NEBOSH International General Certificate in Occupational Health and Safety
NEBOSH International General Certificate in Occupational Health and Safety
candidate:
I declare that the work submitted for this practical application assessment i.e. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Signature;
Name (Print)
Signature
Date
Name (Print)
Signature
Date
NB: This declaration must be completed in full submitted and retained with
the candidate’s script. If this declaration is not submitted the candidate’s
result may be declared void.
APPENDIX 3
INTERNATIONAL GENERAL
CERTIFICATE Assessor’s marking sheet
(2011 specification)
NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)
Date assessed / /
Assessor’s signature
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
Sheet number 1 of 7
Place inspected: NOSHPA Well Head Construction. Date of inspection 01/04 / 2015
Location: Main Gate I-Designated walkways for pedestrians and routs for 1 Week
4- Pedestrians and vehicle collisions vehicle.
at Main gate. M-Separate site entrances for pedestrians and vehicles. 2 Week
Personal Injury equipment L-Good visibility signage and availability of trained
damage. banks man. Ensure provisions of pedestrian crossings. 1 Month
Sheet number 2 of 7
Place inspected: NOSHPA Well Head Construction Date of inspection 01 /04 / 2015
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
Sheet number 3 of 7
Sheet number 4 of 7
Sheet number 5 of 7
Sheet number 6 of 7
Place inspected: NOSHPA Well Head Construction. Date of inspection 01 /04 / 2015
OBSERVATIONS CONTROL MEASURES
Timescale
Hazards and Consequences Immediate, Medium and Longer-Term Actions
Location: Christmas Tree
25- Personnel Falling from height I- Ensure Safe working platform with 5 Hours
Of Christmas Tree and Gas Scrubber proper guard rails and toe boards. Lifelines must be used
platform. on required height.
Physical injury or fatality. M-Ensure that only medically fit personnel are working 5 Days
at height.
L-Safety nets as a collective protection system and fall 2 Weeks
arrest harness for individual protective system should be
provided. Brick guards should also be used for preventing
of personnel from falling.
Location: Gas Scrubbers
26- PPEs including safety harness, L- Ensure of Good quality and well inspected safety 10 Days
shock absorber, lanyard and shackle harness and their accessories. Shackle, shock absorber
are not of approve types. and lanyard should be thoroughly checked by competent
Potential to personal injury, property persons.
damage, substandard safe work I-The entire workers must be trained properly about the 1 Day
procedure and lead to negative HSE use of safety harnesses and supervised properly.
culture.
Sheet number 7 of 7
Location: NOSHPA Well Head Construction (OGDCL PAKISTAN) Date of review: 01/04/2015
For practical assessment of a workplace, an HSE inspection visit to OGDCL Noshpa Well Head was
made. The purpose of visit was to identify hazards and check the compliance of OGDCL HSE
management system and identify any areas of improvement in it.
OGDCL Pakistan has a very successful E&P track record of operations in Pakistan and mission to have
LTI free environment. This report follows an inspection of the Construction site of Noshpa Well Head
Facility and Fabrication yard located 27km from Central Processing Facility (CPF), in District Karak,
KPK to meet the requirements of the NEBOSH IGC 3 practical application.
The premises are occupied by up to 135 to 145 workers including HSE officer, medic, and in charges,
foremen, welders, riggers, fitters, masons, general labours, Excavators, dumpers and Forklift Truck
during day shift only. The size of fabrication yard is about 50X30m and used for welding, cutting,
loading and unloading activities.
The Well Head construction comprises of three main discipline i.e. Civil, Mechanical and E&I. The
construction works were carried out only in day light with some extended hours for special jobs only.
The total area of Well Head was 22500 Sq.m and four major areas were inspected and relevant
hazards and good practices were noted and identified in this report.
APPENDIX 5
NATIONAL GENERAL
CERTIFICATE UNIT NGC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
(2011 specification)
Location: NOSHPA Well Head Construction (OGDCL PAKISTAN) Date of review: 01/04/2015
Executive Summary OGDCL Pakistan has a very successful E&P track record of operations in
Pakistan and mission to have LTI free environment. This report follows an inspection of the
Construction site of NOSHPA Well Head Facility and Fabrication yard located 27km from Central
Processing Facility (CPF), in District Karak, KPK to meet the requirements of the NEBOSH IGC 3
practical application.
The premises are occupied by up to 135-145 workers including HSE officer, medic, and in charges,
foremen, welders, riggers, fitters, masons, general labours, Excavators, dumpers and Forklift Truck
during day shift only. The size of fabrication yard is about 50X30m and used for welding, cutting,
loading and unloading activities.
This report focuses on main four areas of concerns where improvements and implementations are
required which are summarized below.
Conclusions
The most significant hazards identified in this inspection relate to Fire, pedestal/vehicle crossing, fall
from height, ergonomic, accident, personal injuries and property loss. Among all hazards, emergency
response team is highly critical and need urgent attention. Many of the hazards found were as a
result of a lapse in general Health and Safety management and some of them due to personnel
behaviours and implementation of SSW. Majority of the observations could be rectified by simple
training like “tool box talk”, use of calibrated tools, maintenance and vigilant supervisions. This is a
very low cost practice which in turn could improve the Health and Safety of the workforce. However,
few issues needed immediate management commitment by providing training and safe/suitable
equipments to his workers.
Although there were good practices i.e. Dedicated First Aid Team, Good Housekeeping and incentive
schemes etc however there were various breaches of health and safety law which if could not
attend, would lead to enforcing action by enforcing agency. The remedial cost may be few thousand
dollars which is less than the total cost of loss of production, personnel disability and injuries etc
caused by an accident.
The recommendations made in this report will significantly reduce the potentials of
incidents/accidents and decrease the cost associated with incident/accident and ill health. This will
indeed improve the morale of workforce and in the long run save money from unnecessary claims,
losses of production and also improve the corporate image of the organization.
APPENDIX 5
NATIONAL GENERAL
CERTIFICATE UNIT NGC3 – THE HEALTH AND
SAFETY PRACTICAL APPLICATION
(2011 specification)
Location: NOSHPA Well Head Construction (OGDCL PAKISTAN) Date of review: 01/04/2015
Recommendations:
Recommendation Likely resource implications Priority Review date
Striking with underground
services and cables
Underground services Purchasing of pipe/cable detector
identification or radar system, estimated High Immediate
immediate cost US$ 3500
Training and supervision of Arrangement of competent trainer
medium 01/04/2015
staff and motivation and incentive schemes. US$1100
Pedestal and Vehicle
Operations
Designated walkways for Separate Routs, Guard rails and
pedestrians and routs for safety signs, immediate estimated Medium 01/04/2015
vehicle movement cost US$700
Provision of reverse horns,
Purchasing of reverse horns, flash
flashing beacons, certified Medium 01/04/2015
beacons, certification, US$ 500
vehicle
Inappropriate Storage
Design and Handling
of Materials
Safe design of store and lay Separate store for hazardous and
High Immediate
down area non hazardous materials.US$ 3500
Cleaning staking of Proper Staking of materials and
medium 01/04/2015
haphazard materials barication US$ 700
Hot Jobs in 01/04/2015
Fabrication Yard
Provide separate gas Gas cylinder store Estimated
High 01/04/2015
cylinder area immediate cost US$ 2000
Purchasing of these items.
Fire blanket, canopy and
Estimated immediate cost US$ High 01/04/2015
portable fire extinguishers
1000
Yard store flooring to be
General clean up and disposal of
cleared of obstructions to 01/04/2015then
any unused and waste materials. Medium
gain access to shelving and review each month
US$ 500
emergency exit.
Deep Excavation
Strengthening of Cement lining, shoring, battering
High 01/04/2015
embankment etc. US$ 1500
Training and Supervision Hiring of Trainer US$1000 01/04/2015
Emergency Rescue
Procedure and
Arrangements
Hiring of Consultant and
Emergency procedures and
establishing emergency response
creation of Emergency Medium 01/04/2015
procedures. Estimated immediate
Response Team
cost US$ 4500
Walky talky estimated cost US$
Communication system Medium 01/04/2015
1000