Professional Documents
Culture Documents
A
Accumulator
capacity subsea system 39 40
capacity surface system 37 38 39
pre-charge pressure 40 41
Annular capacity
between casing and multiple
between casing or hole and drill pipe,
tubing, or casing 12 13 14
strings of tubing 14 15 16 17 18
Annular velocity
critical 173 174
determine 9 10 11
metric 11
pump output required 11
SPM required 12
B
Bit nozzle selection 165 166 167 168 169
Bottomhole assembly, length necessary
for a desired weight on bit 42 43 44
Buoyancy factor 20 42 43 44
This page has been reformatted by Knovel to provide easier navigation. 221
222
Index terms Links
C
Capacity
annular 12 13 14 15 16
inside 16 17 18 25 26
27
Cementing calculations
additive calculations 47 48 49 50
balanced cement plug 61 62 63 64
common cement additives 51 52 53
differential pressure 65 66
number of feet to be cemented 57 58 59 60
sacks required 54 55 56 57
water requirements 48 49 50 51
weighted cement calculations 53 54
Centrifuge, evaluation 99 100 101
Control drilling 19
Cost per foot 28 29
Conversion factors
area 217
circulation rate 217
impact force 217
length 218
mud weight 218
power 218
pressure 218
velocity 219
volume 219
D
“d” exponent 174 175
Density
equivalent circulating 6 7 187 188 189
190
metric 7
Directional drilling
available weight on bit 202
deviation/departure 199 200
dogleg severity 200 201
survey calculations 197 198 199
true vertical depth 202
Displacement, drill collar 25 26
Diverter lines 118
Drill collar, capacity and displacement 212 213
Drill pipe
capacity and displacement 209 210
heavy weight 209
E
Equivalent mud weight 118 119 120
F
Flowrate, minimum for PDC bits 206
Fracture gradient
Ben Eaton method 193 194
Matthews and Kelly method 190 191 192
subsea applications 194 195 196
G
Gas migration 128
K
Kick
maximum pit gain 130 131
maximum pressure when circulating 124 131 132 133 134
135 136
maximum surface pressure 129 130
L
Leak-off test
MASICP 121
maximum allowable mud weight from 7 118 119 120 121
O
Overbalance
loss of 22 23
lost returns 71 72
metric 23 24
S
Slug calculations 33 34 35 36
metric 37
Solids
analysis 91 92 93 94 95
dilution 96
displacement 97
fractions 95 96
generated 18 19
Specific gravity
convert 6
determine 5
Stripping/snubbing
breakover point 139 140
casing pressure increase from stripping
into influx 142
height gain from stripping into influx 141
maximum allowable surface pressures 143
maximum surface pressure before
stripping 141
volume of mud to bleed 142
Strokes, to displace 31 32 33
Stuck pipe
determining free point 72 73 74
T
Tank capacity determinations 210 211 214 215 216
Temperature
conversion 29 30
determine 24 25
Ton-mile calculations
coring operations 46
drilling or connection 46
round trip 44 45 46
setting casing 47
short trip 47
V
Volume
annular 32 33 103 104 106
drill string 31 32 103 104 106
W
Washout, depth of 70 71
Weight
calculate lb/ft 25 26