You are on page 1of 21

T.

S 0
F.S 0
0 A
0 2
1,1,1.1

Critical Path
Develope Scope
T.S Total Slack T.S Total Slack
F.S Free Slack F.S Free Slack
ES B EF ES B EF
LS Duration LF LS Duration LF
WBS Code WBS Code
Wbs Description Wbs Description

Duration Weeks

T.S T.S 0
F.S F.S
START 0 C
0 0 0 0 0

1,1.2.1

Stakeholder
Comunication

T.S 0
F.S 0
0 E
0 0

1.1.4.1
Communications
with wimlont´s
team to develop
activities
Project Name Wilmont`s Drone Case Description Project :
Revision Number 1
Date 11/21/2020

0 T.S 0 T.S 0 T.S 0


0 F.S 0 F.S 0 F.S 0
2 2 B 4 4 D 8 8 F 13
2 2 2 4 4 4 8 8 5 13
1,1,1.1 1,1,1.2 1.1.3.1 1.2.1.1

Raising founds not covered Create interface


Develope Scope Create work scope by Stakeholders software

T.S 4
F.S 4
8 G 9
12 1 13
1.2.1.2

Modification of
drone interface

T.S 2
0 F.S 2
8 N 11
2 10 3 13
0 1.3.1.2

Modify power
system to cater for
additional weigh
1,1.2.1

Stakeholder
Comunication
T.S 1
F.S 1
8 O 12
0 9 4 13
0 1.3.1.3
0
Modify flight system
0 to suit current
change
1.1.4.1
Communications
with wimlont´s
team to develop
activities
Project : Drones to delivering
prescriptions of Wilmont´s Gantt

T.S 1 T.S 2
F.S 1 F.S 10
13 H 15 16 J 17
14 2 16 18 1 19
1.2.1.3 1.2.2.1

Create new web- Meeting to approval


page for interface Interface Systems

T.S 1
F.S
13 I 15
14 2 16
1.2.1.4

Create new web-


page for interface

T.S 0 T.S 1 T.S 0 T.S 0


F.S 0 F.S 1 F.S 0 F.S 0
13 P 16 16 Q 18 19 S 20 20 T 23
13 3 16 17 2 19 19 1 20 20 3 23
1.3.1.4 1.3.2.1 1.3.4.1 1.3.4.2

Purchase of Construction and


Modify landing gears construction Instalation of Power Instalation of
system temperature
materials controlled bagging

T.S 0
F.S 0
16 R 19
16 3 19
1.3.3.1

Rent of special
equipment for drone
modification
T.S 0 T.S 0
F.S 0 F.S 0
27 K 29 29 L 30
27 2 29 29 1 30
1.2.3.1 1.2.4.1

Meeting to approval Dronetech and


Interface Systems Wilmont`s approval
interface

T.S 0 T.S 0
F.S 0 F.S 0
23 U 25 25 V 27
23 2 25 25 2 27
1.3.4.3 1.3.4.4

Construction and Construction and


Instalation of flight Instalation landing
system gears
T.S 0 T.S 0 T.S 0 T.S 0
F.S 0 F.S 0 F.S 0 F.S 0
30 M 36 36 Z 39 39 AB 41 41 AC 42
30 6 36 36 3 39 39 2 41 41 1 42
1.3.1.1 1.4.1.1 1.4.2.1 1.4.3.1

Show how to work


Design drone to Delivering Testing in with Interface and
include temperature Interface Testing stores Drones for
and Bagging
Wilmont`s

T.S 1 T.S 0
F.S 1 F.S 0
36 AA 38 41 AD 42
37 2 39 41 1 42
1.4.1.2 1.4.3.2
Training on Place
Flying with bagging Pharmaceutical
Modification Testing products , Carry and
Delivery
T.S 0 T.S 0 T.S 0 T.S 0
F.S 0 F.S 0 F.S 0 F.S 0
42 AE 44 44 AF 47 47 AG 50 50 AH 51
42 2 44 44 3 47 47 3 50 50 1 51
1,5,1 1,6,1 1,7,1 1,7,2

Paint and logos of


Wilmont`s Activities associated Project Review and Provide feed back
Phamaceutics on with Delivering in documentation to the relevant
San Francisco stakeholders
drones
T.S 0
F.S 0
51 51
51 0 51
1,7,2

FINISH
Project Name Wilmont`s Drone Case
Revision Number 1
Date 11/21/2020

Drones to delivering
prescriptions of Wilmont´s
1 2 3 4 5 6 7
1,1.1 Initiating (Scope , Plannig)
1,1,1.1 Scope Plannig
1,1,1.2 Develope project bases , Scope , Cost estimate , Schedule and
prepare Review
Create workof projects
scope
1,1.2
1.1.2.1 Stakeholders
1.1.2.2 Create stakeholder register. Verify contact information of all
1.1.3 Comunicate and Getting stake holders
in touch with Project Stakeholders
1.1.3.1 Founds
1,1,4 Actitivites related to raising founds not covered by
1.1.4.1 Stakeholders,
Meetings
1.2 Communications with wimlont´s team to develop activities
realated to S Project chedulle
1,2,1 Planning
1.2.1.1 Interface System- Modifications
1.2.1.2 Create interface software
1.2.1.3 Modification of drone interface
1.2.1.4 Create new web-page for interface
1,2.2 Create interface security
1.2.2.1 First Approvals
1.2.3 Meeting to approval Interface Systems
1.2.3.1 Interface Modification
1.2.4 Modifications to Gain general Approval
1.2.4.1 Final Approvals
1.3 Meeting with Dronetech and Wilmont`s to approval interface
1.3.1 system
Construction-Modifications
1.3.1.1 Modification Design
Design drone to include temperature controlled bagging
1.3.1.2 compartment with a bubble
1.3.1.3 Modify power system to cater for additional weigh
1.3.1.4 Modify flight system to suit current change
1,3,2 Modify landing gears
1.3.2.1 Purchase Material
1,3,3 Purchase of construction materials
1.3.3.1 Rent Equipment
1,3,4 Rent of special equipment for drone modification
1.3.4.1 Construction
1.3.4.2 Instalation of Power system
Construction and Instalation of temperature controlled
1.3.4.3 bagging compartment with a bubble
Construction and Instalation of flight system to suit current
1.3.4.4 change
1.3.5 Construction and Instalation landing gears
1.3.5.1 First Approvals
1.3.6 Meeting to approval Interface Systems
1.3.6.1 Interface Modification
1.3.7 Modifications to Gain general Approval
1.3.7.1 Final Approvals
1.4 Meeting with Dronetech and Wilmont`s to approval interface
1,4,1 system
Testing- Quality Control
1.4.1.1 Activities associated with Modificaton of carry bagging testing
including any repairsTesting
Interface or remediation.
1.4.1.2
1.4.2 Flying with bagging Modification Testing
1.4.2.1 Track Testing
1.4.3 Delivering Testing in stores
1.4.3.1 Training
1.4.3.2 Show how to work with Interface and Drones for Wilmont`s
1.5 Training on Place Pharmaceutical products , Carry and Delivery

1,5,1 Painting
1.6 Paint and logos of Wilmont`s Phamaceutics on drones
1,6,1 Delivering
1.7 Activities associated with Delivering in San Francisco
1,7,1 Close Out
1,7,2 Project Review and documentation
Provide feed back to the relevant stakeholders
Key
Wilmont`s Drone Case Critical Path
1 Normal Path
11/21/2020

Weeks

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51