You are on page 1of 1

REVISION NO : 00

REVISION DATE : Sept. 27, 2018

INTEGRATIVE COURSE PROGRESS REPORT

COURSE: CHE CAPSTONE PROJECT 1 COURSE CODE: CHE200D-1 SECTION: A03 SY/TERM: 2019 -2020 /2ND TERM

TITLE OF RESEARCH PROJECT: FEASIBILITY STUDY OF PRODUCTION OF R-134A BY VAPOUR PHASE GROUP CODE:
FLUORINATION 2019CHE020

INTEGRATIVE COURSES THESIS PHASE

THESIS
PLANT DESIGN PROPOSAL DEFENSE FINAL DEFENSE
CAPSTONE PROJECT `
BUSINESS PLAN DATA GATHERING
FEASIBILITY STUDY

Name of Students
Student No. Program of Study Signature
(SURNAME, GIVEN NAME MI.)

HEROMIANO, KATE DREW G. 2014101913 CHEMICAL ENGINEERING

PABALAN, FRANCIS AERON R. 2012102620 CHEMICAL ENGINEERING

SALAMAT, AVA JOBELLE A. 2015105620 CHEMICAL ENGINEERING

DESCRIPTION OF WORK DONE FOR THE TIME PERIOD


(Use back page or additional sheets if necessary)

WEEK #: 11 COVERED DATE: FEB 10-16, 2020

11th week of the project, the group prepared the power point presentation needed in the plant design proposal

defense which will be held at 17th of February. The group run through their presentation and prepared various

visuals to be ready in case of some questions from the panels that will require a visual proof. The group were able to

finalize all the chapters and the presentation at this week.

To be filled up by adviser.
Endorsed by: Preferred Schedule:
Ready for Oral Defense

ATTESTED BY NOTED BY

ADVISER COURSE COORDINATOR


Signature over printed name / Date Signature over printed name / Date

Copies : (1) Student (2) Adviser (3) Course Coordinator OVPAA-039-09


This form is available at the Office of Vice President for Academic Affairs

You might also like