Professional Documents
Culture Documents
inShare
SOLAS regulation, which says “…every crew member shall participate in at least one
abandon ship drill and one fire drill every month…” is widely known. However, not
every training with survival crafts is done monthly and to make it even more
complicated there are certain variations on the lowering, launching and
maneuvering frequencies depending on the type of ship’s equipment. This post
idea is to bring some extra light on the subject of abandon ship drills.
How often abandon ship drill has to be carried out?
It is the very first question to ask, after asking “WHY they have to carried out?”
Answer is easy. Because abandon ship is not something that happens to crew on a
daily basis. Nevertheless, in the ocean there is no emergency service to come and
save our lives. So crew has to know what and how to do, and not less important
to be able to communicate efficiently and work as a team in case of
emergency.
The drills of the crew shall take place within 24 h of the ship leaving a port if
more than 25% of the crew have not participated in abandon ship and fire drills on
board that particular ship in the previous month.
When a ship enters service for the first time, after modification of a major character
or when a new crew is engaged, these drills shall be held before sailing.
On passenger ships, an abandon ship drill and fire drill shall take place weekly.
The entire crew need not be involved in every drill, but each crew member must
participate in an abandon ship drill and a fire drill each month as required in
regulation 19.3.2. Passengers shall be strongly encouraged to attend these drills.
But that’s not all. According to SOLAS Ch. III/19.4 each crewmember “as soon as
possible but not later than two weeks after joining the ship” has to be given an on-
board training in the use of the ship's life-saving appliances, including survival craft
equipment, and in the use of the ship's fire-extinguishing appliances. ALL the ship's
life-saving and fire-extinguishing appliances shall be covered within any period
of two months.
What if you work 4/4 or 5/5 weeks on the same ship? Then “such training shall be
given not later than two weeks after the time of first joining the ship.”
.2 reporting to stations and preparing for the duties described in the muster list;
.5 lowering of at least one lifeboat after any necessary preparation for launching;
and…
and…
3.4.9 Emergency lighting for mustering and abandonment shall be tested at each
abandon ship drill.
3.4.6 As far as is reasonable and practicable, rescue boats other than lifeboats
which are also rescue boats, shall be launched each month with their assigned
crew aboard and manoeuvred in the water. In all cases this requirement shall be
complied with at least once every three months.
3.4.7 If lifeboat and rescue boat launching drills are carried out with the ship
making headway, such drills shall, because of the dangers involved, be practised in
sheltered waters only and under the supervision of an officer experienced in such
drills.
There are also additional precautions mentioned in IMO MSC.1/Circ. 1578
Guidelines on safety during abandon ship drills using lifeboats:
1.5 Planning and organizing drills
1.5.4 The lowering of a boat with its full complement of persons is an example of
an element of a drill that may, depending on the circumstances, involve
an unnecessary risk. Such drills should only be carried out if special precautions are
observed.
2.3 Lifeboats lowered by means of falls
2.3.2 When drills are to be performed with persons on board the lifeboat, it is
recommended that the boat be lowered and recovered without any persons on
board first to ascertain that the arrangement functions correctly. In this case, the
boat should then be lowered into the water with only the number of persons on
board necessary to operate the boat
2.3.3 To prevent lashings or gripes from getting entangled, proper release should be
checked before swinging out the davit.
3 The Committee, therefore, agreed that the assigned operating crew should not be
required to be on board lifeboats during launching, unless the master, within the
authority conferred to him by paragraph 5.5 of the ISM Code, considered, taking into
account all safety aspects, that the lifeboat should be launched with the assigned
operating crew on board.
Certainly the regulations for davit-launched lifeboats cannot apply to free fall
lifeboats. In this case crew shall refer to SOLAS Ch. III/19.3.4.4:
… at least once every three months during an abandon ship drill the crew shall
board the lifeboat, properly secure themselves in their seats and commence launch
procedures up to but not including the actual release of the lifeboat(i.e., the
release hook shall not be released).
The lifeboat shall then either be free-fall launched with only the required operating
crew on board, or lowered into the water by means of the secondary means of
launching with or without the operating crew on board. In both cases the lifeboat
shall thereafter be manoeuvred in the water by the operating crew.
At intervals of not more than six months, the lifeboat shall either be launched by
free-fall with only the operating crew on board, or simulated launching shall be
carried out in accordance with the guidelines developed by the Organization.
As per latest IMO circular MSC.1-Circ.1578 simulated launching is a means of
training the crew in the free-fall release procedure of free-fall lifeboats without the
physical activation of release mechanism. The last statement means that you may
never launch this kind of lifeboat by means of free fall.
Is that all?
Not yet. If the vessel equipped with davit operated life rafts, there is one more
thing to do as per SOLAS Ch. III/19.4.3:
On-board training in the use of davit-launched liferafts shall take place at intervals
of not more than four months...
Whenever practicable this shall include the inflation and lowering of a liferaft. This
liferaft may be a special liferaft intended for training purposes only, which is not part
of the ship's life-saving equipment; such a special liferaft shall be conspicuously
marked.
What are the time criteria for preparation and launching of survival
crafts?
On cargo ships, it is required that lifeboats and davit launched liferafts are capable of
being launched within a period of 10 min.
Record keeping
All drills and trainings activities have to be duly recorded in the ship’s logbook. If
the vessel has a deck logbook and an additional flag logbook, then all drills shall
also be recorded in the later one as well. If a full muster, drill or training session is
not held at the appointed time, an entry shall be made in the log-book stating the
circumstances and the extent of the muster, drill or training session held.
Also details of drills shall be filled in company’s SMS drill reports. Details of any
tests or malfunctions have to be reflected in ship’s PMS (preventive maintenance
system).
Hopefully, this material provides you with more or less full scope of drills, trainings
and launchings that have to be carried out with survival crafts on board.
Best regards,
Aleksandr Pipchenko
Useful links:
IMO MSC.1/Circ. 1578. Guidelines on safety during abandon ship drills using
lifeboats, 2017