The document is a material approval submittal from Tri of Cliff House for the installation of clean and hot water pipes made of PPR in various diameters. It includes dimensions of PPR pipes from 100mm to 15mm diameter and notes the pipes will be supplied by ATP Toro 25. The submittal is for engineer approval for the Cliff House project location.
The document is a material approval submittal from Tri of Cliff House for the installation of clean and hot water pipes made of PPR in various diameters. It includes dimensions of PPR pipes from 100mm to 15mm diameter and notes the pipes will be supplied by ATP Toro 25. The submittal is for engineer approval for the Cliff House project location.
The document is a material approval submittal from Tri of Cliff House for the installation of clean and hot water pipes made of PPR in various diameters. It includes dimensions of PPR pipes from 100mm to 15mm diameter and notes the pipes will be supplied by ATP Toro 25. The submittal is for engineer approval for the Cliff House project location.
MT Ref No. Rev. No. Date : 14-Sep-20 DM.CH-MA-03 Discipline : Mech Elect Plumbing Fire Protection Others Material Details: Item Description : CLEAN & HOT WATER ISNTALLATION Reference. Name Of Material : PPR PIPE PN.10, 16, 20, 25 Spec.Clause : Location Of Intended Use : CLIFF HOUSE Drawing No. : Manufacturer / Suplier : ATP TORO 25 Country Of Org. : Reason For Submittal : For Approval For Information Others Remarks : As per Original Alternative Attachments : Drawing Spec. Sample Catalog Others For Sub-Contractor Reciept Acknowledge by Engineer Prepared by : Tri Signature : ____________ Date : ______ Received by : ____________ Checked by : Kadek Dwi Signature : ____________ Date : ______ Date : __________________ Approved by : Marson Signature : ____________ Date : ______ Time : __________________
DIMENSI PIPA PPR PN10, 16, 20, 25
1. Ø 100 MM ( 4") 2. Ø 80 MM ( 3") 3. Ø 65 MM (2 1/2") 4. Ø 50 MM (2") 5. Ø 40 MM (1 1/2") 6. Ø 32 MM (1 1/4") 7. Ø 25 MM (1") 8. Ø 20 MM (3/4") 9. Ø 15 MM (1/2")
Returned to Sub-Contractor with status as :
A : Approved B : Approved as noted C : Revise / Submit D : Information For Engineer Receipt Acknowledge by Sub-Contractor Signature : _______________________________ Signature : _______________________________ Date : _______________________________ Date : _______________________________