36830 SCHEDULE OF OPENINGS:


ALU. DOOR:
D1 : 1800 X 2450

V
D2 : 1500 X 2450

I
D3 : 1200 X 2450
1 2 3 4 5 6 7 8 9 D4
D5
: 1200 X 2300
: 1350 X 2450
A
D6 : 1050 X 2450
6000 5000 3350 3750 3500 5000 5000 5000 FLUSH SHUTTERS:
D7 : 1500 X 2450
D8 : 1200 X 2450
D9 : 1050 X 2450
UP D10 : 0900 X 2450
STAFF FULLY GLAZED DOOR:
UP ENTRANCE UNLOADING FGD1: 1200+1800+1200 X 3600
D6/MSV3 W3/V1 W3/V1 D2/V3 V4 V4 D10 D10 V4 V4 2400 X 2400 V2 V2 D1/V1 V2
J UPVC DOOR:
D11: 0750 X 2150

1
Soiled Vessels
D12: 0750 X 2300

IV

28
WINDOW:
B

V1
MSW1/MSV1
D11 D11 D11 D11 INDEX SIZE SILL LVL TOP LVL
4500

ELECTRICAL W1: 1800 X 2100 +1650 +3750(BEAM BOT)


ROOM 2150mm HIGH 2150mm HIGH W1A: 1800 X 1700 +750 + 2450(LINTEL BOT)
2960X4385 WALL WALL W2: 1500 X 2100 +1650 +3750(BEAM BOT)
TOILET (M) TOILET (F) W2A: 1500 X 1500 +750 +3750(BEAM BOT)
STAFF DINING 3520X4270 3270X4270 W3: 1800 X 1200 +1250 +2450

Prefinal & Final Rinse


7695X6635(MAX) W4: 1500 X 1200 +1250 +2450
W5: 1200 X 1200 +1250 +2450

17
H Double heads

16
VENTILATOR:
SHOES

Tunnel
FOOT WASH
V1: 1800 X 750 +2450 +3200

300
2250

Pri Rinse Tunnel


W5/V2

V1
V1A: 1800 X 750 (@ ROOF LEVEL)

2020
D9 V2: 1500 X 750 (@ ROOF LEVEL)
V3: 1200 X 750 (@ ROOF LEVEL)
V4: 0900 X 600 +1850 +2450
CHANGE (G)
G D9 3520 X 5387 V2 Roller
V5: 0750 X 600
V6: 0600 X 600
+1850
+1850
+2450
+2450 C
Two Tier
Conveyor
2350

W5/V2

VIEWING PANEL :
IDLI MAKING

IDLI MAKING

V1
VP1: 1200 X 1200 +1250 +2450
7520
CHANGE (F) (Levels given are w.r.t. FFL)

HAND WASH
FOOT &

Scrubbing
VESSEL STORE

3 Stations

3 Stations
3235 X 5270 M.S. ROLLING SHUTTERS :
F

Head

Head
8270X5270 RS1: 2500 X 2450
FOOD LAB
2435 X 5270 M. S. WINDOWS & VENTILATORS :
D9a MSW1: 1800 X 1500 +0950 +2450
3150

W3/V1A

MSW2: 1200 X 1500 +950 +2450


IDLI MAKING AIR LOCK 9770 MSV1: 1800 X 0750 (@ ROOF LEVEL)

V1
D9
MSV2: 1200 X 0750 (@ ROOF LEVEL)
10770X7520 HAND & 3520X2000 750 MSV3: 1050 X 0750 (@ ROOF LEVEL)
FOOT WASH :

E CONVEYER CUTOUT

25250
D2 cutout 1200 X 1200 frm flr lvl D
D3 D3 D6
900 X 900 M S ROLLING SHUTTER:
20370 AIR LOCK
II
RS1: 2500 X 3600

D3

D3
2500X2335 RS2: 3000 X 3600

V1
DRAIN TO DETAIL
AIR CURTAIN
33610

STRIP CURTAIN

6000
6930

steps, 280X150 MS5: 2500 X 2450


PACKING CONVEYOR BELOW
PLATFORM
EL 0.0

GOODS
ENTRY
1500

D1
E

2850
OPENING
900 X 900

1800
Cooked Rice Dispensing Cooked Rice Dispensing Curry Machine Hopper
Hopper Hopper (Movable for both
machines)

900
500 Litre 500 Litre

GODOWN
Curry Machine Curry Machine
900 X ht1200

With Lid With Lid


couout

9770 X 25250

1050
1500

1500
Double Head
Rice Tray Loader

V2
V1

Steamer
Trolley
Steamer
Trolley
SECTION E
7000

LOADING COOKING AREA


6300

STORE ALTAR TO DET STORE

07 REVISED AS CLOUDED IN THE DWG. 10.03.2018

EL 1.50 06 REVISED AS CLOUDED IN THE DWG. 07.03.2018


F
REVISED AS CLOUDED IN THE DWG. 26.02.2018

1500 X 2100
05
09.12.2017
V1

W3
04 DG RELOCATED, B1 & D1 COLUMN DELETED

03 ADDED ROLLING SHUTTER AND EMERGENCY DOOR. 25.10.2017


Electrical Panel Electrical Panel Electrical Panel Electrical Panel Electrical Panel
500W Single phase,
500W Single phase, 500W Single phase,
500W Single phase, 500W Single phase,
Neural & Earth Neural & Earth Neural & Earth Neural & Earth Neural & Earth

02 ADDED DISPOSAL & STORE IN COOKING AREA. 10.10.2017


Steamer

Steamer
Trolley

Trolley

01 GEN. REVISION BASED ON THE DISCUSSIONS ON 27.09.17 04.10.2017


OPENING REV. DESCRIPTION DATE
900 X 900

B Steam Drain
Chimney RO Water Inlet
1
2" BSP Socket
Steam Inlet
BSP Socket

Water Drain
1
2"
1
2"
Steam Inlet
BSP Socket

Water Drain
RO Water Inlet
1
2" BSP Socket
Steam Drain
Chimney
Steam Drain
Chimney RO Water Inlet
1
2" BSP Socket
Steam Inlet
BSP Socket

Water Drain
1
2"
1
2"
Steam Inlet
BSP Socket

Water Drain
RO Water Inlet
1
2" BSP Socket
Steam Drain
Chimney
Steam Drain
Chimney RO Water Inlet
1
2" BSP Socket
Steam Inlet
BSP Socket

Water Drain
1
2"

REVISIONS

400 PROJECT:-

steps, 280X150
1800

D3

D3
AIR LOCK 3000
steps,
280X150

2110X1900 10
11 PROPOSED
20
30K KITCHEN FACILITY (MID DAY MEAL
D2

MAIN ENTRY
Prabhupada PHOTO
SCHEME) AT SRIKAKULAM, A P
5500

TO DET
PRE-PREPARATION
coconut grater

9290X5270 CLIENT

H K M C F , HYDERABAD. G
COLD STORE 1 28
section E

AIR LOCK
6525X3150
D3

ARCHITECTS & PRINCIPAL CONSULTANTS:


D3

potato peeler
2750 x 2500
veg wash veg cutting veg cutting LOUNGE
table table HEGDE AND HEGDE
tank 9770 X 9970 458 10TH CROSS GIRINAGAR II PHASE 201 MARVEL SIGNET, SHIRUR PARK MAIN ROAD,
BENGALURU VIDYANAGAR, HUBBALLI

A 1200
1315

W1 W1 W1 W1 STRUCTURAL CONSULTANTS
1200
1200

ZAKI & ASSOCIATES


375

H.NO: 3-6-10, 4TH FLOOR


ANASUYA COMMERCIAL COMPLEX,
steps, 280X150

LIBERTY JUNCTION, HIMAYAT NAGAR


HYDERABAD - 500029

ELECTRICAL CONSULTANTS
Poorna Engineering Consultants
#48(S), II ‘A’ MAIN, I STAGE, II PHASE, CHANDRA LAYOUT,
VIJAYANAGAR, BENGALURU,

H
GROUND FLOOR PLAN DRAWING TITLE:-
GROUND FLOOR PLAN
I

DRAWING NO:- GFC-A-02.R5


EL 0.0 & 1.50 DATE : 06.05.2019 S
PROJECT NO SCALE DEALT CHECKED E W
5019 TO FIT ABHISHEK TSB
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16