You are on page 1of 20

DAFTAR ISI PROPOSAL SETTING GI 150kV TANJUNG BUNGA.

GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2

No Description Page

I Bay OHL PUNAGAYA 1 dan 2


I.1 Daftar Data Setting Rele ….............................................................. 2
I.2 Perhitungan Rele Proteksi Distance ….............................................................. 3
I.3 Parameter Setting Rele 7SA87 Distance ….............................................................. 8
I.4 Perhitungan Rele Proteksi Overcurrent ….............................................................. 17
I.5 Parameter Setting Rele 7SJ82 Overcurrent ….............................................................. 18

II Lampiran
II.1 Diagram Proteksi PUNAGAYA 1 ….............................................................. 19
II.2 Diagram Proteksi PUNAGAYA 2 ….............................................................. 20
PT PLN (PERSERO)
PENYALURAN DAN PUSAT PENGATUR BEBAN

DATA FOR SETTING RELAY CALCULATION


GI 150kV TANJUNG BUNGA.
Bay Name : BAY OHL PUNAGAYA 1 DAN 2

No. Set protection Protection Type Data check remark

1 Distance Diagram Proteksi : (3) QTEP0102-TBG01-S001


Protection Calculation Note : (4) QTEP0102-TBG33-S001
21 Relay Type : Siemens 7SA52
- CT Ratio : 2000/5A, CL PX
- Vknee :
- Rct :
- Rlead :
Overhead line or Cable : SUTT
Type of Conductor : 2 x ACSR 450 Sqmm
Length of Conductor : 59km
Charging Current :
Constanta :
- Positive Sequence : 0.0387+j0.2581 ohm/km
- Zero Sequence : 0.4479+j1.3244
- CCC : 1620A

OCR/GFR Diagram Proteksi : (3) QTEP0102-TBG01-S001


150 kV Calculation Note : (4) QTEP0102-TBG33-S002
51/51N Rasio CT : 2000/5A, CL 5P20, 30VA
Relay Type : 7SJ82
Nominal Current : 5A

Syncrocheck Diagram Proteksi : (3) QTEP0102-TBG01-S001


25 Calculation Note : (4) QTEP0102-TBG33-S001
Rasio PT : 150kV / 110V
Relay Type : 7SA52 For BCM
Nominal Voltage : 110V

Autorecloser Diagram Proteksi : (3) QTEP0102-TBG01-S001


79 Calculation Note : (4) QTEP0102-TBG33-S001
Relay Type : 7SA52
Nominal Current : 5A

Daftar Data Setting


Bay OHL DIPASENA 1 DAN 2 2 of 18
DISTANCE PROTECTION RELAY

Designation : -F210
Relay Type : Siemens 7SA52
Rated Current : In = 5A
Rated Voltage : Vn = 110 V

1 System Data
Line Length Ln = 59.000 km
Tegangan Nominal Vn = 150 kV
CT Ratio Ct = 2000 / 5A CT = 400
PT Ratio PT = 150000 / 110 V PT = 1364
Freqwency f = 50 Hz

Jenis Penghantar : SUTT 2 x ACSR 450 Sqmm


CCC : 1620 A 4.1 sekunder

Positive Impedance based on data: R1 = 0.0387 ohm/km


X1 = 0.287 ohm/km
Z1 = 0.2895975 ohm/km

Zero Impedance based on data : R0 = 0.4479 ohm/km


X0 = 1.3244 ohm/km
Z0 = 1.3980879 ohm/km

Line angle
Calculate the setting value for the parameter Line angle from the line constants for
the line to be protected as follows:

where:
RL R L Resistance of the line to be protected
XL X L Reactance of the line to be protected

tan ϕ = 7.42 ϕ = 82.320375 °

Konstanta kn = CT/PT kn = 0.2933

Impedansi positive SUTT RFL1 = R1 * Ln * k = 0.6698 sekunder


XFL1 = X1*Ln*k = 4.9670 sekunder
ZFL1 = Abs (R1 + j X1) = 5.0120 sekunder
Zero Squence Impedance

Impedansi nol SUTT RFL0 = R1 * Ln * k = 7.7517 sekunder


XFL0 = X1*Ln*k = 22.9209 sekunder
ZFL0 = Abs (R1 + j X1) = 24.1962 sekunder

Kr = 3.52
Kx = 1.20

. .
= ∗( . ± .
-1)

= 0.5951
ϑK0 = 2.62

Perhitungan Relay 21
Doc. No (4) QTEP0102-TBG33-S001 Bay OHL PUNAGAYA 1 DAN 2 3 of 18
DISTANCE PROTECTION RELAY
Minimum fault Current
Minumum fault current Ifmin on protected transmission line is the current of the phase to earth of nearest remote
terminal

Ifmin = I0 = I1 = I2 = Vs
(3 x Zs + Zo + Z1x2)

Vs = Voltage Source per phase = 150.0 kV


Zs= Impedance Source
Zo= Zero sequence impedance = 24.1962 Ohm
Z1= Positive Sequence impedance = 17.0863 Ohm
Isc Source Circuit Max = 40.00 kA

Zs= Vs = 2.1651 Ohm


1.732 x Isc

Ifmin = 2.3125 kA

Load Impedance Calclulation


To Prevent Unwanted Tripping caused by improper of fault detection during havy load, load impedance should be
calculated to determine load trapezoid charateristic thant can differentiate between heavy load current

R load prim= 0.9 * Un = 48.1139 Ohm primary


1.732 * I Max

I max = CCC ( Current carrying capacity ) = 1620 A

R load Sec = R load prim * K = 14.1134 Ohm sekunder

The spread angle of the load trapezoid characteristic ϕloadmust be greater (approx. 5°) than the maximum arising
load angle (corresponding to the minimum power factor cosϕ).
Assume minimum power factor
cosϕmin = 0.8
ϕph-E = = 36.87 degree
ϕph-ph = ϕph-E+5 = 41.87 degree

Assume:
Average tower base resistance 15 15 Ω
Grounding conductor 60 60 mm 2 steel
Distance: Phase-to-tower/phase-to-ground (mid-span) 3 m
Distance: phase-to-phase 5 m
Maximum fault resistance 250 Ω

Perhitungan Relay 21
Doc. No (4) QTEP0102-TBG33-S001 Bay OHL PUNAGAYA 1 DAN 2 4 of 18
DISTANCE PROTECTION RELAY
2 Perhitungan Setting Distance

S1 Line Impedance
S2 Arc impedance + opposite line Impedance
Assume arc impedance is 1.8750 ohm
Opposite Impedance 2 time line impedance

Zone 1 =0.85 * RFL

Zone 1 Mho for phase to phase fault ZZ1 = 4.2602 ohm

Zone 1 Quadlateral for phase to Phase fault RZ1 = 0.5693 ohm


XZ1 = 4.2220 ohm

Zone 1 Quadlateral for phase to neutral fault RZ0 = 6.5889 ohm

Zone 2 = (0.8 * ( RFL+ 0.85*RFL2))

Zone 1 Mho for phase to phase fault ZZ2 = 7.88 ohm

Zone 1 Quadlateral for phase to Phase fault RZ2 = 1.54 ohm


XZ2 = 7.81 ohm

Zone 1 Quadlateral for phase to neutral fault RZ2 = 12.19 ohm

Zone 3 = 1.2 * ( RFL+RFLopposite))

Zone 3 Mho for phase to phase fault ZZ3 = 18.0431 ohm

Zone 1 Quadlateral for phase to Phase fault RZ3 = 2.4112 ohm


XZ3 = 17.8812 ohm

Zone 1 Quadlateral for phase to Phase fault RZ3 = 27.9060 ohm

Perhitungan Relay 21
Doc. No (4) QTEP0102-TBG33-S001 Bay OHL PUNAGAYA 1 DAN 2 5 of 18
DISTANCE PROTECTION RELAY
Automatic Reclosing Function
For the cyclic automatic reclosing function, there are 4 operating modes, from which one can be selected for
the parameterization (parameter (_:6601:101) 79 operating mode).
The selection of the operating mode is dependent on the tripping behavior of the protection functions and the
circuit breaker.

The operating mode with op., with act. time allows different automatic reclosing cycles depending
on the tripping type and operate time of the protection function(s). With this operating mode, the automatic
reclosing must be started with the operate indications. Additionally, the general pickup must also be consid-
ered. With raising general pickup, the action times of the configured automatic reclosing cycles start. The general
pickup is in this connection the group indication of all internal protection functions configured for starting the
automatic reclosing and the external binary input for general pickup >Gen. pickup for start .
Through the time between the raising general pickup and clearing operate indication, the automatic reclosing
cycle to be started will be determined. Here for multiple automatic reclosing cycles, the sequence of the
expiring automatic reclosing cycles is not fixed, like the operating modes without action time.
parameter (_:6601:101) 79 operating mode With Op, with Action Time

Operating-Mode Signal Examples: With Tripping/With Action Time

Synchronization Function
The Synchronization function (ANSI 25) checks whether the activation is permissible without a risk to the
stability of the system when interconnecting 2 parts of an electrical power system. Typical applications are the
synchronization of a line and a busbar or the synchronization of 2 busbars via a cross-coupling. A power
transformer between the 2 measuring points can also be taken into consideration.
The following operating modes are covered:
• Synchrocheck • Switching asynchronous power systems
• Switching synchronous power systems • Switching to dead line line/busbar
In This setting, device only use for Synchrochek Function

The definition of the variables is important for understanding the following implementation. The reference side
1 indicates the function with 1. This yields the reference values voltage V1, frequency f1, and phase angle α1.
The side to be synchronized indicates the function with 2. The electrical variables of side 2 are then the
voltage V2, frequency f2, and phase angle α2.
When forming the differential variables, the function is oriented to the definition of the absolute measuring
error (Δ x = measured value – real value). The reference value and hence the real value is side 1. This results
in the following calculation specifications:
Differential voltage dV = V2 – V1
A positive sign means that the voltage V2 is greater than the voltage V1. In other cases, the sign is negative.
Differential frequency df = f2 – f1

Perhitungan Relay 21
Doc. No (4) QTEP0102-TBG33-S001 Bay OHL PUNAGAYA 1 DAN 2 6 of 18
DISTANCE PROTECTION RELAY

Connection Definition

A positive result means that according to the example from above Figure the busbar frequency is greater than
the line frequency.
Phase-angle difference dα = α2 – α1

Function Measured Values


The function measured values for the Synchronization function are displayed in their own primary, secondary
and percentage measured-value windows. Voltage measurements are always displayed as ph-ph voltages,
even if the associated measuring point records phase-to-ground voltages. The function measured values are
determined and displayed as soon as the device is functional. The difference values are calculated as soon
as the stage is activated.

Protection-Specific Values of the Synchronization

Recommande Value for Seeting : Secondary Value Primary Value


dV = V2 – V1 6V 9.0000 kV
df = f2 – f1 0.1 Hz 0.1000 Hz
dα = α2 – α1 10 deg 10.0000 deg

Perhitungan Relay 21
Doc. No (4) QTEP0102-TBG33-S001 Bay OHL PUNAGAYA 1 DAN 2 7 of 18
PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


General
103 Grp Chge OPTION Disabled Disabled Setting Group Change Option
Enabled
110 Trip mode 3pole only 1-/3pole Trip mode
1-/3pole
112 Phase Distance Quadrilateral MHO Phase Distance
MHO
Disabled
113 Earth Distance Quadrilateral Quadrilateral Earth Distance
MHO
Disabled
119 Iph>(Z1) Disabled Disabled Additional Threshold Iph>(Z1)
Enabled
120 Power Swing Disabled Enabled Power Swing detection
Enabled
121 Teleprot. Dist. PUTT (Z1B) PUTT (Z1B) Teleprotection for Distance prot.
POTT
UNBLOCKING
BLOCKING
SIGNALv.ProtInt
Disabled
122 DTT Direct Trip Disabled Disabled DTT Direct Transfer Trip
Enabled
124 SOTF Overcurr. Disabled Enabled Instantaneous HighSpeed SOTF
Enabled Overcurrent
125 Weak Infeed Disabled Disabled Weak Infeed (Trip and/or Echo)
Enabled
Logic no. 2
126 Back-Up O/C Disabled Disabled Backup overcurrent
TOC IEC
TOC ANSI
TOC IEC /w 3ST
131 Earth Fault O/C Disabled Definite Time Earth fault overcurrent
TOC IEC
TOC ANSI
TOC Logarithm.
Definite Time
U0 inverse
Sr inverse

132 Teleprot. E/F Dir.Comp.Pickup Dir.Comp.Pickup Teleprotection for Earth fault over-
SIGNALv.ProtInt curr.
UNBLOCKING
BLOCKING
Disabled
133 Auto Reclose 1 AR-cycle Disabled Auto-Reclose Function
2 AR-cycles
3 AR-cycles
4 AR-cycles
5 AR-cycles
6 AR-cycles
7 AR-cycles
8 AR-cycles
ADT
Disabled

134 AR control mode Pickup w/ Tact Trip w/ Tact Auto-Reclose control mode
Pickup w/o Tact
Trip w/ Tact
Trip w/o Tact
135 Synchro-Check Disabled Disabled Synchronism and Voltage Check
Enabled
136 FREQUENCY Prot. Disabled Disabled Over / Underfrequency Protection
Enabled

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 8 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


137 U/O VOLTAGE Disabled Disabled Under / Overvoltage Protection
Enabled
Enabl. w. comp.
138 Fault Locator Enabled Enabled Fault Locator
Disabled
with BCD-output
139 BREAKER FAILURE Disabled Disabled Breaker Failure Protection
Enabled
enabled w/ 3I0>
140 Trip Cir. Sup. Disabled Disabled Trip Circuit Supervision
1 trip circuit
2 trip circuits
3 trip circuits
145 P. INTERFACE 1 Enabled Disabled Protection Interface 1 (Port D)
Disabled
IEEE C37.94
146 P. INTERFACE 2 Disabled Disabled Protection Interface 2 (Port E)
Enabled
IEEE C37.94
147 NUMBER OF RELAY 2 relays 2 relays Number of relays
3 relays
Power System Data 1
201 CT Starpoint towards Line towards Line CT Starpoint
towards Busbar
203 Unom PRIMARY 1.0 .. 1200.0 kV 150.0 kV Rated Primary Voltage
204 Unom SECONDARY 80 .. 125 V 110 V Rated Secondary Voltage (Ph-Ph)
205 CT PRIMARY 10 .. 5000 A 2000 A CT Rated Primary Current
206 CT SECONDARY 1A 5A CT Rated Secondary Current
5A
207 SystemStarpoint Solid Earthed Solid Earthed System Starpoint is
Peterson-Coil
Isolated
210 U4 transformer Not connected Not connected U4 voltage transformer is
Udelta transf.
Usy2 transf.
Ux transformer
211 Uph / Udelta 0.10 .. 9.99 1.73 Matching ratio Phase-VT To
Open-Delta-VT
212 Usy2 connection L1-E L2-E VT connection for Usy2
L2-E
L3-E
L1-L2
L2-L3
L3-L1

214A ϕ Usy2-Usy1 0 .. 360 ° 0° Angle adjustment Usy2-Usy1


215 Usy1/Usy2 ratio 0.50 .. 2.00 1 Matching ratio Usy1 / Usy2
220 I4 transformer Not connected In prot. line I4 current transformer is
In prot. line
In paral. line
IY starpoint
221 I4/Iph CT 0.010 .. 5.000 1 Matching ratio I4/Iph for CT's
230 Rated Frequency 50 Hz 50 Hz Rated Frequency
60 Hz
235 PHASE SEQ. L1 L2 L3 L1 L2 L3 Phase Sequence
L1 L3 L2
236 Distance Unit km km Distance measurement unit
Miles
237 Format Z0/Z1 RE/RL, XE/XL RE/RL, XE/XL Setting format for zero seq.comp.
K0 format
238A EarthFltO/C 1p stages together stages together Earth Fault O/C: setting for 1pole
stages separat. AR
239 T-CB close 0.01 .. 0.60 sec 0.06 sec Closing (operating) time of CB
240A TMin TRIP CMD 0.02 .. 30.00 sec 0.10 sec Minimum TRIP Command Dura-
tion
241A TMax CLOSE CMD 0.01 .. 30.00 sec 0.10 sec Maximum Close Command Dura-

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 9 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


tion
242 T-CBtest-dead 0.00 .. 30.00 sec 0.10 sec Dead Time for CB test-autoreclo-
Power System Data 2
1103 FullScaleVolt. 1.0 .. 1200.0 kV 150.0 kV Measurement: Full Scale
Voltage (100%)
1104 FullScaleCurr. 10 .. 5000 A 2000 A Measurement: Full Scale
Current (100%)
1105 Line Angle 10 .. 89 ° 82 ° Line Angle
1107 P,Q sign not reversed not reversed P,Q operational measured
reversed values sign
1110 x' 1A 0.0050 .. 9.5000 Ω/km x' - Line Reactance per
length unit
5A 0.0010 .. 1.9000 Ω/km 0.287 Ω/km
1111 Line Length 0.1 .. 1000.0 km 59.0 km Line Length
1116 RE/RL(Z1) -0.33 .. 10.00 1.2 Zero seq. comp. factor
RE/RL for Z1
1117 XE/XL(Z1) -0.33 .. 10.00 3.52 Zero seq. comp. factor
XE/XL for Z1
1130A PoleOpenCurrent 1A 0.05 .. 1.00 A 0.10 A Pole Open Current
Threshold
5A 0.25 .. 5.00 A 0.50 A
1131A PoleOpenVoltage 2 .. 70 V 30 V Pole Open Voltage
Threshold
1132A SI Time all Cl. 0.01 .. 30.00 sec 0.05 sec Seal-in Time after ALL clo-
sures
1133A T DELAY SOTF 0.05 .. 30.00 sec 0.25 sec minimal time for line open
before SOTF
1134 Line Closure only with ManCl only with ManCl Recognition of Line Clo-
I OR U or ManCl sures with
CB OR I or M/C
I or Man.Close
1135 Reset Trip CMD CurrentOpenPole CurrentOpenPole RESET of Trip Command
Current AND CB
Pickup Reset
1136 OpenPoleDetect. OFF Current AND CB open pole detector
Current AND CB
w/ measurement
1140A I-CTsat. Thres. 1A 0.2 .. 50.0 A; ∞ 20.0 A CT Saturation Threshold
5A 1.0 .. 250.0 A; ∞ 100.0 A
1150A SI Time Man.Cl 0.01 .. 30.00 sec 0.30 sec Seal-in Time after
MANUAL closures
1151 MAN. CLOSE with Sync-check NO Manual CLOSE
w/o Sync-check COMMAND generation
NO
1152 Man.Clos. Imp. (Setting options depend None MANUAL Closure Impulse
on configuration) after CONTROL
1155 3pole coupling with PICKUP with TRIP 3 pole coupling
with TRIP
1156A Trip2phFlt 3pole 3pole Trip type with 2phase
1pole leading Ø faults
1pole lagging Ø
1211 Distance Angle 30 .. 90 ° 82 ° Angle of inclination, dis-
tance charact.
Distance Protection
1221A 2Ph-E faults Block leading Ø Block leading Ø Loop selection with 2Ph-E
Block lagging Ø faults
All loops
Ø-Ø loops only
Ø-E loops only
1223 Uph-ph unbal. 5 .. 50 % 0.25 Max Uph-ph unbal. for 1ph
Flt. detection
1232 SOTF zone PICKUP Inactive Instantaneous trip after
Zone Z1B SwitchOnToFault
Z1B undirect.
Zone Z1

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 10 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


Z1 undirect.
Inactive
1241 R load (Ø-E) 1A 0.100 .. 600.000 Ω; ∞ R load, minimum Load Im-
pedance (ph-e)
5A 0.020 .. 120.000 Ω; ∞ 14.113
1242 ϕ load (Ø-E) 20 .. 60 ° 36.87 ° PHI load, maximum Load
Angle (ph-e)
1243 R load (Ø-Ø) 1A 0.100 .. 600.000 Ω; ∞ R load, minimum Load Im-
pedance (ph-ph)
5A 0.020 .. 120.000 Ω; ∞ 14.113
1244 ϕ load (Ø-Ø) 20 .. 60 ° 41.87 ° PHI load, maximum Load
Angle (ph-ph)
1305 T1-1phase 0.00 .. 30.00 sec; ∞ 0 T1-1phase, delay for
single phase faults
1306 T1-multi-phase 0.00 .. 30.00 sec; ∞ 0 T1multi-ph, delay for multi
phase faults
1315 T2-1phase 0.00 .. 30.00 sec; ∞ 0.4 T2-1phase, delay for
single phase faults
1316 T2-multi-phase 0.00 .. 30.00 sec; ∞ 0.4 T2multi-ph, delay for multi
phase faults
1317A Trip 1pole Z2 NO NO Single pole trip for faults in
YES Z2
1325 T3 DELAY 0.00 .. 30.00 sec; ∞ 1.2 T3 delay
1335 T4 DELAY 0.00 .. 30.00 sec; ∞ ∞ T4 delay
1345 T5 DELAY 0.00 .. 30.00 sec; ∞ ∞ T5 delay
1355 T1B-1phase 0.00 .. 30.00 sec; ∞ 0 T1B-1phase, delay for
single ph. faults
1356 T1B-multi-phase 0.00 .. 30.00 sec; ∞ 0 T1B-multi-ph, delay for
multi ph. faults
1357 1st AR -> Z1B NO YES Z1B enabled before 1st
YES AR (int. or ext.)
1365 T6 DELAY 0.00 .. 30.00 sec; ∞ ∞ T6 delay

Quadrateral
1301 Op. mode Z1 Forward Forward Operating mode Z1
Reverse
Non-Directional
Inactive
1302 R(Z1) Ø-Ø 1A 0.050 .. 600.000 Ω R(Z1), Resistance for ph-
ph-faults
5A 0.010 .. 120.000 Ω 0.569 Ω
1303 X(Z1) 1A 0.050 .. 600.000 Ω X(Z1), Reactance
5A 0.010 .. 120.000 Ω 4.222 Ω
1304 RE(Z1) Ø-E 1A 0.050 .. 600.000 Ω RE(Z1), Resistance for ph-
e faults
5A 0.010 .. 120.000 Ω 6.589 Ω
1305 T1-1phase 0.00 .. 30.00 sec; ∞ 0.00 sec T1-1phase, delay for
single phase faults
1306 T1-multi-phase 0.00 .. 30.00 sec; ∞ 0.00 sec T1multi-ph, delay for multi
phase faults
1307 Zone Reduction 0 .. 45 ° 0° Zone Reduction Angle
(load compensation)
1308 Iph>(Z1) 1A 0.05 .. 20.00 A Minimum current for Z1
5A 0.25 .. 100.00 A 1.00 A only Iph>(Z1)

1311 Op. mode Z2 Forward Forward Operating mode Z2


Reverse
Non-Directional
Inactive
1312 R(Z2) Ø-Ø 1A 0.050 .. 600.000 Ω R(Z2), Resistance for ph-
ph-faults
5A 0.010 .. 120.000 Ω 1.537 Ω
1313 X(Z2) 1A 0.050 .. 600.000 Ω X(Z2), Reactance
5A 0.010 .. 120.000 Ω 7.811 Ω
1314 RE(Z2) Ø-E 1A 0.050 .. 600.000 Ω RE(Z2), Resistance for ph-

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 11 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


5A 0.010 .. 120.000 Ω 12.189 Ω e faults
1315 T2-1phase 0.00 .. 30.00 sec; ∞ 0.40 sec T2-1phase, delay for
single phase faults
1316 T2-multi-phase 0.00 .. 30.00 sec; ∞ 0.40 sec T2multi-ph, delay for multi
phase faults
1317A Trip 1pole Z2 NO NO Single pole trip for faults in
YES Z2
1321 Op. mode Z3 Forward Forward Operating mode Z3
Reverse
Non-Directional
Inactive
1322 R(Z3) Ø-Ø 1A 0.050 .. 600.000 Ω R(Z3), Resistance for ph-
5A 0.010 .. 120.000 Ω 2.411 Ω ph-faults
1323 X(Z3) 1A 0.050 .. 600.000 Ω X(Z3), Reactance
5A 0.010 .. 120.000 Ω 17.881 Ω
1324 RE(Z3) Ø-E 1A 0.050 .. 600.000 Ω RE(Z3), Resistance for ph-
5A 0.010 .. 120.000 Ω 27.906 Ω e faults
1325 T3 DELAY 0.00 .. 30.00 sec; ∞ 0.60 sec T3 delay
1331 Op. mode Z4 Forward Inactive Operating mode Z4
Reverse
Non-Directional
Inactive
1341 Op. mode Z5 Forward Inactive Operating mode Z5
Reverse
Non-Directional
Inactive
Mho
1305 T1-1phase 0.00 .. 30.00 sec; ∞ 0.00 sec T1-1phase, delay for
single phase faults
1306 T1-multi-phase 0.00 .. 30.00 sec; ∞ 0.00 sec T1multi-ph, delay for multi
phase faults
1308 Iph>(Z1) 1A 0.05 .. 20.00 A Minimum current for Z1
5A 0.25 .. 100.00 A 0.5 A only Iph>(Z1)
1315 T2-1phase 0.00 .. 30.00 sec; ∞ 0.40 sec T2-1phase, delay for
single phase faults
1316 T2-multi-phase 0.00 .. 30.00 sec; ∞ 0.40 sec T2multi-ph, delay for multi
phase faults
1317A Trip 1pole Z2 NO NO Single pole trip for faults in
YES Z2
1325 T3 DELAY 0.00 .. 30.00 sec; ∞ 1.2 sec T3 delay
1335 T4 DELAY 0.00 .. 30.00 sec; ∞ ∞ sec T4 delay
1345 T5 DELAY 0.00 .. 30.00 sec; ∞ ∞ sec T5 delay
1355 T1B-1phase 0.00 .. 30.00 sec; ∞ ∞ sec T1B-1phase, delay for
single ph. faults
1356 T1B-multi-phase 0.00 .. 30.00 sec; ∞ 0.00 sec T1B-multi-ph, delay for
multi ph. faults
1357 1st AR -> Z1B NO YES Z1B enabled before 1st
YES AR (int. or ext.)
1365 T6 DELAY 0.00 .. 30.00 sec; ∞ ∞ sec T6 delay
1401 Op. mode Z1 Forward Forward Operating mode Z1
Reverse
Inactive
1402 ZR(Z1) 1A 0.050 .. 200.000 Ω ZR(Z1), Impedance Reach
5A 0.010 .. 40.000 Ω 4.260 Ω
1411 Op. mode Z2 Forward Forward Operating mode Z2
Reverse
Inactive

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 12 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


1412 ZR(Z2) 1A 0.050 .. 200.000 Ω ZR(Z2), Impedance Reach
5A 0.010 .. 40.000 Ω 7.881 Ω
1421 Op. mode Z3 Forward Forward Operating mode Z3
Reverse
Inactive
1422 ZR(Z3) 1A 0.050 .. 200.000 Ω ZR(Z3), Impedance Reach
5A 0.010 .. 40.000 Ω 18.043 Ω
1431 Op. mode Z4 Forward Inactive Operating mode Z4
Reverse
Inactive
1441 Op. mode Z5 Forward Inactive Operating mode Z5
Reverse
Inactive
1451 Op. mode Z1B Forward Forward Operating mode Z1B (ex-
Reverse tended zone)
Inactive
1452 ZR(Z1B) 1A 0.050 .. 200.000 Ω ZR(Z1B), Impedance
5A 0.010 .. 40.000 Ω 6.011 Ω Reach
1461 Op. mode Z6 Forward Inactive Operating mode Z6
Reverse
Inactive
1471A Mem.Polariz.PhE 0.0 .. 100.0 % 0.15 Voltage Memory polariza-
tion (phase-e)
1472A CrossPolarizPhE 0.0 .. 100.0 % 0.15 Cross polarization (phase- e)
1473A Mem.Polariz.P-P 0.0 .. 100.0 % 0.15 Voltage Memory polariza-
tion (ph-ph)
1474A CrossPolarizP-P 0.0 .. 100.0 % 0.15 Cross polarization (phase-
phase)
Directional Ground Fault
3101 FCT EarthFltO/C ON ON Earth Fault overcurrent
OFF function
3102 BLOCK for Dist. every PICKUP every PICKUP Block E/F for Distance pro-
1phase PICKUP tection
multiph. PICKUP
NO
3103 BLOCK 1pDeadTim YES YES Block E/F for 1pole Dead
NO time
3104A Iph-STAB. Slope 0 .. 30 % 0.1 Stabilisation Slope with
Iphase
3105 3IoMin Teleprot 1A 0.01 .. 1.00 A 3Io-Min threshold for Tele-
prot. schemes
5A 0.05 .. 5.00 A 1A
3105 3IoMin Teleprot 1A 0.003 .. 1.000 A 3Io-Min threshold for Tele-
prot. schemes
5A 0.015 .. 5.000 A 1A
3109 Trip 1pole E/F YES YES Single pole trip with earth
NO flt.prot.
3110 Op. mode 3I0>>> Forward Inactive Operating mode
Reverse
Non-Directional
Inactive
3120 Op. mode 3I0>> Forward Inactive Operating mode
Reverse
Non-Directional
Inactive
3130 Op. mode 3I0> Forward Forward Operating mode
Reverse
Non-Directional
Inactive
3131 3I0> 1A 0.05 .. 25.00 A 3I0> Pickup
5A 0.25 .. 125.00 A 1.00 A

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 13 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


3132 T 3I0> 0.00 .. 30.00 sec; ∞ 0.90 sec T 3I0> Time Delay
3133 3I0> Telep/BI NO YES Instantaneous trip via Tele-
YES prot./BI
3134 3I0> SOTF-Trip NO NO Instantaneous trip after
YES SwitchOnToFault
3135 3I0> InrushBlk NO NO Inrush Blocking
YES
3136 BLK /1p 3I0> YES YES Block 3I0> during 1pole
No (non-dir.) dead time
Teleprotection for Distance prot.
2101 FCT Telep. Dis. ON PUTT (Z1B) Teleprotection for Distance pro-
PUTT (Z1B) tection
POTT
OFF
2102 Type of Line Two Terminals Two Terminals Type of Line
Three terminals
2103A Send Prolong. 0.00 .. 30.00 sec 0.05 sec Time for send signal prolongation
2107A Delay for alarm 0.00 .. 30.00 sec 10.00 sec Time Delay for Alarm
2108 Release Delay 0.000 .. 30.000 sec 0.000 sec Time Delay for release after
pickup
2109A TrBlk Wait Time 0.00 .. 30.00 sec; ∞ 0.04 sec Transient Block.: Duration exter-
nal flt.
2110A TrBlk BlockTime 0.00 .. 30.00 sec 0.05 sec Transient Block.: Blk.T. after ext.
flt.
2112A DIS TRANSBLK EF YES YES DIS transient block by EF
NO
2113 Mem.rec.sig. YES NO Memorize receive signal
NO
Teleprotection for DEF prot.
3201 FCT Telep. E/F ON ON Teleprotection for Earth Fault O/C
OFF
3202 Line Config. Two Terminals Two Terminals Line Configuration
Three terminals
3203A Send Prolong. 0.00 .. 30.00 sec 0.05 sec Time for send signal prolongation
3207A Delay for alarm 0.00 .. 30.00 sec 10.00 sec Unblocking: Time Delay for Alarm
3208 Release Delay 0.000 .. 30.000 sec 0.000 sec Time Delay for release after
pickup
3209A TrBlk Wait Time 0.00 .. 30.00 sec; ∞ 0.04 sec Transient Block.: Duration exter-
nal flt.
3210A TrBlk BlockTime 0.00 .. 30.00 sec 0.05 sec Transient Block.: Blk.T. after ext.
flt.
3212A EF TRANSBLK DIS YES YES EF transient block by DIS
NO
SOTF
2401 FCT SOTF-O/C ON ON Inst. High Speed SOTF-
OFF O/C is
2404 I>>> 1A 0.10 .. 25.00 A I>>> Pickup
5A 0.50 .. 125.00 A 12.50 A
POWER SWING
2002 P/S Op. mode All zones block All zones block Power Swing Operating mode
Z1/Z1B block
>= Z2 block
Z1,Z1B,Z2 block

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 14 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


2006 PowerSwing trip NO NO Power swing trip
YES
AUTORECLOSE
3401 Auto-Reclose Function • ON ON Auto Reclose Function
• OFF
3402 CB ready interrogation at • YES YES CB ready interrogation at 1st trip
1st trip • NO
3403 Reclaim time after 0.50 .. 300.00sec 30 sec Reclaim time after successful
successful AR Cycle AR cycle
3404 AR blocking duration after 0.50 .. 300.00sec 1 sec AR blocking duration after
manual close manual close
3406 Evolving fault recognition with PICKUP with TRIP Evolving fault recognition
with TRIP
3407 Evolving fault (during the block AR blocks AR Evolving fault (during the
dead time) start 3p AR dead time)
3408 AR start-signal monitoring 0.01 .. 300.00sec 0.13 sec AR start-signal monitoring
time time
3409 CB Supervision Time 0.01 .. 300.00sec 3 sec Circuit Breaker (CB) Supervision
time Time
3410 Send delay for remote 0.00 .. 300.00sec; ∞ ∞ Send delay for remote
close command close command
3411A Maximum dead time 0.50 .. 300.00sec; ∞ ∞ Maximum dead time
extension extension
3420 AR with distance protection • YES YES AR with distance protection
• NO
3421 AR with switch-onto-fault • YES NO AR with switch-onto-fault
overcurrent • NO overcurrent
3423 AR with earth fault • YES NO AR with earth fault
overcurrent • NO overcurrent
3430 3pole TRIP by AR • YES YES 3pole TRIP by AR
• NO
3431 Dead line check or • WITHOUT WITHOUT Dead line check or
Reduced Dead Line • RDT Reduced Dead Line
• DLC
3438 Supervision time for dead 0.10 .. 30.00sec 0.10 sec Supervision time for dead
live voltage live voltage
3440 Voltage threshold for live 30 .. 90V 48V Voltage threshold for live
line or bus line or bus
3441 Voltage threshold for dead 2 .. 70V 5V Voltage threshold for dead
line or bus line or bus
3450 Start of AR allowed in • YES YES Start of AR allowed in
this cycle • NO this cycle
3451 Action time 0.01 .. 300.00sec; ∞ 0.20 sec Action time

3456 Dead time after 1pole trip 0.01 .. 1800.00sec; ∞ ∞ Dead time after 1pole trip

3457 Dead time after 3pole trip 0.01 .. 1800.00sec; ∞ 0.50 sec Dead time after 3pole trip

3458 Dead time after evolving 0.01 .. 1800.00sec; ∞ 5.00 sec Dead time after evolving
fault fault
3459 CB ready interrogation • YES YES CB ready interrogation
before re-closing • NO before re-closing
3460 Request for synchro-check • YES YES Request for synchro-check
after 3pole AR • NO after 3pole AR
Synchrocheck
3501 Synchronism and Voltage • ON ON Synchronism and Voltage
Check function • OFF Check function
• ON w/o Close Cmd
3502 Voltage threshold dead line 1 .. 100 V 5V Voltage threshold dead line/bus
/bus
3503 Voltage threshold live line 20 .. 125 V 80 V Voltage threshold live line/bus
/bus
3504 Maximum permissible 20 .. 140 V 110 V Maximum permissible
voltage voltage

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 15 of 18


PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
DISTANCE PROTECTION RELAY -F210 (7SA52)

Addr. Parameter C Setting Options Default Setting Comments


3507 Maximum duration of 0.01 .. 600.00sec 1.00 sec Maximum duration of
Synchronism-check Synchronism-check
3508 Synchronizable condition 0.00 .. 30.00sec 0.50 sec Synchronizable condition
stability time stability time
3509 Synchronizable circuit (setting options depend on none Synchronizable circuit
breaker configuration) breaker
3510 Operating mode with AR • with T-CB close with T-CB close Operating mode with AR
• w/o T-CB close
3511 Maximum voltage 1.0 .. 60.0 V 6.0 V Maximum voltage difference
difference
3512 Maximum frequency 0.03 .. 2.00 Hz 0.10 Hz Maximum frequency difference
difference
3513 Maximum angle 2 .. 80 ° 10 ° Maximum angle difference
difference
3515A AR at Usy2>, Usy1> and • ON YES AR at Usy2>, Usy1> and Synchr.
Synchr. • OFF
3516 AR at Usy1< and Usy2> • ON YES AR at Usy1< and Usy2>
• OFF
3517 AR at Usy1> and Usy2< • ON YES AR at Usy1> and Usy2<
• OFF
3518 AR at Usy1< and Usy2< • ON NO AR at Usy1< and Usy2<
• OFF
3519 Override of any check • ON NO Override of any check
before AR • OFF before AR
3530 Operating mode with • with T-CB close w/o T-CB close Operating mode with Man.Cl
Man.Cl • w/o T-CB close
3531 Maximum voltage 1.0 .. 60.0 V 6.0 V Maximum voltage difference
difference
3532 Maximum frequency 0.03 .. 2.00 Hz 0.10 Hz Maximum frequency difference
difference
3533 Maximum angle 2 .. 80 ° 10 ° Maximum angle difference
difference
3535A Manual Close at Usy2>, • ON YES Manual Close at Usy2>, Usy1> and
Usy1> and Synchr. • OFF Synchr.
3536 Manual Close at Usy1< • ON YES Manual Close at Usy1< and Usy2>
and Usy2> • OFF
3537 Manual Close at Usy1> • ON YES Manual Close at Usy1> and Usy2<
and Usy2< • OFF
3538 Manual Close at Usy1< • ON NO Manual Close at Usy1< and Usy2<
and Usy2< • OFF
3539 Override of any check • ON NO Override of any check
before Man.Cl • OFF before Man.Cl

Setting Relay F210 Bay OHL PUNAGAYA 1 DAN 2 16 of 18


PERHITUNGAN RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
OVER CURRENT RELAY

Designation : -F511
Relay Type : Siemens 7SJ62
Rated Current : In = 5A
Rated Voltage : Vn = 110 V

1 System Data
Line Length Ln = 59.000 km
Tegangan Nominal Vn = 150 kV
CT Ratio Ct = 2000 / 5A CT = 400
PT Ratio PT = 150000 / 110 V PT = 1364
Freqwency f = 50 Hz
Jenis Penghantar : SUTT 2 x ACSR 450 Sqmm
CCC : 1620 A 4.1 sekunder
MVA Base =1.732 * In * Vn = 519.6 MVA

2 Setelan OCR
Isbs = 1.2x CCC Isbs = 1944

Setelan Tap Relay Iset1 = Isbs*In/CT Iset1 = 4.86 A (sekunder)

diambil Iset1 = 0.72 A (sekunder)

Setelan Actual Iset1 = Isbs*In/CT Iset1 = 288.00 A (primer)

arus Short Circuit di Bus Ihs3B = 15513 Ihs3B = 15513

Ihs2B = 0.867*Ihs3B Ihs2B = 13449.77

Waktu Kerja Relay yang dikehendaki =1 detik


tms1 = [(Ihs2B/Iset1)**0.02-1]*t/0.14 tms1 = 0.570766 detik
Dipilih tms1 = 0.57 detik

Cek Kerja Waktu Relay

t1 = 0.14*tms1/[(Ihs2B/Iset1)^0.02-1] t1 = 1.00 detik

3 Setelan GFR
Isbs = 0.3x CCC Isbs = 486

Setelan Tap Relay Iset1 = Isbs*In/CT Iset1 = 1.22 A (sekunder)

Setelan Actual Iset1 = Isbs*In/CT Iset1 = 486 A (sekunder)

arus Short Circuit di Bus Ihs1B = 9689 A Ihs1B = 9689

Waktu Kerja Relay yang dikehendaki =1 detik

tms1 = [(Ihs1B/Iset1)**0.02-1]*t/0.14 tms1 = 0.440558 detik

Dipilih tms1 = 0.44 detik

Cek Kerja Waktu Relay

t1 = 0.14*tms1/[(Ihs1B/Iset1)^0.02-1] t1 = 1.00 detik

Perhitungan Relay Overcurrent F511


Doc. No (4) QTEP0102-TBG33-S002 Bay OHL PUNAGAYA 1 DAN 2 17 of 18
PARAMETER SETTING RELAY PROTEKSI GI 150kV TANJUNG BUNGA ARAH PUNAGAYA 1 DAN 2
OVER CURRENT RELAY -F511 (7SJ82)

Addr. Parameter C Setting Options Default Setting


Network data
_:103 General:rated apparent 0.20 MVA to 5 000.00 MVA 519.6 MVA
power
:9451:101 General:Rated current 1 A to 100000 A 2000 A
_:9451:102 General:Rated voltage 0.20 kV to 1200.00 kV 150.00 kV
Power-system data
_:9451:149 General:Power-sys. neutral • grounded grounded
point • suppress. coil grounded
• isolated
Measurements
_:9451:158 General:P, Q sign • not reversed not reversed
• reversed
Phase Over Current
_:691:1 Inverse-T 1:Mode • off on
• on
• test
_:691:2 Inverse-T 1:Operate & • no no
flt.rec. blocked • yes
_:691:11 Inverse-T 1:1-pole • no no
operate allowed • yes
_:691:26 Inverse-T 1:Dynamic • no no
settings • yes
_:691:27 Inverse-T 1:Blk. w. inrush • no no
curr. detect. • yes
_:691 :8 Inverse-T 1:Method of • fundamental comp. fundamental comp.
measurement • RMS value
_:691:120 Inverse-T 1:10 elimina- • no no
tion • yes
_:691:3 Inverse-T 1:Threshold 1A 0.030 A to 35.000 A
5A 0.15 A to 175.00 A 4.86 A
_:691:108 Inverse-T 1:Pickup delay 0.00 s to 60.00 s 0s
_:691:131 Inverse-T 1:Reset • instantaneous instantaneous
• disk emulation
_:691:101 Inverse-T 1:Time dial 0.00 to 15.00 0.57 s
_:691:115 Inverse-T 1:Additional 0.00 s to 60.00 s 0.00 s
time delay

Ground Over Current


_:691:1 Inverse-T 1:Mode • off on
• on
• test
_:691:2 Inverse-T 1:Operate & • no no
flt.rec. blocked • yes
_:691:11 Inverse-T 1:1-pole • no no
operate allowed • yes
_:691:26 Inverse-T 1:Dynamic • no no
settings • yes
_:691:27 Inverse-T 1:Blk. w. inrush • no no
curr. detect. • yes
_:691 :8 Inverse-T 1:Method of • fundamental comp. fundamental comp.
measurement • RMS value
_:691:120 Inverse-T 1:10 elimina- • no no
tion • yes
_:691:3 Inverse-T 1:Threshold 1A 0.030 A to 35.000 A
5A 0.15 A to 175.00 A 1.22 A
_:691:108 Inverse-T 1:Pickup delay 0.00 s to 60.00 s 0s
_:691:131 Inverse-T 1:Reset • instantaneous instantaneous
• disk emulation
_:691:101 Inverse-T 1:Time dial 0.00 to 15.00 0.44 s
_:691:115 Inverse-T 1:Additional 0.00 s to 60.00 s 0.00 s
time delay

Setting Rele F511 Bay OHL PUNAGAYA 1 DAN 2 18 of 18


1 2 3 4 5 6 7 8
(=E09+S1) (=E09+WR1) 1P Voltage Bus A (Protection)
BUS A MARSHALLING KIOSK 150kV Control & Protection Panel 1P Voltage Bus B (Protection)
NEXT
PANEL
-Q1
BUS B 3P Voltage Bus A (Protection)
NEXT
A -SF210 1 phase 3P Voltage Bus B (Protection) PANEL
A
2RMLG02
-Q1 -Q2 -Q2
-Q1
2000A, 40kA 2000A, 40kA
-F210
-SF210
-Q2
M M
21 25 67N 79 68 85 to Tele Prot Panel
2RMLG
(Telecomunication Panel)
-SF210
-Q0
7SA52
2RMLG
-Q9
B B
-Q0 -F511
2000A, 40kA -SF511
46 FR
2RMLG 1P Voltage Bus A (Measurement) NEXT
1P Voltage Bus B (Measurement) PANEL
7SJ86
M
-Q1
3P Voltage Bus A (Measurement)
NEXT
3P Voltage Bus B (Measurement) PANEL
-Q2
P1 -Q1
Core 1
2000-4000/5A CL.PX X311 -A301
2000-4000/5A CL.5P20 -SA301
-Q2
X312
C Core 2 C
2000-4000/5A CL.PX X313 I/O V A 25 Varh W Var Wh FR
-T1 Core 3 2RMLG
2000-4000/5A CL.PX X314 -Q0
Core 4 6MD8
Core 5
2000-4000/5A CL.0.2s X315 -SA301 3 phase
-SA301 1 phase
-Q9
P2 2RMLG 2RMLG02
-Q9
2000A, 40kA
-F741R -F741S -F741T -K861
M
(=ES0+WS1) 74 74 74 86
-SP403 -P403
2RMLG
-F742R -F742S -F742T -K862 -K86B -K941
D -Q8 2RMLG
74 74 74 86 86 94 D
Energy Meter Panel
Tripping Diagram =E09
F10 Power To Other Feeder

Panel
Device Circuit Breaker 86/1 86/2 79-AR 86B 94
Supply (Central Unit Process)
-Q0 Start
150kV, 10KA
-T5 Main 1 Main 2 Ident. Type Function TC-1 TC-2 Block -K861 -K862 -F210 -K86B -K941 BB1 BB2 Other End Trip
150 0.11 0.11 X -F210 7SA52
21(Z1/Z1B) X X X
kV 21 (Z2/Z3), 67N, SOTF X X
3 3 3
X 50/51 X X
-F511 7SJ8
E 50N/51N X X E
Cl.0.2 X321

=E09+WR1
X X -K941 Tripping Relay 94 X X X
Cl.3P X322 X -K861 Lock Out Relay 1 86/1 X X X
X -K862 Lock Out Relay 2 86/2 X X X
X X -K86B Lock Out Relay Buspro 86B X X X
(BUS PRO Panel) -F87B Bus Bar Protection 87BB X*
Others Trip from other end X
=E09 X* = TRIP WITH DS SELECTED BUS
OHL PUNAGAYA 1
SIMETRIK INTEGRASI@COPY RIGHT 2018

F
CA5 CA7
DATE 28.11.18 PT. PLN (PERSERO) 150kV OHL PUNAGAYA 1 GARDU INDUK 150KV TANJUNG BUNGA (EXT)
= E00.A
UIP SULAWESI BAGIAN SELATAN PT. TEPPO ELECTRIC
DRAFT AP SLD AND TRIPPING MATRIX +
PEKERJAAN PEMBANGUNAN
A For Approval 28.11.18 AP CHECK AL
GARDU INDUK 150KV PUNAGAYA (EXT) PERSADA (3) QTEP0102-TBG01-S001
SH. / CA6
REV DESCRIPTION DATE NAME APPR DAN GARDU INDUK 150KV TANJUNG BUNGA (EXT) BASIC DESIGN SHS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
(=E10+S1) (=E10+WR1) 1P Voltage Bus A (Protection)
BUS A MARSHALLING KIOSK 150kV Control & Protection Panel 1P Voltage Bus B (Protection)
NEXT
PANEL
-Q1
BUS B 3P Voltage Bus A (Protection)
NEXT
A -SF210 1 phase 3P Voltage Bus B (Protection) PANEL
A
2RMLG02
-Q1 -Q2 -Q2
-Q1
2000A, 40kA 2000A, 40kA
-F210
-SF210
-Q2
M M
21 25 67N 79 68 85 to Tele Prot Panel
2RMLG
(Telecomunication Panel)
-SF210
-Q0
7SA52
2RMLG
-Q9
B B
-Q0 -F511
2000A, 40kA -SF511
46 FR
2RMLG 1P Voltage Bus A (Measurement) NEXT
1P Voltage Bus B (Measurement) PANEL
7SJ86
M
-Q1
3P Voltage Bus A (Measurement)
NEXT
3P Voltage Bus B (Measurement) PANEL
-Q2
P1 -Q1
Core 1
2000-4000/5A CL.PX X311 -A301
2000-4000/5A CL.5P20 -SA301
-Q2
X312
C Core 2 C
2000-4000/5A CL.PX X313 I/O V A 25 Varh W Var Wh FR
-T1 Core 3 2RMLG
2000-4000/5A CL.PX X314 -Q0
Core 4 6MD8
Core 5
2000-4000/5A CL.0.2s X315 -SA301 3 phase
-SA301 1 phase
-Q9
P2 2RMLG 2RMLG02
-Q9
2000A, 40kA
-F741R -F741S -F741T -K861
M
(=ES0+WS1) 74 74 74 86
-SP403 -P403
2RMLG
-F742R -F742S -F742T -K862 -K86B -K941
D -Q8 2RMLG
74 74 74 86 86 94 D
Energy Meter Panel
Tripping Diagram =E10
F10 Power To Other Feeder

Panel
Device Circuit Breaker 86/1 86/2 79-AR 86B 94
Supply (Central Unit Process)
-Q0 Start
150kV, 10KA
-T5 Main 1 Main 2 Ident. Type Function TC-1 TC-2 Block -K861 -K862 -F210 -K86B -K941 BB1 BB2 Other End Trip
150 0.11 0.11 X -F210 7SA52
21(Z1/Z1B) X X X
kV 21 (Z2/Z3), 67N, SOTF X X
3 3 3
X 50/51 X X
-F511 7SJ8
E 50N/51N X X E
Cl.0.2 X321

=E10+WR1
X X -K941 Tripping Relay 94 X X X
Cl.3P X322 X -K861 Lock Out Relay 1 86/1 X X X
X -K862 Lock Out Relay 2 86/2 X X X
X X -K86B Lock Out Relay Buspro 86B X X X
(BUS PRO Panel) -F87B Bus Bar Protection 87BB X*
Others Trip from other end X
=E10 X* = TRIP WITH DS SELECTED BUS
OHL PUNAGAYA 2
SIMETRIK INTEGRASI@COPY RIGHT 2018

F
CA6 CB1
DATE 28.11.18 PT. PLN (PERSERO) 150kV OHL PUNAGAYA 2 GARDU INDUK 150KV TANJUNG BUNGA (EXT)
= E00.A
UIP SULAWESI BAGIAN SELATAN PT. TEPPO ELECTRIC
DRAFT AP SLD AND TRIPPING MATRIX +
PEKERJAAN PEMBANGUNAN
A For Approval 28.11.18 AP CHECK AL
GARDU INDUK 150KV PUNAGAYA (EXT) PERSADA (3) QTEP0102-TBG01-S001
SH. / CA7
REV DESCRIPTION DATE NAME APPR DAN GARDU INDUK 150KV TANJUNG BUNGA (EXT) BASIC DESIGN SHS
1 2 3 4 5 6 7 8

You might also like