CONTRACTAKAKBL-LOT1:
DESIGN,MANUFACTURE,SUPPLY & CONSTRUCTION 400& 230kV
SUBSTATIONS BOLE LEMI & KLINTO INDUSTRIAL ZONE POWE
TRANSMISSION PROJECT
FOR REVIEW
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET REV A05
Table of Contents
Table of Contents........................................................................................2
1 Technical Data..........................................................................................1
CT Parameter
CT Position CT Ratio Type Connection
Branch CT 100/1 — Y
VT Parameter
1
VT Position VT Ratio Type
33 0.1
Reactor HV side / kV —
√3 √3
2 Calculating Protection Settings
2.1 Overcurrent Protection of 33kV Line
CT ratio: 400/1
VT ratio:33kV/100V
0.5*10530
I op .stage 1= =13.163 A
400 /1
Time setting
250 5
I op.stage 2 3.125A
400 /1
Time setting
Current setting
The current setting set as 1.2* Line capability (1.2*250) with TMS 0.2.
1.2∗250
I op .stage 4= =1.25 A
400/1
Time setting
Using Standard Inverse characteristic. The time delay set to achieve an operating stage2
2
0.14
t= 0.02
∗TMS=0.5 , I f =13140 / K ct =32.85 A
If
( )
IS
−1
2.2.1 Parameters
CT ratio : 400/1
Current setting
The current setting set as 90A with a time setting of 0.3 second.
90
I op .stage 1= =0.225 A
400/1
Time setting
t 1=0.3 s It is used to trip circuit breakers of 33kV line.
Current setting
0.2 250
I op.stage 4 0.125A
400
Time setting
With TMS is set to 0.1and I f =200 A (measured current by the relay), then the tripping time will be:
0.14 0.14
t= 0.02
∗TMS= 0.02
× 0.1=0.5 sec
If 200
( )
IS
−1 ( 0.125∗400 ) −1
3
2.3 Overcurrent Protection of 33kV Bus Section
2.3.1 Parameters
CT ratio: 2500/1
Current setting
I op.stage1 13140/2500=5.26A
Time setting
Current setting
I op.stage 2 2*2500/2500=2A
Time setting
Current setting
2500 2
I op.stage 2 2A
2500 /1
Time setting
Using Standard Inverse characteristic. The time delay set to achieve an operating stage2
4
0.14
t= 0.02
∗TMS=0.3 , I f =13140 / K ct =5.26 A
If
( )
IS
−1
Hence, TMS=0.06 .
2.4.1 Parameters
CT ratio: 2500/1
I op.stage1 0.2A
Time setting
Current setting
2500 0.1
I op.stage 4 0.1A
2500 /1
Time setting
Using Standard Inverse characteristic. The time delay set to achieve an operating time of 0. 1
0.14
t= 0.02
∗TMS=0.1, I f =10671 / K ct =4.27 A
If
( )
IS
−1
Hence, TMS=0.06
5
2.5 Overcurrent Protection of 33kV Aux. Transformer
CT ratio : 75/1
VT ratio:33kV/100V
Current setting
The current setting should be greater than the rated current of the Aux. transformer.
Where:
K rel
is the reliability coefficient, and it is taken as 1.2.
I rated
is the rated current of 33kV Aux. transformer.
Time setting
0.14
t= 0.02
∗TMS=0.31 s
If
( )
IS
−1
6
2.6 Zero Sequence Overcurrent Protection of 33kV Aux.
Transformer
2.6.1 Parameters
CT ratio : 75/1
CT ratio factor ki : 75
Earth fault current factor R : 0.1
Line nominal current In : 5.5 A
In R 5.5 A 0.1
=0.05
Setting IN> = Ki 75
Time setting
With TMS is set to 0.1 and I f =100 A (measured current by the relay), then the tripping time will be:
0.14 0.14
t= 0.02
∗TMS= ×0.1=0.2 sec
If 100 0.02
( )
IS
−1 ( 0.05∗75 ) −1
Qc 1 15 ×1 06 1
3× × =3 × 3
× =7.873 A
√ 3× U n K ct √ 3 × 33× 1 0 1 00
Where:
Qc is capacity of the capacitor
7
Un is rated voltage
Kct is CT ratio
Time setting
Qc 1 15 ×1 06 1
1.5 × × =1.5 × 3
× =3.936 A
√3 × U n K ct √ 3 ×33 × 10 100
Time setting
Allowed removal component number of in the same string segment within the capacitor
3 MNmn (K V −1)
K=
K V (3 MNn−3 MN +6 N −5)
Where:
Qc
1.5 K
√ 3× U n 1
I o= =0.406 A
3 MNmn−K (3 MNn−3 MN +6 N −5) K ct
Considering sensitivity recommended by manufacturer,
hence, set Iun=0.406/1.1=0.364A
8
Time setting
Allowed removal component number of in the same string segment within the capacitor
3 MNmn( K V −1)
K=
K V (3 MNn−3 MN +6 N −8)
Qc
1.5 K
√ 3× U n 1
I o= =0. 2801 A
K
3 MNmn−K (3 MNn−3 MN +6 N −5) ct
Considering sensitivity recommended by manufacturer,,
hence, set Iun=0.2801/1.1=0.255A
Time setting
Allowed removal component number of in the same string segment within the capacitor
3 MNmn( K V −1)
K=
K V (3 MNn−3 MN +6 N −8)
Qc
1.5 K
√ 3× U n 1
I o= =0. 05078 A
K
3 MNmn−K (3 MNn−3 MN +6 N −5) ct
Considering sensitivity recommended by manufacturer,,
hence, set Iun=0.05078/1.1=0.046A for alarm
Time setting
Note: The unbalance current setting should be revised during commissioning considering the
natural unbalance of the capacitor banks.
9
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 10 REV A05
System Settings
No. Item Value Unit Remark
1 Active_Grp 1 The active setting group number
2 Opt_SysFreq 0 Select the rated system frequency: “0”, 50Hz; “1”, 60Hz
3 PrimaryEquip_Name / The name of the protected primary equipment
4 Prot.I1n 400 A Rated primary value of protection phase CT
5 Prot.I2n 1 A Rated secondary value of protection phase CT
6 Measmt.I1n 400 A Rated primary value of metering phase CT
7 Measmt.I2n 1 A Rated secondary value of metering phase CT
8 Neu1.I1n 400 A Rated primary value of the No.1 zero sequence CT
9 Neu1.I2n 1 A Rated secondary value of the No.1 zero sequence CT
10 Neu2.I1n / A Rated primary value of the No.2 zero sequence CT
11 Neu2.I2n 1 A Rated secondary value of the No.2 zero sequence CT
12 SEF.I1n / A Rated primary value of sensitive zero sequence CT
13 SEF.I2n 1 A Rated secondary value of sensitive zero sequence CT
14 Prot.U1n 33 kV Rated primary value of protection VT
10
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 11 REV A05
1 50/51P.U2_VCE 4.62 V The voltage setting of the negative sequence voltage blocking element (phase voltage)
2 50/51P.Upp_VCE 70 V The voltage setting of the low voltage blocking element (phase-tophase voltage)
50/51P.En_VCE_Cro
3 0 The logic setting of the external voltage control function
ssCtrl
4 50/51P.RCA / ° The relay characteristic angle for the directional overcurrent protection
The logic setting of the function which can block the OC protection related voltage measurement when the
5 50/51P.En_VTS_Blk 0
voltage transformer is failed
6 50/51P.K_Hm2 0 The percent setting of the harmonic blocking element for OC protection
7 50/51P.I_Rls_HmBlk / A The current setting for releasing the harmonic blocking element of OC protection
11
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 12 REV A05
11 50/51P1.En_VCE 0 The logic setting of the voltage control element for the stage 1 overcurrent protection
The setting is used to select the directional mode for the stage 1 overcurrent protection.
12 50/51P1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
13 50/51P1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 1 overcurrent protection
18 50/51P2.En_VCE 0 The logic setting of the voltage control element for the stage 2 overcurrent protection
The setting is used to select the directional mode for the stage 2 overcurrent protection.
19 50/51P2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51P2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 2 overcurrent protection
25 50/51P3.En_VCE 0 The logic setting of the voltage control element for the stage 3 overcurrent protection
The setting is used to select the directional mode for the stage 3 overcurrent protection.
26 50/51P3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
27 50/51P3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 3 overcurrent protection
12
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 13 REV A05
30 50/51P3.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for OC3 protection
31 50/51P3.TMS 1 The time multiplier setting of the stage 3 IDMT overcurrent protection
32 50/51P3.tmin 10 s The minimum operation time setting of the stage 3 IDMT overcurrent protection
33 50/51P3.K 0.14 Constant “k” for the stage 3 IDMT overcurrent protection
34 50/51P3.C 0 Constant “C” for the stage 3 IDMT overcurrent protection
35 50/51P3.Alpha 0.02 Constant “α” for the stage 3 IDMT overcurrent protection
36 50/51P4.I_Set 1.25 A The current setting of the stage 4 overcurrent protection
37 50/51P4.t_Op 0.5 s The time setting of the stage 4 overcurrent protection
38 50/51P4.En_VCE 0 The logic setting of the voltage control element for the stage 4 overcurrent protection
The setting is used to select the directional mode for the stage 4 overcurrent protection.
39 50/51P4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
40 50/51P4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 4 overcurrent protection
43 50/51P4.Opt_Curve 1 The setting is for selecting the inverse time characteristic curve for OC4 protection
44 50/51P4.TMS 0.2 The time multiplier setting of the stage 4 IDMT overcurrent protection
45 50/51P4.tmin 0.02 s The minimum operation time setting of the stage 4 IDMT overcurrent protection
46 50/51P4.K 0.14 Constant “k” for the stage 4 IDMT overcurrent protection
47 50/51P4.C 0 Constant “C” for the stage 4 IDMT overcurrent protection
48 50/51P4.Alpha 0.02 Constant “α” for the stage 4 IDMT overcurrent protection
13
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 14 REV A05
55 50/51P.I_CCE / A The current setting of the heavy current blocking element for the overcurrent protection
56 50/51P.En_CCE 0 The logic setting of the heavy current blocking element for the overcurrent protection
1 50/51G.RCA / ° The relay characteristic angle for the No.1 directional zero sequence overcurrent protection
The logic setting of the function which blocks the No.1 ROC protection related voltage measurement when the
2 50/51G.En_VTS_Blk 0
voltage transformer is failed
3 50/51G.K_Hm2 0 The percent setting of the harmonic blocking element for the No.1 ROC protection
50/51G.3I0_Rls_Hm
4 / A The current setting for releasing the harmonic blocking element of the No.1 ROC protection
Blk
5 50/51G1.3I0_Set 0.225 A The current setting of the No.1 stage 1 zero sequence overcurrent protection
6 50/51G1.t_Op 0.3 s The time setting of the No.1 stage 1 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC1 protection.
7 50/51G1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
8 50/51G1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC1 protection
14
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 15 REV A05
9 50/51G1.En 1 The logic setting of the No.1 stage 1 zero sequence overcurrent protection
10 50/51G1.OutMap 0005 The output matrix setting of the No.1 stage 1 zero sequence overcurrent protection
11 50/51G2.3I0_Set 30 A The current setting of the No.1 stage 2 zero sequence overcurrent protection
12 50/51G2.t_Op 10 s The time setting of the No.1 stage 2 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC2 protection.
13 50/51G2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
14 50/51G2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC2 protection
15 50/51G2.En 0 The logic setting of the No.1 stage 2 zero sequence overcurrent protection
16 50/51G2.OutMap 0 The output matrix setting of the No.1 stage 2 zero sequence overcurrent protection
17 50/51G3.3I0_Set 30 A The current setting of the No.1 stage 3 zero sequence overcurrent protection
18 50/51G3.t_Op 10 s The time setting of the No.1 stage 3 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC3 protection.
19 50/51G3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51G3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC3 protection
21 50/51G3.En 0 The logic setting of the No.1 stage 3 zero sequence overcurrent protection
22 50/51G3.OutMap 0 The output matrix setting of the No.1 stage 3 zero sequence overcurrent protection
23 50/51G3.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for the No.1 ROC3 protection
24 50/51G3.TMS 1 The time multiplier setting of the No.1 stage 3 zero sequence IDMT overcurrent protection
15
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 16 REV A05
25 50/51G3.tmin 10 s The minimum operation time setting of the No.1 stage 3 zero sequence IDMT overcurrent protection
26 50/51G3.K 0.14 Constant “k” for the No.1 stage 3 zero sequence IDMT overcurrent protection
27 50/51G3.C 0 Constant “C” for the No.1 stage 3 zero sequence IDMT overcurrent protection
28 50/51G3.Alpha 1 Constant “α” for the No.1 stage 3 zero sequence IDMT overcurrent protection
29 50/51G4.3I0_Set 0.125 A The current setting of the No.1 stage 4 zero sequence overcurrent protection
30 50/51G4.t_Op 0.3 s The time setting of the No.1 stage 4 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC4 protection.
31 50/51G4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
32 50/51G4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC4 protection
33 50/51G4.En 1 The logic setting of the No.1 stage 4 zero sequence overcurrent protection
34 50/51G4.OutMap 0005 The output matrix setting of the No.1 stage 4 zero sequence overcurrent protection
35 50/51G4.Opt_Curve 1 The setting is for selecting the inverse time characteristic curve for the No.1 ROC4 protection
36 50/51G4.TMS 0.1 The time multiplier setting of the No.1 stage 4 zero sequence IDMT overcurrent protection
37 50/51G4.tmin 0.02 s The minimum operation time setting of the No.1 stage 4 zero sequence IDMT overcurrent protection
38 50/51G4.K 0.14 Constant “k” for the No.1 stage 4 zero sequence IDMT overcurrent protection
39 50/51G4.C 0 Constant “C” for the No.1 stage 4 zero sequence IDMT overcurrent protection
40 50/51G4.Alpha 0.02 Constant “α” for the No.1 stage 4 zero sequence IDMT overcurrent protection
41 50/51G5.3I0_Set / A The current setting of the No.1 stage 5 zero sequence overcurrent protection
16
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 17 REV A05
42 50/51G5.t_Op / s The time setting of the No.1 stage 5 zero sequence overcurrent protection
43 50/51G5.En 0 The logic setting of the No.1 stage 5 zero sequence overcurrent protection
44 50/51G6.3I0_Set / A The current setting of the No.1 stage 6 zero sequence overcurrent protection
45 50/51G6.t_Op / s The time setting of the No.1 stage 6 zero sequence overcurrent protection
46 50/51G6.En 0 The logic setting of the No.1 stage 6 zero sequence overcurrent protection
System Settings
No. Item Value Unit Remark
17
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 18 REV A05
18
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 19 REV A05
1 50/51P.U2_VCE 4.62 V The voltage setting of the negative sequence voltage blocking element (phase voltage)
2 50/51P.Upp_VCE 70 V The voltage setting of the low voltage blocking element (phase-tophase voltage)
50/51P.En_VCE_CrossCtr
3 0 The logic setting of the external voltage control function
l
4 50/51P.RCA / ° The relay characteristic angle for the directional overcurrent protection
The logic setting of the function which can block the OC protection related voltage measurement when the
5 50/51P.En_VTS_Blk 0
voltage transformer is failed
6 50/51P.K_Hm2 0 The percent setting of the harmonic blocking element for OC protection
7 50/51P.I_Rls_HmBlk / A The current setting for releasing the harmonic blocking element of OC protection
11 50/51P1.En_VCE 0 The logic setting of the voltage control element for the stage 1 overcurrent protection
The setting is used to select the directional mode for the stage 1 overcurrent protection.
12 50/51P1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
13 50/51P1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 1 overcurrent protection
19
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 20 REV A05
18 50/51P2.En_VCE 0 The logic setting of the voltage control element for the stage 2 overcurrent protection
The setting is used to select the directional mode for the stage 2 overcurrent protection.
19 50/51P2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51P2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 2 overcurrent protection
25 50/51P3.En_VCE 0 The logic setting of the voltage control element for the stage 3 overcurrent protection
The setting is used to select the directional mode for the stage 3 overcurrent protection.
26 50/51P3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
27 50/51P3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 3 overcurrent protection
30 50/51P3.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for OC3 protection
31 50/51P3.TMS 1 The time multiplier setting of the stage 3 IDMT overcurrent protection
32 50/51P3.tmin 10 s The minimum operation time setting of the stage 3 IDMT overcurrent protection
33 50/51P3.K 0.14 Constant “k” for the stage 3 IDMT overcurrent protection
34 50/51P3.C 0 Constant “C” for the stage 3 IDMT overcurrent protection
35 50/51P3.Alpha 0.02 Constant “α” for the stage 3 IDMT overcurrent protection
36 50/51P4.I_Set 2 A The current setting of the stage 4 overcurrent protection
37 50/51P4.t_Op 0.3 s The time setting of the stage 4 overcurrent protection
20
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 21 REV A05
38 50/51P4.En_VCE 0 The logic setting of the voltage control element for the stage 4 overcurrent protection
The setting is used to select the directional mode for the stage 4 overcurrent protection.
39 50/51P4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
40 50/51P4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 4 overcurrent protection
43 50/51P4.Opt_Curve 1 The setting is for selecting the inverse time characteristic curve for OC4 protection
44 50/51P4.TMS 0.06 The time multiplier setting of the stage 4 IDMT overcurrent protection
45 50/51P4.tmin 0.02 s The minimum operation time setting of the stage 4 IDMT overcurrent protection
46 50/51P4.K 0.14 Constant “k” for the stage 4 IDMT overcurrent protection
47 50/51P4.C 0 Constant “C” for the stage 4 IDMT overcurrent protection
48 50/51P4.Alpha 0.02 Constant “α” for the stage 4 IDMT overcurrent protection
49 50/51P5.I_Set / A The current setting of the stage 5 overcurrent protection
50 50/51P5.t_Op / s The time setting of the stage 5 overcurrent protection
51 50/51P5.En 0 The logic setting of the stage 5 overcurrent protection
52 50/51P6.I_Set / A The current setting of the stage 6 overcurrent protection
53 50/51P6.t_Op / s The time setting of the stage 6 overcurrent protection
54 50/51P6.En 0 The logic setting of the stage 6 overcurrent protection
55 50/51P.I_CCE / A The current setting of the heavy current blocking element for the overcurrent protection
56 50/51P.En_CCE 0 The logic setting of the heavy current blocking element for the overcurrent protection
21
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 22 REV A05
1 50/51G.RCA / ° The relay characteristic angle for the No.1 directional zero sequence overcurrent protection
The logic setting of the function which blocks the No.1 ROC protection related voltage measurement when
2 50/51G.En_VTS_Blk 0
the voltage transformer is failed
3 50/51G.K_Hm2 0 The percent setting of the harmonic blocking element for the No.1 ROC protection
4 50/51G.3I0_Rls_HmBlk / A The current setting for releasing the harmonic blocking element of the No.1 ROC protection
5 50/51G1.3I0_Set 0.2 A The current setting of the No.1 stage 1 zero sequence overcurrent protection
6 50/51G1.t_Op 0 s The time setting of the No.1 stage 1 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC1 protection.
7 50/51G1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
8 50/51G1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC1 protection
9 50/51G1.En 1 The logic setting of the No.1 stage 1 zero sequence overcurrent protection
10 50/51G1.OutMap 0005 The output matrix setting of the No.1 stage 1 zero sequence overcurrent protection
11 50/51G2.3I0_Set 30 A The current setting of the No.1 stage 2 zero sequence overcurrent protection
12 50/51G2.t_Op 10 s The time setting of the No.1 stage 2 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC2 protection.
13 50/51G2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
14 50/51G2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC2 protection
15 50/51G2.En 0 The logic setting of the No.1 stage 2 zero sequence overcurrent protection
16 50/51G2.OutMap 0 The output matrix setting of the No.1 stage 2 zero sequence overcurrent protection
22
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 23 REV A05
17 50/51G3.3I0_Set 30 A The current setting of the No.1 stage 3 zero sequence overcurrent protection
18 50/51G3.t_Op 10 s The time setting of the No.1 stage 3 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC3 protection.
19 50/51G3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51G3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC3 protection
21 50/51G3.En 0 The logic setting of the No.1 stage 3 zero sequence overcurrent protection
22 50/51G3.OutMap 0 The output matrix setting of the No.1 stage 3 zero sequence overcurrent protection
23 50/51G3.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for the No.1 ROC3 protection
24 50/51G3.TMS 1 The time multiplier setting of the No.1 stage 3 zero sequence IDMT overcurrent protection
25 50/51G3.tmin 10 s The minimum operation time setting of the No.1 stage 3 zero sequence IDMT overcurrent protection
26 50/51G3.K 0.14 Constant “k” for the No.1 stage 3 zero sequence IDMT overcurrent protection
27 50/51G3.C 0 Constant “C” for the No.1 stage 3 zero sequence IDMT overcurrent protection
28 50/51G3.Alpha 1 Constant “α” for the No.1 stage 3 zero sequence IDMT overcurrent protection
29 50/51G4.3I0_Set 0.1 A The current setting of the No.1 stage 4 zero sequence overcurrent protection
30 50/51G4.t_Op 0.1 s The time setting of the No.1 stage 4 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC4 protection.
31 50/51G4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
32 50/51G4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC4 protection
23
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 24 REV A05
33 50/51G4.En 1 The logic setting of the No.1 stage 4 zero sequence overcurrent protection
34 50/51G4.OutMap 0005 The output matrix setting of the No.1 stage 4 zero sequence overcurrent protection
35 50/51G4.Opt_Curve 1 The setting is for selecting the inverse time characteristic curve for the No.1 ROC4 protection
36 50/51G4.TMS 0.06 The time multiplier setting of the No.1 stage 4 zero sequence IDMT overcurrent protection
37 50/51G4.tmin 0.02 s The minimum operation time setting of the No.1 stage 4 zero sequence IDMT overcurrent protection
38 50/51G4.K 0.14 Constant “k” for the No.1 stage 4 zero sequence IDMT overcurrent protection
39 50/51G4.C 0 Constant “C” for the No.1 stage 4 zero sequence IDMT overcurrent protection
40 50/51G4.Alpha 0.02 Constant “α” for the No.1 stage 4 zero sequence IDMT overcurrent protection
41 50/51G5.3I0_Set / A The current setting of the No.1 stage 5 zero sequence overcurrent protection
42 50/51G5.t_Op / s The time setting of the No.1 stage 5 zero sequence overcurrent protection
43 50/51G5.En 0 The logic setting of the No.1 stage 5 zero sequence overcurrent protection
44 50/51G6.3I0_Set / A The current setting of the No.1 stage 6 zero sequence overcurrent protection
45 50/51G6.t_Op / s The time setting of the No.1 stage 6 zero sequence overcurrent protection
46 50/51G6.En 0 The logic setting of the No.1 stage 6 zero sequence overcurrent protection
24
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 25 REV A05
System Settings
No. Item Value Unit Remark
1 Active_Grp 1 The active setting group number
2 Opt_SysFreq 0 Select the rated system frequency: “0”, 50Hz; “1”, 60Hz
3 PrimaryEquip_Name / The name of the protected primary equipment
4 Prot.I1n 75 A Rated primary value of protection phase CT
5 Prot.I2n 1 A Rated secondary value of protection phase CT
6 Measmt.I1n 75 A Rated primary value of metering phase CT
7 Measmt.I2n 1 A Rated secondary value of metering phase CT
8 Neu1.I1n 75 A Rated primary value of the No.1 zero sequence CT
9 Neu1.I2n 1 A Rated secondary value of the No.1 zero sequence CT
10 Neu2.I1n / A Rated primary value of the No.2 zero sequence CT
11 Neu2.I2n 1 A Rated secondary value of the No.2 zero sequence CT
12 SEF.I1n / A Rated primary value of sensitive zero sequence CT
25
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 26 REV A05
1 50/51P.U2_VCE 4.62 V The voltage setting of the negative sequence voltage blocking element (phase voltage)
2 50/51P.Upp_VCE 70 V The voltage setting of the low voltage blocking element (phase-tophase voltage)
4 50/51P.RCA / ° The relay characteristic angle for the directional overcurrent protection
The logic setting of the function which can block the OC protection related voltage
5 50/51P.En_VTS_Blk 0
measurement when the voltage transformer is failed
6 50/51P.K_Hm2 0 The percent setting of the harmonic blocking element for OC protection
7 50/51P.I_Rls_HmBlk / A The current setting for releasing the harmonic blocking element of OC protection
26
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 27 REV A05
11 50/51P1.En_VCE 0 The logic setting of the voltage control element for the stage 1 overcurrent protection
The setting is used to select the directional mode for the stage 1 overcurrent protection.
12 50/51P1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
13 50/51P1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 1 overcurrent protection
18 50/51P2.En_VCE 0 The logic setting of the voltage control element for the stage 2 overcurrent protection
The setting is used to select the directional mode for the stage 2 overcurrent protection.
19 50/51P2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51P2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 2 overcurrent protection
25 50/51P3.En_VCE 0 The logic setting of the voltage control element for the stage 3 overcurrent protection
27
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 28 REV A05
The setting is used to select the directional mode for the stage 3 overcurrent protection.
26 50/51P3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
27 50/51P3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 3 overcurrent protection
30 50/51P3.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for OC3 protection
31 50/51P3.TMS 1 The time multiplier setting of the stage 3 IDMT overcurrent protection
32 50/51P3.tmin 10 s The minimum operation time setting of the stage 3 IDMT overcurrent protection
33 50/51P3.K 0.14 Constant “k” for the stage 3 IDMT overcurrent protection
34 50/51P3.C 0 Constant “C” for the stage 3 IDMT overcurrent protection
35 50/51P3.Alpha 0.02 Constant “α” for the stage 3 IDMT overcurrent protection
36 50/51P4.I_Set 0.1 A The current setting of the stage 4 overcurrent protection
37 50/51P4.t_Op 0.3 s The time setting of the stage 4 overcurrent protection
38 50/51P4.En_VCE 0 The logic setting of the voltage control element for the stage 4 overcurrent protection
The setting is used to select the directional mode for the stage 4 overcurrent protection.
39 50/51P4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
40 50/51P4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the stage 4 overcurrent protection
43 50/51P4.Opt_Curve 1 The setting is for selecting the inverse time characteristic curve for OC4 protection
44 50/51P4.TMS 0.15 The time multiplier setting of the stage 4 IDMT overcurrent protection
45 50/51P4.tmin 0.02 s The minimum operation time setting of the stage 4 IDMT overcurrent protection
28
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 29 REV A05
46 50/51P4.K 0.14 Constant “k” for the stage 4 IDMT overcurrent protection
47 50/51P4.C 0 Constant “C” for the stage 4 IDMT overcurrent protection
48 50/51P4.Alpha 0.02 Constant “α” for the stage 4 IDMT overcurrent protection
49 50/51P5.I_Set / A The current setting of the stage 5 overcurrent protection
50 50/51P5.t_Op / s The time setting of the stage 5 overcurrent protection
51 50/51P5.En 0 The logic setting of the stage 5 overcurrent protection
52 50/51P6.I_Set / A The current setting of the stage 6 overcurrent protection
53 50/51P6.t_Op / s The time setting of the stage 6 overcurrent protection
54 50/51P6.En 0 The logic setting of the stage 6 overcurrent protection
55 50/51P.I_CCE / A The current setting of the heavy current blocking element for the overcurrent protection
56 50/51P.En_CCE 0 The logic setting of the heavy current blocking element for the overcurrent protection
1 50/51G.RCA / ° The relay characteristic angle for the No.1 directional zero sequence overcurrent protection
The logic setting of the function which blocks the No.1 ROC protection related voltage
2 50/51G.En_VTS_Blk 0
measurement when the voltage transformer is failed
3 50/51G.K_Hm2 0 The percent setting of the harmonic blocking element for the No.1 ROC protection
4 50/51G.3I0_Rls_HmBlk / A The current setting for releasing the harmonic blocking element of the No.1 ROC protection
5 50/51G1.3I0_Set 30 A The current setting of the No.1 stage 1 zero sequence overcurrent protection
6 50/51G1.t_Op 10 s The time setting of the No.1 stage 1 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC1 protection.
7 50/51G1.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
29
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 30 REV A05
8 50/51G1.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC1 protection
9 50/51G1.En 0 The logic setting of the No.1 stage 1 zero sequence overcurrent protection
10 50/51G1.OutMap 0 The output matrix setting of the No.1 stage 1 zero sequence overcurrent protection
11 50/51G2.3I0_Set 30 A The current setting of the No.1 stage 2 zero sequence overcurrent protection
12 50/51G2.t_Op 10 s The time setting of the No.1 stage 2 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC2 protection.
13 50/51G2.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
14 50/51G2.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC2 protection
15 50/51G2.En 0 The logic setting of the No.1 stage 2 zero sequence overcurrent protection
16 50/51G2.OutMap 0 The output matrix setting of the No.1 stage 2 zero sequence overcurrent protection
17 50/51G3.3I0_Set 30 A The current setting of the No.1 stage 3 zero sequence overcurrent protection
18 50/51G3.t_Op 10 s The time setting of the No.1 stage 3 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC3 protection.
19 50/51G3.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
20 50/51G3.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC3 protection
21 50/51G3.En 0 The logic setting of the No.1 stage 3 zero sequence overcurrent protection
22 50/51G3.OutMap 0 The output matrix setting of the No.1 stage 3 zero sequence overcurrent protection
The setting is for selecting the inverse time characteristic curve for the No.1 ROC3
23 50/51G3.Opt_Curve 0
protection
30
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 31 REV A05
24 50/51G3.TMS 1 The time multiplier setting of the No.1 stage 3 zero sequence IDMT overcurrent protection
The minimum operation time setting of the No.1 stage 3 zero sequence IDMT overcurrent
25 50/51G3.tmin 10 s
protection
26 50/51G3.K 0.14 Constant “k” for the No.1 stage 3 zero sequence IDMT overcurrent protection
27 50/51G3.C 0 Constant “C” for the No.1 stage 3 zero sequence IDMT overcurrent protection
28 50/51G3.Alpha 1 Constant “α” for the No.1 stage 3 zero sequence IDMT overcurrent protection
29 50/51G4.3I0_Set 0.05 A The current setting of the No.1 stage 4 zero sequence overcurrent protection
30 50/51G4.t_Op 0.2 s The time setting of the No.1 stage 4 zero sequence overcurrent protection
The setting is used to select the directional mode for the No.1 ROC4 protection.
31 50/51G4.Opt_Dir 0
0: Non-directional; 1: Forward directional; 2: Reverse directional
32 50/51G4.En_Hm_Blk 0 The logic setting of the harmonic blocking element for the No.1 ROC4 protection
33 50/51G4.En 1 The logic setting of the No.1 stage 4 zero sequence overcurrent protection
34 50/51G4.OutMap 0005 The output matrix setting of the No.1 stage 4 zero sequence overcurrent protection
The setting is for selecting the inverse time characteristic curve for the No.1 ROC4
35 50/51G4.Opt_Curve 1
protection
36 50/51G4.TMS 0.1 The time multiplier setting of the No.1 stage 4 zero sequence IDMT overcurrent protection
The minimum operation time setting of the No.1 stage 4 zero sequence IDMT overcurrent
37 50/51G4.tmin 0.02 s
protection
38 50/51G4.K 0.14 Constant “k” for the No.1 stage 4 zero sequence IDMT overcurrent protection
39 50/51G4.C 0 Constant “C” for the No.1 stage 4 zero sequence IDMT overcurrent protection
31
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 32 REV A05
40 50/51G4.Alpha 0.02 Constant “α” for the No.1 stage 4 zero sequence IDMT overcurrent protection
41 50/51G5.3I0_Set / A The current setting of the No.1 stage 5 zero sequence overcurrent protection
42 50/51G5.t_Op / s The time setting of the No.1 stage 5 zero sequence overcurrent protection
43 50/51G5.En 0 The logic setting of the No.1 stage 5 zero sequence overcurrent protection
44 50/51G6.3I0_Set / A The current setting of the No.1 stage 6 zero sequence overcurrent protection
45 50/51G6.t_Op / s The time setting of the No.1 stage 6 zero sequence overcurrent protection
46 50/51G6.En 0 The logic setting of the No.1 stage 6 zero sequence overcurrent protection
32
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 33 REV A05
System Settings
No. Item Value Unit Remark
1 Active_Grp The active setting group number
2 Opt_SysFreq 1 Select the rated system frequency: “0”, 50Hz; “1”, 60Hz
3 PrimaryEquip_Name The name of the protected primary equipment
4 Prot.I1n 100 A Rated primary value of protection phase CT
5 Prot.I2n 1 A Rated secondary value of protection phase CT
6 Neu1.I1n 0 A Rated primary value of the No.1 zero sequence CT
7 Neu1.I2n 1 A Rated secondary value of the No.1 zero sequence CT
8 Prot.U1n 33 kV Rated primary value of protection VT
9 Prot.U2n 100 V Rated secondary value of protection VT
10 U1n_Tap 0 kV Rated primary value of tapped-point VT
11 U2n_Tap 0 V Rated secondary value of tapped-point VT
12 60P1.I1n 5 A Rated primary value of the No.1 unbalance CT
13 60P1.I2n 1 A Rated secondary value of the No.1 unbalance CT
14 60P2.I1n 5 A Rated primary value of the No.2 unbalance CT
15 60P2.I2n 1 A Rated secondary value of the No.2 unbalance CT
16 60P3.I1n 5 A Rated primary value of the No.3 unbalance CT
17 60P3.I2n 1 A Rated secondary value of the No.3 unbalance CT
18 Opt_3I0 1 Zero sequence current is self calculated
33
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 34 REV A05
17 50/51P4.Opt_Curve 0 The setting is for selecting the inverse time characteristic curve for OC4 protection
18 50/51P4.TMS 100 The time multiplier setting of the stage 4 IDMT overcurrent protection
19 50/51P4.tmin 100 s The minimum operation time setting of the stage 4 IDMT overcurrent protection
20 50/51P4.K 120 Constant “k” for the stage 4 IDMT overcurrent protection
21 50/51P4.C 1 Constant “C” for the stage 4 IDMT overcurrent protection
34
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 35 REV A05
5 Alm_DOC1_1.I_Set 0.046 A The current setting of the stage 1 alarm function of the No.1 unbalance current protection
6 Alm_DOC1_1.I_Op 10 s The time setting of the stage 1 alarm function of the No.1 unbalance current protection
7 Alm_DOC1_1.En 1 The logic setting of the stage 1 alarm function of the No.1 unbalance current protection
8 Alm_DOC1_2.I_Set 30 A The current setting of the stage 2 alarm function of the No.1 unbalance current protection
9 Alm_DOC1_2.I_Op 100 s The time setting of the stage 2 alarm function of the No.1 unbalance current protection
10 Alm_DOC1_2.En 0 The logic setting of the stage 2 alarm function of the No.1 unbalance current protection
11 60P2.I_Set 0.255 A The current setting of the No.2 unbalance current protection
35
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 36 REV A05
12 60P2.t_Op 0.2 s The time setting of the No.2 unbalance current protection
13 60P2.En 1 The logic setting of the No.2 unbalance current protection
14 60P2.OutMap 000D The output matrix setting of the No.2 unbalance current protection
15 Alm_DOC2_1.I_Set 0.046 A The current setting of the stage 1 alarm function of the No.2 unbalance current protection
16 Alm_DOC2_1.I_Op 10 s The time setting of the stage 1 alarm function of the No.2 unbalance current protection
17 Alm_DOC2_1.En 1 The logic setting of the stage 1 alarm function of the No.2 unbalance current protection
18 Alm_DOC2_2.I_Set 30 A The current setting of the stage 2 alarm function of the No.2 unbalance current protection
19 Alm_DOC2_2.I_Op 100 s The time setting of the stage 2 alarm function of the No.2 unbalance current protection
20 Alm_DOC2_2.En 0 The logic setting of the stage 2 alarm function of the No.2 unbalance current protection
21 60P3.I_Set 0.17 A The current setting of the No.3 unbalance current protection
22 60P3.t_Op 10 s The time setting of the No.3 unbalance current protection
23 60P3.En 1 The logic setting of the No.3 unbalance current protection
24 60P3.OutMap 0000 The output matrix setting of the No.3 unbalance current protection
25 Alm_DOC3_1.I_Set 0.046 A The current setting of the stage 1 alarm function of the No.3 unbalance current protection
26 Alm_DOC3_1.I_Op 10 s The time setting of the stage 1 alarm function of the No.3 unbalance current protection
27 Alm_DOC3_1.En 1 The logic setting of the stage 1 alarm function of the No.3 unbalance current protection
28 Alm_DOC3_2.I_Set 30 A The current setting of the stage 2 alarm function of the No.3 unbalance current protection
29 Alm_DOC3_2.I_Op 100 s The time setting of the stage 2 alarm function of the No.3 unbalance current protection
30 Alm_DOC3_2.En 0 The logic setting of the stage 2 alarm function of the No.3 unbalance current protection
36
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 37 REV A05
3 49.C_Disspt 1 The thermal dissipation constant setting of the thermal overload protection
4 49.K_Trp 1.03 The factor setting of the thermal overload protection which is associated to the thermal state formula
5 49.K_Alm 1.0 The factor setting of the thermal overload alarm element which is associated to the thermal state formula
6 49.En_Trp 0 The logic setting of the thermal overload protection for tripping
7 49.En_Alm 1 The logic setting of the thermal overload protection for alarming
8 49.OutMap 000D The output matrix setting of the thermal overload protection
VoltProt_Settings Editor
Uni
No. Item Value Description
t
The setting for selecting the undervoltage protection calculation method
1 27P.Opt_1P/3P 0 0: all of the three voltage must be less than the setting;
1: anyone of the three voltage must be less than the setting.
The setting for selecting the voltage input mode for the undervoltage protection
2 27P.Opt_Up/Upp 0
0: phase voltage; 1: phase-to-phase voltage
37
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 38 REV A05
The setting for selecting the voltage input mode for the overvoltage protection
14 59P.Opt_Up/Upp 0
0: phase voltage; 1: phase-to-phase voltage
38
CLIENT & PROJECT ETHIOPIAN ELECTRIC POWER (EEP)& CONTRACT AKAKBL-LOT1
CONSULTANT TRANSMISSION & SUBSTATIONENGINEERING OFFICE, EEP
CONTRACTOR TBEA Co.,Ltd.
CONTRACT NO. CO/33.20/124/08 DOCUMENT NO. BOLE-DD-EL-CC-317A SHEET 39 REV A05
39