles inordinary Soil(With 500 kg drop hammer
from pulley winch and local trestle and manually
operated). Penetration average 6 m.
Labour
Foreman Man-Day 0.3 - Cost of Timber piles
Carpenter (1st Grade) Man-Day 0.5 according to varying dia;
Carpenter (2nd Grade) Man-Day 0.5 with all necessary fittings
Worker Man-Day 3 is to be included in the
Plants main estimate.
Pile driving frame (1)No Hour 4
Sundries L.S -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Electric Helper Man-Day 0.5
Operator /Machine Driver Man-Day 0.7
Sundries L.S -
H.S.D litre -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
8. Fitting of Drilling Equipment to dig Bored Pile.
1200rnm 0 , 1500rnm 0 ,1800mm 0,
2500rnm 0. ( For 1 time )
Head Worker Man-Day 2
Worker Man-Day 7
Operator /Machine Driver Man-Day 0.8
Sundries L.S -
H.S.D litre -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
12. Drilling of 800 rnm 0 mini Bored Pile.
(Water, Ordinary Soil) ( For 1 m )
Head Worker Man-Day 0.8
Foreman Man-Day 0.6
Worker Man-Day 2.5
Operator /Machine Driver Man-Day 0.4
Water Pump Helper Man-Day 0.4
Sundries L. S -
H.S.D litre -
Standard Data for Working Out Rates Per Unit Quantiry of Items of Work-contd.
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Water Pump Helper Man-Day 0.7
Sundries L.S -
H.S.D litre -
Well Foundation
Iigging and sinking of 1200mrn0 spun pipe
o get specified depth including removing soil
md water pumping. (Ground, Ordinary soil)
For 1 m)
Worker
Carpenter
Head Worker
Operator
Steel Fixer
Sundries
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Operator Man-Day 1.6
Steel Fixer Man-Day 1.2
Sundries L.S -
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Rigger Man-Day 21
Carpenter Man-Day 6
Sundries L.S -
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
Mechanic
Worker
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
15
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
Sr
No.
- I Particulars of Materials and Labour
1 58. 1~ i x i lowering
n~ bar, jacking beam, hanger jack
Erector Man-Day 5
Worker Man-Day 35
Sundries L.S -
16
Standard Data for Working Out Rates Per Unit Quantity ofItems of Work-contd.
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
59. Side shifting P.C Girder from casting position
to Launghing position distance l m . (1 time)
Erector Man-Day 5
Worker Man-Day 20
Sundries L.S -
-
Sr
Particulars of Materials and Labour Unit Remarks
Jo.
-
55. Levelling and carving on the Cross Beam for
fitting P.C Girder,carving 1200mm 0 x 254mm
grouting hole, fitting bearing plate. (1 sheet)
Mason Aan-Daj
Erector Aan-Daj
Worker Am-Daj
Sundries L.S
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd
Sr Quantity Remarks
Particulars of Materials and Labour Unit
No,
Erector Man-Day 2
Sundries L.S -
Steel Truss
79. Labour for Launching of R.S.JS. over bridge
sup ports (Using two pulleys and winch from
the other side) (5No x 13000rnrn x 610mrn x
190mm) at (43.l)kg per RFT.
(Total Weight = 9.3 MTons)
Labour
Bridge Foreman Man-Day 3
20
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
Bridge Foreman
Worker
Sundries
21
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Labour
Bridge Foreman Man-Day 8
Worker Man-Day 80
Tools Required
Bailey Jacks = 2 No - -
Bailey rollers = 7 No - -
One spanner - -
One hammer - -
Sundries L.S -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Labour
Bridge Foreman Man-Day 35
Skilled workers Man-Day 120
Unskilled workers Man-Day 400
Tools Required
4000 Kg hand winch - -
Wire rope (12rnm 0 457m) - -
Wire rope (16rnm 0 457m) - -
Coir rope (25mm 0 152m) - -
Service bolts - -
Double pulley (2)No - -
Single pulley (1)No - -
One Bellow - -
Dollys (2)No - -
90. (a) Installing Bolts & Nuts, Drift Pins & Tigh-
tenning according to the design while erecting
steel truss. (1000 Nos)
Steel Fixer Man-Day 1
Worker Man-Day 4
- Tightening them with & Electric Guns again
before transfering the target place. (1000 Nos)
Steel Fixer Man-Day 1
Head Worker Man-Day 0.5
Worker Man-Day 4
Electric Helper Man-Day 0.5
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
91. Final Tightenning the ready installed Bolts &
Nuts according to theTightenning sequence
( including with checking them whether
standard or not ) (1000 Nos)
Steel Fixer Man-Day 2
Head Worker Man-Day 1
Worker Man-Day 6
Electric Helper Man-Day 1.5
Sundries L. S -
r
Particulars of Materials and Labour Unit Quantity Remarks
0.
(c) Shifting the sleepers within 30m with man
and arranging them Systemtically (not more
than one time. ) (100 Nos)
Carpenter Man-Day 4
Sundries L.S -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
Worker Man-Day 8
Operator /Machine Driver Man-Day 8
Electric Helper Man-Day 8
Sundries L.S -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
110. Taking out and cleaning running cable from
Cable Drum and placing them on timber crib
(For 10 m)
Skilled Man Man-Day 0.1
Head Worker Man-Day 0.1
Worker Man-Day 0.1
Sundries L.S -
15. Fixing 5 Mton winch According Tower Anchor Including timber support
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
131. Adjusting and cutting layer of cable to
install Anchor Plate For Stressing.
(For 1 No of cable)
Skilled Man Man-Day 0.1
Sundries L.S -
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
138. Laying systematically small Transon walk way
and Checking, Laying Decking Beam
(For 1000 Kg)
Skilled Man Man-Day 9.5
Sundries L.S -
143. Fixing Bearing Bolt to Bearing Mat and Bailey - Include adjusting bottom
(or)Steel truss Pin to Bearing Mat & Bailey surface of Bearing Mat
(or)Steel truss. (For one Pier) to get specified R.L.
Skilled Man Man-Day 12
Sundries L. S -
Sr Quantity Remarks
Particulars of Materials and Labour Unit
No.
152. Reading and specifying the centre of the Bored
pile when driving stand pipe from control point
by using theodolite.(l Time)
Surveyor Man-Day 0.5
Helper Man-Day 0.5
Man-Day
Quantity
0.3
Remarks
Helper Man-Day 1
I
162. Rechecking position of Pile (or)Cap (or) Shaft (or)
Cross Beam after concreting. (1 Time)
Surveyor Man-Day 0.5
Helper Man-Day 0.5
Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.
Sr Remarks
Particulars of Materials and Labour Unit Quantity
No.
(b) Rechecking position.
Surveyor Man-Day 3
Helper Man-Day 3
Sr
Particulars of Materials and Labour Unit Quantitj Remarks
No.
174. Surveying and specifLing level for installation of
Road Curb and Hand Rail. (1 Time)
Surveyor Man-Day 0.5
Helper Man-Day 0.5
Srandard Data for Working Out Rates Per Unit Quantity ofltems of Work-contd
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
(b) Rechecking alignment (Center Line)of anywork after
working. (1 Time)
Surveyor Man-Day 0.5
Helper Man-Day 0.5
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
185. Triangulation Net Survey
(a) Basic Line Measurement (1 Time)
Surveyor Man-Day 3
Helper Man-Day 4.5
Sr
Particulars of Materials and Labour Unit Quantity Remarks
No.
MISCELLANEOUS NOTES