Professional Documents
Culture Documents
S 0
F.S 0
0 A
0 2
1,1,1.1
Critical Path
Develope Scope
T.S Total Slack T.S Total Slack
F.S Free Slack F.S Free Slack
ES B EF ES B EF
LS Duration LF LS Duration LF
WBS Code WBS Code
Wbs Description Wbs Description
Duration Weeks
T.S T.S 0
F.S F.S
START 0 C
0 0 0 0 0
1,1.2.1
Stakeholder
Comunication
T.S 0
F.S 0
0 E
0 0
1.1.4.1
Communications
with wimlont´s
team to develop
activities
Project Name Wilmont`s Drone Case Description Project :
Revision Number 1
Date 11/21/2020
T.S 4
F.S 4
8 G 9
12 1 13
1.2.1.2
Modification of
drone interface
T.S 2
0 F.S 2
8 N 11
2 10 3 13
0 1.3.1.2
Modify power
system to cater for
additional weigh
1,1.2.1
Stakeholder
Comunication
T.S 1
F.S 1
8 O 12
0 9 4 13
0 1.3.1.3
0
Modify flight system
0 to suit current
change
1.1.4.1
Communications
with wimlont´s
team to develop
activities
Project : Drones to delivering
prescriptions of Wilmont´s Gantt
T.S 1 T.S 2
F.S 1 F.S 10
13 H 15 16 J 17
14 2 16 18 1 19
1.2.1.3 1.2.2.1
T.S 1
F.S
13 I 15
14 2 16
1.2.1.4
T.S 0
F.S 0
16 R 19
16 3 19
1.3.3.1
Rent of special
equipment for drone
modification
T.S 0 T.S 0
F.S 0 F.S 0
27 K 29 29 L 30
27 2 29 29 1 30
1.2.3.1 1.2.4.1
T.S 0 T.S 0
F.S 0 F.S 0
23 U 25 25 V 27
23 2 25 25 2 27
1.3.4.3 1.3.4.4
T.S 1 T.S 0
F.S 1 F.S 0
36 AA 38 41 AD 42
37 2 39 41 1 42
1.4.1.2 1.4.3.2
Training on Place
Flying with bagging Pharmaceutical
Modification Testing products , Carry and
Delivery
T.S 0 T.S 0 T.S 0 T.S 0
F.S 0 F.S 0 F.S 0 F.S 0
42 AE 44 44 AF 47 47 AG 50 50 AH 51
42 2 44 44 3 47 47 3 50 50 1 51
1,5,1 1,6,1 1,7,1 1,7,2
FINISH
Project Name Wilmont`s Drone Case
Revision Number 1
Date 11/21/2020
Drones to delivering
prescriptions of Wilmont´s
1 2 3 4 5 6 7
1,1.1 Initiating (Scope , Plannig)
1,1,1.1 Scope Plannig
1,1,1.2 Develope project bases , Scope , Cost estimate , Schedule and
prepare Review
Create workof projects
scope
1,1.2
1.1.2.1 Stakeholders
1.1.2.2 Create stakeholder register. Verify contact information of all
1.1.3 Comunicate and Getting stake holders
in touch with Project Stakeholders
1.1.3.1 Founds
1,1,4 Actitivites related to raising founds not covered by
1.1.4.1 Stakeholders,
Meetings
1.2 Communications with wimlont´s team to develop activities
realated to S Project chedulle
1,2,1 Planning
1.2.1.1 Interface System- Modifications
1.2.1.2 Create interface software
1.2.1.3 Modification of drone interface
1.2.1.4 Create new web-page for interface
1,2.2 Create interface security
1.2.2.1 First Approvals
1.2.3 Meeting to approval Interface Systems
1.2.3.1 Interface Modification
1.2.4 Modifications to Gain general Approval
1.2.4.1 Final Approvals
1.3 Meeting with Dronetech and Wilmont`s to approval interface
1.3.1 system
Construction-Modifications
1.3.1.1 Modification Design
Design drone to include temperature controlled bagging
1.3.1.2 compartment with a bubble
1.3.1.3 Modify power system to cater for additional weigh
1.3.1.4 Modify flight system to suit current change
1,3,2 Modify landing gears
1.3.2.1 Purchase Material
1,3,3 Purchase of construction materials
1.3.3.1 Rent Equipment
1,3,4 Rent of special equipment for drone modification
1.3.4.1 Construction
1.3.4.2 Instalation of Power system
Construction and Instalation of temperature controlled
1.3.4.3 bagging compartment with a bubble
Construction and Instalation of flight system to suit current
1.3.4.4 change
1.3.5 Construction and Instalation landing gears
1.3.5.1 First Approvals
1.3.6 Meeting to approval Interface Systems
1.3.6.1 Interface Modification
1.3.7 Modifications to Gain general Approval
1.3.7.1 Final Approvals
1.4 Meeting with Dronetech and Wilmont`s to approval interface
1,4,1 system
Testing- Quality Control
1.4.1.1 Activities associated with Modificaton of carry bagging testing
including any repairsTesting
Interface or remediation.
1.4.1.2
1.4.2 Flying with bagging Modification Testing
1.4.2.1 Track Testing
1.4.3 Delivering Testing in stores
1.4.3.1 Training
1.4.3.2 Show how to work with Interface and Drones for Wilmont`s
1.5 Training on Place Pharmaceutical products , Carry and Delivery
1,5,1 Painting
1.6 Paint and logos of Wilmont`s Phamaceutics on drones
1,6,1 Delivering
1.7 Activities associated with Delivering in San Francisco
1,7,1 Close Out
1,7,2 Project Review and documentation
Provide feed back to the relevant stakeholders
Key
Wilmont`s Drone Case Critical Path
1 Normal Path
11/21/2020
Weeks
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51