Professional Documents
Culture Documents
Overhauled and brought back to the vessel, Not installed ( steel work
13 Raw Cooling Water (RCW) Pump Motor #1 (STBD)
??)
17 Main CCW Pumps Motor (E/R) #1 Installed and need do the cable connections