Document Number

KAMOA COPPER SA KC-CON-CERT-01


Revision Number / Date
Quality Management System 06 - 22/08/2022
Page Number
CONSTRUCTION CERTIFICATE Page 1 of 1

AUTHORIZATION TO PROCEED WITH CONSTRUCTION


The Applicant shall ensure that no construction activities will commence prior to obtaining all the
signatures in the Approval section of this document.

Applicant:
CONSTRUCTION OF BASES
FOR TENTS AND ERECTION
Main Contractor:  MSS Project: AND ELECTRICAL WORKS
Sub-contractor:  N/A Project No.:
Scope of work:  CIVILS AND ELECTRICAL Drawing No:  
Area & WBS No.: JMMC CAMP EXTENSION Specification:  
The following documentation shall be attached to this certificate prior to approval:
Tick box
 Latest approved Block Plan.
 Land Disturbance Permit.
 Approved Method Statement.
 Latest revision Issued for Construction drawing/s.
 Safe Access Handover Certificate received from KCSA Construction.
 Risk Assessment approved by the KCSA SHE Manager.
 All required QMS documentation in place and approved by KCSA QMS Manager. (Approved QCP, IFC drawings etc)
 Setting out has been checked and surveyed by KCSA Surveyor.
 Buried Services scan report from Survey dept. attached. If not state your reason in comments below. YES NO
 Are there any known future structures to be constructed in this area? YES NO
 If yes is ticked above, ensure future structures are indicated on the block plan.
 KCSA Construction Project Manager Infrastructure to confirm.
Ensure all the above supporting documentation are attached hereto prior to signing.
COMMENTS:

APPROVAL
Designation Name Signature Date
KCSA Construction Civil Supervisor Johan Smith / Leon Bessenger / Jurie Human

KCSA Construction Civil Supervisor Infrastructure Bennie Esterhuizen / Adolf Oelofse

KCSA Construction - SHE Manager Morne Bezuidenhout / Paul De Jager / James Olal

KCSA Construction - QMS Manager Gerhard Eastes / Kagiso Sejwane


Johan Nortje / Johan Serfontein / Nico Visser / Andre Nell /
KCSA Construction - Engineering / E & I Manager
Wikus Terblanche
KCSA Construction - Senior Surveyor Jan Hendrik Van Aswegen / Nyam Bafu

KCSA Construction - Senior Construction Manager Kasper Badenhorst / Nico Theron / Johan jodles
KCSA Construction Senior Construction Manager
Albie Jv Rensburg / Japie Liebenberg
Alternative and underground
KCSA Construction - Project Manager Danie Oosthuizen / Kasper Badenhorst / Otto Wabeke / Nico Ellis

KCSA Head of Construction Torra Engelbrecht / Kasper Badenhorst


Notice is hereby given to the abovementioned contractor to proceed with construction.