AU480 Inspection Checklist

Customer : Counter :
Inspection Date :  Type :
Serial No. : Inspector :

Sampler (SMP) Cuvette wash unit (FB01)


Item Contents 6M 12M Remarks Item Contents 6M 12M Remarks
Feed plate and side Position Confirmation
Cleaning
walls
Feed plate transfer Mix unit (FC01)
Cleaning, lubrication Photolube
surface Item Contents 6M 12M Remarks
Rack transfer surface Cleaning Position Confirmation
Barcode reader Cleaning
Feed plate tension Confirmation Reagent transfer unit (FD01)
Item Contents 6M 12M Remarks
Analyzer main unit (AA) Liner, Spline shafts Cleaning, lubrication AFB grease
Item Contents 6M 12M Remarks CH shaft Cleaning, lubrication AFC grease
Power supply, fan Cleaning Position Confirmation
Confirmation, Cleaning,
Wash tubing
Replace Dispenser (SA01/02)
Confirmation, Cleaning, Item Contents 6M 12M Remarks
Waste water tubing Guide unit Cleaning, lubrication Losoid grease
Replace
Cooling fin and fan Cleaning
Incubator unit (GA01)
Degasser Cleaning Item Contents 6M 12M Remarks
Float switches Confirmation Coolant Volume Confirmation, refill
Waste pump, valve, Replace US only: Cuvettes, Cleaning
PM Kit 1Y Cuvette Wheel
diaphragm, O ring (Every 1 year)
Photocal Confirmation
Vacuum pump, valve, Replace
PM Kit 2Y
diaphragm, (Every 2 years) DPR Unit
Replace Item Contents 6M 12M Remarks
Degasser PM Kit 3Y 2 Hard disk working Confirmation
(Every 3 years)
Battery Replace Upon request
Reagent refrigerator unit (DA01)
Item Contents 6M 12M Remarks ISE Unit (Option)
Reagent barcode Cleaning Item Contents 6M 12M Remarks
reader Reagent storage Cleaning
ID reading glass Cleaning compartment
window Inlet of the electrode Cleaning
Inside compartment Cleaning block
REF block Cleaning
STAT table unit (DC01) Draining tubing Cleaning
Item Contents 6M 12M Remarks Drain well and drain Cleaning
Sample barcode reader Cleaning joint
ID reading glass Cleaning Joints Cleaning
window ISE calibration Confirmation
Inside compartment Cleaning Static Sensor Confirmation

Sample transfer unit (FA01) Overall


Item Contents 6M 12M Remarks Item Contents 6M 12M Remarks
Liner, Spline shafts Cleaning, lubrication AFB grease Alarm check Confirmation
CH shaft Cleaning, lubrication AFC grease Overall Performances Confirmation Include : Rack transfer
Position Confirmation Analysis Data Confirmation

Replace: X㸪Clean: C, Adjust: A, Lubricate: O, Repair :S, OK: V

Comments :
Field Service Representative : Date :