9.60m 9.

60m

TB1 TB1
3.10m TB1 3.10m
4 NOS. 16MM DIA 2 NOS. 1MM DIA 4 NOS. 16 MM DIA
350
350

3.10m TB1 TB1 3.10m


250 250
TB1

2.62m TB2 SUPPORT SPAN


TB2 3.125m
TB2
TB2 SECTION OF TIE BEAM, TB1
2.62m TB2 TB2 2.125m

3.20m 3.20m 3.20m 3.20m 3.20m 3.20m


250

LAYOUT OF FOUNDATION AND TIE BEAM 1NOS. 16MM


DIA
4 NOS. 16MM DIA 300 300 4 NOS. 16MM DIA
DISCONT. END CONT. END DISCONT. END
OF TIE OF TIE OF TIE
250
0.3L1 0.3L1 0.3L2 0.3L2

50(min) SUPPORT SPAN


50(min) 50(min) 50(min)

EXTRA TOP COL. EXTRA TOP TOP LAYER COL.


COL. TOP LAYER SECTION OF TIE BEAM,TB2
SPACER BAR SPACER BAR

Ld
D

BOTTOM LAYER BOTTOM LAYER


2D
2D 2D REST PORTION 2D
(Stps. S1) REST PORTION (Stps. S1) (Stps. S1) (STIRRUPS S2) (Stps. S1)
(STIRRUPS S2)

L1 L2

TYPICAL L-SECTION OF TIES/ BEAMS


SCHEDULE OF R.C TIE BEAM
REINFORCEMENT AT SUPPORT REINFORCEMENT AT SPAN
BEAM MARKER BEAM SIZE
TOP BOTTOM TOP BOTTOM
2 NOS. 16mm DIA + 2 2 NOS. 16mm DIA + 2
TB1 250X350 2 NOS. 16mm DIA 2 NOS. 16mm DIA 8mm DIA @150 C/C
NOS. 16mm DIA NOS. 16mm DIA
2 NOS. 16 mm DIA + 2 NOS. 16 mm DIA +
TB2 250X300 2 NOS. 16mm DIA 2 NOS. 16mm DIA 8mm DIA @150 C/C
1NO. 16mm DIA 1NO. 16mm DIA