You are on page 1of 3

This repot is based on time study and capacity of e

OPERATION M/C Machine No.


1 Matching collor length and cutting collar edge
SNEC
2 Marking collar center 36
3 Putting collor panel on tale and marking 2 points TABLE-Manual
4 Shoulder join 4TOL 30
6 Lower Placket Top Stitch SNLS 15
7 Side seam Attach 4TOL 9
8 Bartack (4) Bartack 1
9 Sticker remove & Turn inside out-helper lady Table-Manual
10 Sticker remove & Turn inside out-helper Table-Manual
11 Thread trimming Trimmer
12 Thread trimming Trimmer
13 QC (Inside checked) QC-TABLE
14 QC QC-TABLE
15 QC QC-TABLE
Bottle-neck for 1500 pieces per 7 hours

16 Care label attach SNLS 33


17 Heat Sealing of logo HEAT SEAL 24
18 Neck 1/4 top sticth on Neck band SNLS 18
19 Button hole-3 Buttonholing 12
Bottle-neck for 1600 pieces per 7 hours

20 Top stitch on shoulder SNLS 29


Bottle-neck for 1600 pieces per 7 hours
on time study and capacity of every operators of Line 2, MB-1.
Operator ID Average cycle time with 18%Allowance in seconds
6.11948
ASMAA 18653 6.82512
5.66872
HASNAA MEZAR 18009 19.09948
RIPAM 16.81264
AYA MOHAMED 18625 50.91936
RADA 17162 17.77552
SOHER 18642 38.82436
ESLAM 5603 48.17468
OLAABD 11682 33.75272
HUDA 13969 38.56004
AMIRA 34.2318
MOUSTAFA 17.92715
18.48824
ttle-neck for 1500 pieces per 7 hours is in 15 operations.

DALIA MAHMOUD ASHOUR 16482 16.02676


MOUSTAFA 17753 16.284
SARA 18539 32.10308
AHMED 4249 15.85212
ttle-neck for 1600 pieces per 7 hours is in 19 operations.

ADEHA HAMDY 15040 14.82552


ttle-neck for 1600 pieces per 7 hours is in 20 operations.
Per day Capcity in pieces

1354

1319
1499
495
1418
649
523
747
654
736
1406
1363

1572
1371
785
1590

1700