PURCHASE ORDER

Invoice To Voucher No. Dated


Emerald Telcominfra Private Limited 0054 23-Oct-2020
145 & 146, D Wing, Clover Centre Mode/Terms of Payment
11, Moledina Road, 50% after 15 days of acceptance of AT & 50% after 15 days of signing our
JMS.
Camp, Pune-411001 Supplier's Ref./Order No. Other Reference(s)
GSTIN/UIN: 27AADCE1467H1ZO 0053
State Name : Maharashtra, Code : 27 Despatch through Destination
E-Mail : sourabh.shrivastava@etelinfra.com
Supplier Terms of Delivery
SK Televentures Engineering Services
Dukan No- 1,2, Gangasagar Colony, Agra Road .
Jaipur
GSTIN/UIN: 08BTUPG7491M1ZN
State Name : Rajasthan, Code : 08
Sl Description of Goods Due on Quantity Rate per Amount
No.
1 UBR Works 15-Oct-2020 200000.00

Total ₹ 200000.00
Amount Chargeable (in words) E. & O.E
INR Two Lakh Only for Emerald Telcominfra Private Limited
Company's Service Tax No. : AADCE1467HSD001
Company's PAN : AADCE1467H

Authorised Signatory

This is a Computer Generated Document


MH Circle
Sr. No Service Code Short Description UOM Long Description
Rate (Rs.)

Kitting & Transportation (Upto 100 KM) of UBR Radio with AC POE, Indoor AC input PoE Supply with Ethernet Surge
Protector, Outdoor DC Input POE supply with Ethernet Surge Protector, IBRIDGE IRM KIT, Unterminated DC Cable for
DC Input POE, UV resistant pre-crimped CAT6 cable - 2 Mtr, UV resistant pre-crimped CAT6 cable - 5 Mtr, UV
Kitting & Transport-
1 3340847 LS resistant pre-crimped CAT6 cable - upto 100 Mtr(Customer End), UV resistant pre-crimped CAT6 cable - upto 100 1,529
UBR+Accessories Mtr(eNodeB End), Roof Top Pole(3/6M, Wall Mount Pole(1.5M/3M) with all accessories as per engineering drawing,
Mounting Anchor Bolt, HVU-M10 X 90 (Rate per Hop), Grounding cable -10M and POE extender/Media conveters as
per site BOM requiements ( As per BOQ Finalisation as per Survey)

UBR Link Installation & Commissioning inclusive of Installation AC &DC POE along with Surge and POE Laying and
End Terminattion of Cat5/Cat6 cable, grouding cable(10 MM^2X1C/6 MM^2 X1C) and DC power cable(1.5
MM^2X2C and AC power Cable. All FIM (Rate per Hop). Details Mentioned Below.
1. Installing, fixing, assembling, interconnecting of ODU with mounting bracket if needed, PoE, Surge arrestor.
Termination of cables is part of TSP contractor scope
Installation : Pole/Wall mounting as per the guidelines of the site engineer
Material : UBR with accessories (wt. 4 Kg approx.) & IRM KIT (FIM: UBR equipments & IRM KIT)
2. Laying and routing of Cat 5 cable throgh Cable tray/conduit, connectorisation and termination of RJ-45 with ODU
and PoE.
Average lenght of CAT 5 cable provided by vendor is of (FIM) 50m per site.
Termination of the cables is part of TSP contractor scope
Material : Crimping tool to be provided by vendor if required.
UBR Link Installation &
2 3339635 LS 3. Laying, routing and termination of copper grounding cable. 2,060
Commissioning Average lenght of Grounding cable provided by OEM is of 10m per site.
Termination of the cables is part of TSP contractor scope
Installation : Proper routing and termination of grounding cable as per guidelines.
Material : 1Core 6 AWG grounding cable (green color) of (FIM: 10MTR)
4. ermination of power cable to power on PoE, with compatiable connectorisation on site (AC or DC). Insulation and
lebelling for terminated power cable in utility rack.
Material : For DC Supply : UV, non-armoured 2-core 14 AWG, black color, (FIM: 5MTR)
For AC Supply : non-armoured with 3 pin connector, (FIM: 3MTR)
5. Commissioning of ODU and alignemnt to get desire RSL as per link engineering.
Configure the ODU & PoE to integrate with RJIL system successfully.
Material : Laptop to be provided by vendor.
( I&C to be done as per installation guideliens relased for the Products to be deployed)

UBR LINK ACCEPTANCE


1. COORDINATE WITH DATA TEAM TO MAKE THE UBR LINK VISIBLE IN EMS ( ELEMENT MANAGEMENT SYSTEM).
2. CO-ORDINATE ACCEPTANCE TESTING SCHEDULE WITH RJIL (AS PER GUIDELINE).
3. TESTING ON ETHERNET EQUIPMENT ( FIM ) IF REQUIRED FOR ACCEPTANCE TESTING. (AS PER A STANDARD FIELD
TEST /COMMISSIONING PROCEDURE)
4. INSTALLATION INSPECTION PERFORMED BY VENDOR AFTER NOTIFICATION BY RJIL OF SITE COMPLETION & PROVIDE
CHRG: UBR LINK ACCEPTANCE
3 3300733 Per Hop A WRITTEN LIST OF DESCPREPENCIES IF ANY. 997
(Per Hop) 5. COMPLETE LABELING OF UBR LINK AS PER AGREED FORMAT AND PROCESS WITH RJIL.
6. PERFORM LINK ACCEPTANCE TESTING AS PER DEFINED PROCEDURE WITH THE HELP OF TABLET (TABLETS SHALL BE
ARRANGED BY RJIL).
7. CLEAR PUNCH POINTS RAISED BY RJIL/QA TEAM.
8. SUBMIT ALL COMMISSIONING AND ACCEPTANCE TEST REPORTS, AS SPECIFIED IN THE ACCEPTANCE TEST
SCHEDULE, TO RJIL FOR ACCEPTANCE OF THE UBR LINK.

P&F MOUNTING/ANCHOR BOLT, HVU-M10 X 90 For Wall Mount (WM) Pole installation as per details mentioned in
P&F MOUNTING/ANCHOR BOLT,
4 3317446 No the drawing no. 10070-C63-XX-XXXX-XXXX-ENB-0000-286_1.5M WM and 10070-C63-XX-XXXX-XXXX-ENB-0000- 149
HVU-M10 X 90 285_3M WM
Installation of 1.5 m Wall Installation of 1.5 m Wall Mount(WM) pole with all accessories as per engineering drawing No.10070-C63-XX-XXXX-
5 3338050 No 332
Mount Pole XXXX-ENB-0000-286_1.5M WM and ensure to install on the BEAM structure with proper water proffing -8Kg

Installation of 3 m Wall Mount Installation of 3 m Wall Mount(WM) pole with all accessories as per engineering drawing No.10070-C63-XX-XXXX-
6 3339605 No 498
Pole XXXX-ENB-0000-285_3M WM and ensure to install on the BEAM structure with proper water proffing -18Kg

Installation of 3 Mtr Roof Mount Installation of 3 m Roof Top Mount with all accessaries as per engineering drawing.(21.4 Kg). 10070-118-63003975-
7 3339606 No 498
Pole B02-012 - 3m RTP UBR and process and methodology

CHRG RCC FOUNDATION (Chipping / Removal of water proofing /PCC at pedestal location, Anchoring work.
CHRG RCC Foundation-3Mtr Foundation Bolts Supply & installation 12MMx180mm., RCC and allied Civil Work including re-enforcement, Water
8 3326712 LS 2,127
Pole Proofing, etc.) as per specification and process mentioned in Engineering drawing no.10070-118-63003975-B02-
012 - 3m RTP UBR

Installation of 6 Mtr Roof Mount Installation of 6 m Roof Mount with all accessaries as per engineering drawing.(76.1) as per process and stadards
9 3339860 No 997
Pole mentioned in the engineering drawing no.10070-118-63003975-B02-013 - 6m RTP UBR

CHRG RCC FOUNDATION (Chipping / Removal of water proofing /PCC at pedestal location, Anchoring work.
CHRG RCC Foundation-6 Mtr Foundation Bolts Supply & installation 12MMx180mm., RCC and allied Civil Work including re-enforcement, Water
10 3326713 LS 2,778
RTP Proofing, etc.) as per specification and process mentioned in engineering drawing no.10070-118-63003975-B02-
013 - 6m RTP UBR

Supply and Installation/laying of PVC Conduit between the UBR and utility rack along with clamping/saddle.
SUP&LAY FLEX PVC CONDUIT
11 3206508 M Installing, fixing, assembling, interconnecting as required 46
DIA 25MM (Optional for specific area) (25 mm)
Installation of Pole Mount
including all accessory as per
Installation of Pole Mount including all accessory as per engineering drawing NO. 10070-40-EP-C53-PR-060 R-0.
12 3268025 engineering drawing NO. 10070- No 332
(20.59 Kg) at eNodeB end on requirement basis
40-EP-C53-PR-060 R-0.(20.59
Kg)
Supply and Filling of Crushed Stone in the Steel Box.
SUPPLY & FILLING OF CRUSHED The counter quantity of 10 mm and down aggregate from crushed stone is about 0.30 cum by volume (approx. 475
13 3333348 STONE for UBR Self Standing 3M LS kg by weight ). 664
Pole 10 mm down aggregate pour in box in a compacted layer of 200 mm thickness. Compaction to be done through
tamping rod.
Charges for Installation of UBR Self-Standing 3 Mtr Pole including all accessories as per the set guideline for
CHRG: Installation of UBR Self installation of Microwave Antenna as per the Drawings / Designs / Requirement and direction of EIC
14 3342600 Standing 3M Pole (Pole/Delta No Material: 664
with Steel Box) Steel Box, Pole, Accessories & Fittings
UBR Self Standing Pole 3M (approx. 79Kg)

Supply and Installation of


Supply and Installation of Solar Aviation Lamp with tower mounting accessories and including all necessary material
15 3304415 Solar/LED Aviation Lamp with No 997
wherever required
tower mounting accessories
Utility Rack and Pole Foundation for Small Cell / DAS / UBR sites. Carring out site preparation such as cleaning of
existing R.C.C. slab, roughening of pedestal footprint area, applying bonding agent, etc. Providing and placing in
position Thermo Mechanically Treated (TMT) bars of grade Fe415 conforming to IS:1786-2008 for all R.C.C works
including cutting, bending, binding, etc. Providing, mixing & laying in position Cement Concrete Mix ( M-20) as per
IS:456-2000 using 20mm down aggregates including formwork, vibrating, leveling, curing, cube testing, finishing,
shuttering, surface preparation etc. for all types of structures and Foundation work complete as specified in
CONSTRUCTION OF PEDESTAL drawings. Use of mechanical vibrator shall be made for all cement concrete works. Rectifying any damage to existing
16 3250273 CUM 11,966
(RCC M20) at Ground Level flooring/water proofing treatment all complete as per the requirement and direction of engineer in charge but
excluding reinforcement.
**Task closure can only be acceptable post completion of the complete site milestone and relevant approvals. All
changes post rejection need to be closed within the scope requirement without any additional charges."
Material: Pole (FIM) & Civil Material in the scope of vendor
For Job to be executed at Ground level / Ground floor of Building
Refer the Drawing No. 10070-40-EF-C73-PR-159

Charges for Installation of Battery Each/Set (LI-ION) 48V, with/without CBMS/Junction Box (FIM), with accessories,
brackets and covers, etc. including hoisting as per the site requirement, placing the Battery System in place, insert
proper washers and Nut, tighten it appropriately.
Battery to consist of Battery Unit, CBMS/Junction Box (Optional) along with mounting and accessories. Installing,
fixing, assembling, interconnecting as required for Free Issue Material (FIM)
The installation charges shall include Fixing of modules, interconnecting strips, terminals, covers etc. as per OEM
INST OF 48V 20 AH - 25KGS
17 3297928 Each guidelines as and direction of engineer in charge. 199
BATTERY Cost to include the cost of all manpower, tools tackles, termination cables, clamps and hardware. etc.
**Task closure can only be acceptable post completion of the complete site milestone and relevant approvals. All
changes post rejection need to be closed within the scope requirement without any additional charges."
Material: Battery System and CBMS (FIM)
Tool: Multimeter, Tester etc.
Refer the Guidelines Manual:

Charges for fixing of Power System (SMPS upto 2KW/1000VA) as per instruction of Engineer in Charge. To be
INST SMPS UPTO 2KW + installed in the Rack as a Unit with necessary bolting arrangement.
18 3317324 Each 199
INVERTER UPTO 1KVA (25Kg) Weight: 25 kg. (approx.)
Refer the Installation Manual

GI strip of 25x3 mm to connect Roof Top systems to BG Earth pits. Laying of strip partially across parapet wall,
vertical wall preferably from Cable duct area, site specific through Walls and below ground to the earth pit. routing
through 50mm GI pipe at 2M above ground and Below ground till Earth pit .Termination at Earth pit and equipment
with 2nos of 10diaSS Bolts, Joints to be overlapped welded and painted with GI/aluminium paints or connected with
2 nos 10 dia GI/SS bolts if welding is not feasible. Proper Fixing across wall with GI saddles of 25x3 mm at suitable
S&I OF 25X3 GI STRIP / Earthing
19 3106865 METER distance at least at 0.5m apart as per the design document requirement and direction of engineer in charge. 60
Strip **Task closure can only be acceptable post completion of the complete site milestone and relevant approvals. All
changes post rejection need to be closed within the scope requirement without any additional charges.
Material: GI Strip - 25x3 mm with GI saddles 25x3 mm in the scope of vendor
Refer the Guidelines Manual:

S&L 1CX6MM2 CU PVC Flexible


20 3333013 M S&L 0.65/1.1KV,1CX6MM2 CU/PVC/PVC-GREEN 30
Cable
Charges for Supply & Laying of Electrical Cables Armoured/Un-Armoured.
Supply as per specifications: Voltage LT 0.65/1.1kV, Insulation-PVC, Armoured-GI strip/wire/Un-Armoured,
Conductor - Flexible, stranded, Cu/Al, PVC IS-1554 make approved.
Laying of cables using of PVC Rigid/Flexible re-enforced conduits for bends & external open bunch, using GI Pipes
for road cross, traffic area & Overhead crossing, below ground at minimum 400mm deep in normal soil inclusive
appropriate re-furbishing work, across/through Concrete Walls internal/external clamped by using GI saddles at
every 0.5m, Partly across Cable trays securing by Cable ties, Through GI pipes/ armoured flexi conduits/or as required
S/L PVC FLEX CABLE CU 2X1.5 while crossing the paths, across human movements, Hard surfaces, through walls and cable tray etc. and secure it
21 3169423 METER 24
MM2,1100V appropriately as per the design document requirement and direction of engineer in charge.
Labelling of all the Equipment's, cables, racks and accessories as per the guidelines.
The rate shall include the cost of all manpower, testers, scaffolding/ladder, clamps, hardware, tools, tackles and
accessories etc. but excluding cost of conduits / casing capping required to execute the job.
Scope includes Site mobilization charges

Charges for supply & laying of Electrical cable on the agreed routes with the help of clamps and connectors as per the
site requirement

LAYING PVC FLEX COPPER CABLE Charges for laying of Grounding cable from BBU/RRH to the nearest Grounding Point
22 3175648 METER 6
1CX6 MM2 Material: 1C x 6 mm2 Grounding (Un-Armoured) Cable
SUP&LAY CABLE CU UNARM
23 3184043 METER Supply & Installation of 3 Core x 2.5 Sqmm, Cu, flexible FRLSH power cable 48
3CX2.5MM2
SUP. & END TERMINATION FOR CHARGES FOR TERMINATION OF 0.65/1.1KV, 2C 16MM2, CU/PVC/PVC, UNARM,
24 3246842 Each 39
2Cx16MM2 YY CABLE FRLS, LT CABLE INCLUDING SUPPLY OF ALL REQUIRED MATERIALS

Charges for Termination of Electrical Cables Armoured/Un-Armoured using proper lugs/terminals/joinders etc. and
secure it appropriately as per the design document requirement and direction of engineer in charge.
Lugs can be U,O, Pin Type heavy duty, Long barrel, Tinned copper ( unless specified other) approved makes for lugs
SUP. & END TERMINATION FOR and glands are Comet, Dowels )
25 3251305 Each 45
3CX2.5 SQMM YY (Unarmoured) The rate shall include the cost of all manpower, testers, scaffolding/ladder, clamps, hardware, tools, tackles and
accessories etc. but excluding cost of conduits / casing capping required to execute the job.
e. Labelling of all the Equipment's, cables, racks and accessories as per the guidelines.
Scope includes Site mobilization charges

Charges for Termination of Electrical Cables Armoured/Un-Armoured using proper lugs/terminals/joinders etc. and
secure it appropriately as per the design document requirement and direction of engineer in charge.
Lugs can be U,O, Pin Type heavy duty, Long barrel, Tinned copper ( unless specified other) approved makes for lugs
SUP. & END TERMINATION FOR and glands are Comet, Dowels )
26 3262281 Each 49
2Cx1.5MM2 The rate shall include the cost of all manpower, testers, scaffolding/ladder, clamps, hardware, tools, tackles and
accessories etc. but excluding cost of conduits / casing capping required to execute the job.
e. Labelling of all the Equipment's, cables, racks and accessories as per the guidelines.
Scope includes Site mobilization charges

Charges for Termination of Electrical Cables Armoured/Un-Armoured using proper lugs/terminals/joinders etc. and
secure it appropriately as per the design document requirement and direction of engineer in charge.
Lugs can be U,O, Pin Type heavy duty, Long barrel, Tinned copper ( unless specified other) approved makes for lugs
SUP. & END TERMINATION FOR and glands are Comet, Dowels )
27 3269867 Each 32
1CX6 SQMM YY Cable The rate shall include the cost of all manpower, testers, scaffolding/ladder, clamps, hardware, tools, tackles and
accessories etc. but excluding cost of conduits / casing capping required to execute the job.
e. Labelling of all the Equipment's, cables, racks and accessories as per the guidelines.
Scope includes Site mobilization charges

Utility Rack and Pole Foundation for Small Cell sites. Carring out site preparation such as cleaning of existing R.C.C.
slab, roughening of pedestal footprint area, applying bonding agent, etc. Providing and placing in position Thermo
Mechanically Treated (TMT) bars of grade Fe415 conforming to IS:1786-2008 for all R.C.C works including cutting,
bending, binding, etc. Providing, mixing & laying in position Cement Concrete Mix ( M-20) as per IS:456-2000 using
CONSTRUCTION OF PEDESTAL 20mm down aggregates including formwork, vibrating, leveling, curing, cube testing, finishing, shuttering, surface
preparation etc. for all types of structures and Foundation work complete as specified in drawings. Use of
28 3241656 (M20) WITHOUT CUM 5,251
mechanical vibrator shall be made for all cement concrete works. Rectifying any damage to existing flooring/water
REINFORCEMENT proofing treatment all complete as per the requirement and direction of engineer in charge but excluding
reinforcement.

Material: Pole (FIM) & Civil Material in the scope of vendor


Refer the Drawing No.

WATERPROOFING AND Making good the surface, broken for making the pedestals, applying two coats of approved / specified water repelant
29 3250252 SQM 365
RESTORATION paint all around and over the pedestals and making the area as it is basis with all around hauler, including pond test.

Chipping and removal of water proofing layer for locating the RCC Beams and Columns for drilling and fixing Dowels.
Chipping and removing of existing water proofing, layers carefully, with help of chisels, grinders, drills, (without
hammering or damages to other areas) to locate the existing Beams and columns and further work of pedestal
CHIPPG & REMOVG OF EXISTING
30 3251266 SQM construction. As per site the guidelines and instruction fro site in-charge, issued time to time, Top layer to be 199
WATER PROOFING maximum 150mm while considering the UOM in SQM.
Material: Pole (FIM) & Civil Material in the scope of vendor
Refer the Drawing No.

Charges for Supply and Fixing of GI Pipe/Conduit with the help of the clamps and other accessories
31 3262718 P & L-GI Pipes-50 mm dia METER 195
50 mm dia Conduit - GI As per IS 9537 Part 2

Additional Site Visit of Engineer Extra Site Visit by the Contractor's Personnel for reasons not attributable to contractor; subject to prior approval of
32 3293752 SITE 797
/ Technician SCH.
TRANSPORTATION-Beyond 100 TRANSPORTATION CHARGES - Beyond 100 Km by SCV (Pickup or equivalent)
33 3339581 Per KM 11
Km-SCV Charges includes Kitting, Loading, Unloading of material

Charges for laying Armoured CAT 6 cables along the tower leg / pole / vertical cable tray till Rack inside ODC / Shelter /
Laying of CAT-5 Cable Over &
34 3118709 METER GBM including fastening / fixing it neatly with the help of the cable clamps, PVC ties etc.. Along the agreed routes. 4
above initial 100 Mtr. The rate is inclusive of the termination (Supply and prepration/crimping of RJ-45 Connector) and jointing

LIFTING OF MATERIAL ON ROOF


35 3298242 SITE Lifting of Rack & other materials etc. on roof top manually/ with tackles 997
TOP UP TO 4 TH FLOOR
LIFTING OF MATERIAL ON ROOF
36 3293460 TOP MANUALLY BEYOND 4TH PER FLOOR LIFTING OF MATERIAL ON ROOF TOP MANUALLY BEYOND 4TH FLOOR 199
FLR