Professional Documents
Culture Documents
A - MEDIA TO GET - ALL DATAS IN ELECTRICAL SCIENCE... !! - Transformer Stability Test Procedure PDF
A - MEDIA TO GET - ALL DATAS IN ELECTRICAL SCIENCE... !! - Transformer Stability Test Procedure PDF
Test and Measurement Measuring Instruments Multimeter Tester Like Share 752 people like this. Sign Up to see what
your friends like.
Custom Search Search
Home Electrical Engineering Basics 4 Point Starter Three Point Starter Starting of Induction Motor Capacitor Labels CNC Stepper ConTroller Capacitors
Translater Labels
Transformer Stability Test Procedure MULTIPLY-EXCITED
Select Language MAGNETIC FIELD
OBJECTIVE: SYSTEMS
Powered by Translate
LPT PORT EXTENDER
The Purpose of Differential Stability test is to determine the Healthiness of the Differential CT Motorola Xoom set for
Popular Posts circuits which is protecting the in Zone equipment from actual fault conditions and through fault preorders at Best Buy
conditions. SAMSUNG TAKES DRAM
Characteristic Curves of Hydraulic Turbines 512-pins wide
Principle of Protection scheme and Testing: Inside Samsung's 30-nm-
VELOCITY TRIANGLES, WORKDONE, class, 'green' DDR3
EFFICIENCY OF PELTON WHEEL INLET AND SDRAM
OUTLET VECTOR DIAGRAMS This scheme is applied to protect the Equipment from the in zone faults and to avoid spurious
operation of scheme due to out side zone faults. This Differential Testing mainly carried out to
Dark Lamp Method of Synchronizing An ensure the correctness of CT selection and setting parameters during fault sensing. The
Alternator with the Bus Bar. Differential relay monitors the primary & secondary side CT currents magnitude and vectors and
operates for the in zone fault conditions, restrains for the through fault conditions.
Classification of solids on the basis of band
theory
VERIFICATION OF DIFFERENTIAL SCHEME Stability:
Transformer Stability Test Procedure
To verify the Differential CT circuits the following test / methods are adopted,
STATIC & DYNAMIC CHARACTERISTICS OF
MEASUREMENT SYSTEM:
1. First of all the current generated during the Differential stability test is calculated using the
The Operation of Reluctance Motor with % z voltage and source to feed the current will have to be chosen.
Diagram
2. Apply the 440 VAC supply from HV side of the Transformer in such way that Primary CT’s
KEYBOARD AND DISPLAY INTERFACE
are included in the circuit.
USING INTEL 8279 MICROPROCESSOR
SWITCHING CHARACTERISTICS OF DIODE 3. Short the 3 phase of the Transformer secondary side with sufficient current carrying cable
after the secondary CT’s. So by step 2 & 3 Differential CT’s will see the load / fault currents.
USB Host Software
4. Differential Relay has to be set as per the required calculated setting values before starting
the stability test. (ie: CT Ratio correction factor, Vector Correction factor)
Electrical and Electron… 5. Now the 440 VAC supply can be applied to verify the stability condition. Make sure the
752 likes
safety that no temporary earthing / discharging of cables if it’s a live network.
6. Now the secondary currents of Primary & secondary CT’s, Bias currents, Relay currents,
Restrain currents, Operate currents can be noted down from the Relay measuring menu. At the
Like Page Contact Us
stability condition the Primary & secondary currents magnitude and vector should match. No
current should pass through the operating coil of the relay (Refer Stability Test Report &
Be the first of your friends to like this Drawings).
2. Switch off the 3 phase supply and return back the Primary “R” phase CT connections to
Most viewed Posts normal. Now reverse the “Y” phase CT connections. Switch ON the 3 phase supply and verify
the Differential relay operation “Y” phase element. The magnitudes of Primary & secondary CT
STATIC & DYNAMIC currents, relay currents, Restraining coil currents shall be noted down. Now at operating coil we
CHARACTERISTICS OF can measure the operating current.
MEASUREMENT SYSTEM:
The performance characteristics
of an instrument are mainly 3. Switch off the 3 phase supply and return back the Primary “Y” phase CT connections to
divided into two categories: i) Static normal. Now reverse the “B” phase CT connections. Switch ON the 3 phase supply and verify
characteristics ii) Dynamic charact... the Differential relay operation “B” phase element. The magnitudes of Primary & secondary CT
currents, relay currents, Restraining coil currents shall be noted down. Now at operating coil we
Dark Lamp Method of
Synchronizing An Alternator can measure the operating current.
with the Bus Bar.
DARK LAMP METHOD: In 4. Normalize all the CT connections at primary side. Repeat the same above procedure for all
this method, the lamps are the 3 phases at secondary side CT’s and ensure the Differential relay operation of each
directly connected across
synchronizing switch as shown is fig. The corresponding phase elements.
voltages an...
After completing the sensitivity test by reversing both side CT’s, all CT connections to be
THREE POINT STARTER normalized and again Stability of the CT circuits to be confirmed before concluding the test.
• The above figure shows, the After the stability test it is advised not to touch or disturb the CT circuits of both the sides to
motor is connected to supply
terminals through three ensure proper operation of the Differential scheme.
terminals L, A, and F available
in the starter, it ... METHOD OF STATEMENT FOR TRANSFORMER REF STABILITY TEST
►
► 2016 (25) To verify the Differential CT circuits sensitivity the following test / methods are adopted,
▼
▼ 2015 (9)
▼
▼ August (2) NOTE: Before starting the sensitivity test bypass or remove the REF relay as a safety measure.
Transformer Stability Test Procedure Also short the METROSIL and Stabilizing resistors to avoid damage.
EARTH ELECTRODE RESISTANCE
MEASUREMENT TESTING MET... 1. Now stop the primary injection current, reverse the “R” phase CT polarity. Inject the Primary
current again and verify the operation of REF element. Note down the current at REF operating
►
► July (2) coil.
►
► June (1)
►
2. At the same time note down the Voltage developed across the METROSIL and Stabilizing
► May (4)
resistor. And verify there should be NO voltage across REF relay terminals.
►
► 2014 (3)
►
► 2013 (29) 3. Bring back “R” phase CT connections to normal. Now reverse the Neutral CT connections,
repeat the step 1 & 2.
►
► 2012 (110)
►
► 2011 (756) 4. Follow the same above steps 1, 2 & 3 for the “Y” and “B” phase to ensure the sensitivity of
►
► 2010 (7) REF scheme
After completing the sensitivity test by reversing the CT’s, all 3 phase CT connections to be
Nahas Basheer normalized and again REF Stability of the CT circuits to be confirmed before concluding the
View my complete profile test. After the stability test it is advised not to touch or disturb the CT circuits of both the sides to
ensure proper operation of the Differential scheme.
Nahas Basheer
Labels: EARTH ELECTRODE RESISTANCE MEASUREMENT TESTING METHODS, EARTH FAULT RELAY,
METHOD OF STATEMENT FOR TRANSFORMER STABILITY TEST, METHOD OF STATEMENTS, OVER
CURRENT RELAY, OVER CURRENT RELAY TESTING METHODS
No comments:
Post a Comment
Publish Preview
Labels
Add a comment...
Alex Jane
amazing post
Like · Reply · 6y
Ashok Kumar
very much helful for students.
Like · Reply · 4 · 6y
Pavan Bhawsar
shivani campare then good.
Like · Reply · 3 · 6y
Bernard Otoo
Can Norton 3rd law be introduce in synchronous speed?
Like · Reply · 2 · 6y
Bhargav Tammina
v
Like · Reply · 1 · 6y
Jumter Yomcha
really helpful site....
Like · Reply · 3 · 6y
Sdm HuSsain
cOpy it dudeS nd paste to your aSsignment.
Like · Reply · 2 · 6y
priyamishra223
thnks. hlped me a lot.
Like · Reply · 3 · 6y
Search
Followers
Blogging by Mediatoget is licensed under a Creative Commons Attribution 3.0 Unported License.