DURA CONSTRUCTION SDN. BHD. (Co. No.

948652-V)
SITE DAILY REPORT
PROJECT: THE PROPOSED CONSTRUCTION AND COMPLETION INCLUDING OTHER RELATED ANCILLARIES FOR BRIDGE 2 CROSSING SUNGAI LANGAT
ON LOT 74463 AND LOT 74462, MUKIM TANJUNG DUABELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN FOR BONUS ESSENTIAL SDN BHD

TOTAL MANPOWER Plant & Equipment


Trade Total Type NO. Type NO.
Project Manager Air Breaker Power Float Machine
Coordinator Air Compressor Roller Compactor (1Ton)
Site Engineer Bar Bending Machine Roller Compactor (10Ton)
Site Supervisor Bar Cutting Machine Roller Compactor (20Ton)
Surveyors Bosch Makita Cutter
Operators Bulldozer
General Workers backhoe
Bar bender Concrete Pump
Carpenter Concrete Mixer
Concreter Crawler Crane
Welder Dump Truck
General Workers Dumper
Forklift
Generator Set
Hydraulic Excavator
Lorry
Mobile Crane
Mini Concrete Mixer
Passenger
Piling machine
Plate Compactor

Material Delivery:

Remarks:

Weather:

Prepared by Contractor’s Rep: Verified / Approved by Client / Consultant Rep:


Signature: Signature:

Name: Name:
Designation: Designation:
Date: Date: