PCDEBR0571
Revision: 00
METHOD STATEMENT Date Implemented:
15/02/2020
Company: MSS
METHOD STATEMENT
1. Scope
This Risk assessment will cover the following activity: Construction of Lab at Kamoa-1 on KAMOA Copper
mine, DRC.
2. Planning
ANUJ MISHRA Appointed Supervisor and team shall physically visit site, confirm and pre- inspect planned
work area and determine exact location and positioning of work, tools and equipment required. Area
related hazards and Risks shall be identified and incorporated into the DSTI. They will also determine if
interfacing with other activities and contractors will be present and plan and communicate accordingly.
Specific required work permits shall be applied for from the Project permit issuer prior to any work taking
place. Responsible Supervisor / Foreman will perform proper route planning as to identify all obstacles such
as overhead and underground services as well as interphase with pedestrians, mining machinery etc.
3. Inspections
Pre site entry check, of delivery vehicle, will be performed by the Appointed Supervisor. Only roadworthy
and safe loaded delivery vehicles will be allowed access to site.
All tools, equipment and material brought onto site will be noted on a register (Description and serial
number), each item will also have a monthly inspection checklist and shall be inspected by a competent
appointed person prior to site use, with findings noted on monthly checklist. All tools and equipment will be
inspected by the competent appointed persons then presented to KCSA for approval inspection and tagging,
thereafter company appointed inspectors will perform monthly inspections.
Material inspection will take place during offloading. This will be done by a responsible and Appointed
Supervisor and findings will be noted. No substandard, defective, corroded or damaged tools, equipment and
material will be allowed on site, such defective material will immediately be quarantined and removed from
site as soon as possible using the gate release system.
All material and tools will be over inspected by the user daily as well as every time prior to use.
Such inspections will be noted in a checklist and filed for audit purpose. All safe declared tools and
equipment will be tagged as per Project specific color coding system. After work has been done, a close-out
inspection shall be done to ensure the work area remain safe, clean and neat – Findings will be noted in the
DSTI closeout section and handed to the SHE Officer.
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
(List of all tools that will be used for this specific task) (Mark relevant tools for task or add other)
HAND TOOLS
Other:
Concrete cutter
Other:
Other:
GAS EQUIPMENT
Other:
HYDRAULIC
Crimper
Other:
MOBILE PLANT
Other:
Hard hat Safety Glasses (Clear) Air hood Mining Hard hat (Lamp
fitting)
Hearing protection Front flip Gas cutting Shoulder pads / Yoke Steel toe Gumboots
(Ear muffs) goggles
Dust mask Double eye protection Apron One piece Mining overall
(Face shield and safety
glasses) (Reflective)
Gloves
Come along
Turfers
Beam clamp
Hoist
Plate grab
Spreader Beam
Guide rope
Man cage
Cylinder cage
Softeners
Other:
TEAM MEMBERS:
Other:
5. Method statement
(Include People, Tools, equipment, Plant. Each step of activity to clearly identify who will perform this,
what tools will he use, where will he work from and exactly what he will be doing)
Steps to be followed: (Break activity down into small steps, these steps to correspond with Risk
assessment)
Stretcher
Blanket
Other:
7. Closeout
No lose objects on elevated levels during and after work. Area supervisor to perform an end of shift
inspection to ensure proper stacking and storage as well as proper housekeeping. All tools, equipment and
PPE to be properly stored during lunch breaks and end of shift as to avoid damage to critical equipment or
equipment theft. All tools are to be removed from work areas and locked away at end of shift. Supervisor to
complete DSTI closeout section after post work area inspection and hand closed out DSTI to SHE Officer for
record keeping.
8.6 – Other:
Attach this Method statement to the Task Specific Risk assessment that is done according to the steps
under section 5 of this document, include directly after approval page.