Flow sheet
The feed 2-butanol from storage tank at Temp 25oC is pumped through
pump at the shell side of the shell and tube type preheater. Dry
saturated Low pressure steam of the temp 140oC is used in tube side to
increase the 2-butanol temp up to 100oC and after that the condensate is
removed and recycled to make low pressure steam. The flow of steam is
controlled by FIC.
(b) horizatonal kettle vaporizer
Saturated vapors are fed into Separator from where any liquid butanol
The Hot Butanol Vapour is fed to two super heater to increase the
through thermocouple.
(d) Reactor
Dry Butanol from super heater is fed to the packed bed reactor having
selected.
vaporizer.
further sub cooled it .The 80% of reaction product (MEK and alcohol)
from the extraction column. The hydrogen discharged from the top of
the absorption column is dried and fed to the furnace as fuel of burners.
absorption column
(h) Solvent Extraction column
along with the liquid( MEK and Butanol) from the absorption
The Extract (TCE and MEK) from solvent Extraction column is fed
The extract(TCE and MEK) from solvent Extraction column is fed to the
= 29850.75 Kg/Day
Production=1.071243.78=1330.85Kg/h
I.e. we will have to make / design a plant for final MEK production
= 1330.85Kg/h
REACTOR STREAM 1
F M MEK Distillation
Column R
2 R=Recycle
Alcohol Recycle
Alcohol=99%, MEK&OTHER=1%
H2 BUTANOL MEK H2
74 72 2
Butanol MEK=1330.85Kg/h=18.48Kmol
Some MEK and some Butanol is wasted with Hydrogen in absorption section
M=F+R
=1.48 Kg/h
Material Balance over Reactor:-
Kg/H kmol %
Reactor
Kg/H kmol % 2-Butanol 151.85 2.05 9.98
(90% conversion)
2- 1519.81 20.54 99.9 MEK 1332.76 18.51 87.61
Butanol
Hydrogen 36.68 18.34 2.41
MEK 1.48 .02 .1
Total 1521.29 -- 100
Total 1521.29 -- 100
KgpH kmol %
20%
Total 333.60 100
Partial
KgpH kmol %
Condenser
Butanol 151.85 2.05 9.98
80% condensate
MEK 1332.76 18.48 87.61
Hydrogen 36.68 18.34 2.41 (80%20% Vapour
condension)
KgpH kmol %
Butanol 121.48 1.64 10.23
MEK 1066.21 14.51 89.77
Hydrogen 0 0 0
Total 1187.69 100
Material Balance Over Absorption Coloumn-
Aqueous Ethanol absorb MEK and Butanol and releases Hydrogen gas
Kg/hr kmol %
Butanol 0 0 0
Kg/hr kmol %
Kg/hr kmol %
Butanol 0 0 0
Kg/hr kmol %
Kg/hr kmol %
Butanol 13.44 0.18 1.0
MEK 1330.85 8.68 99.00
Total 1344.29
Kg/hr kmol %
EQUIPMENT:-
order to avoid large heat losses. The cold feed is first preheated to its
products. The vapor, which has entrained liquid is removed from the
knock out drum, and then heated to reaction temperature using flue gas.
point 107.50C.
Heat load on preheater, Q = (1519.81 × 1.497+1.48×1.664)(380.5
– 298)
= 187902.83 KJ/h
= 88.49
Kg/hr BUTANOL
VAPORIZER:-
= 1521.29× 557.43 KJ
= 848012.68 KJ/hr
T = 431 K
FIRST SUPER HEATER:-
2-butanol vapors are to be heated from 380.5 K to 573K .using flue gas
Q = 596817.04 KJ/h
= 1989.39 kg/h
It raises the temperature of vapor from 573K to 773 K , using flue gas
Cp = 2.674 KJ/KgK
= 1063925.77KJ/h
Flue gas requirement, =
= 4451.57 Kg/h
The feed enters the reactor at 773K and leaves at 673K. The conversion
obtained in the reactor is 90%. The heat balance includes two terms i.e ,
ΔH = 73900 KJ/Kgmol
= 1519.81/74
=20.54 kmol/h
= 958409.68 KJ
It is assume that a flue gas is available at 800K & leaving 750K
=16040.33 Kg/h
At the mole fraction x = 0.80 of the condensate we get both liquid and
CpH2 = 14650 J/ kg k
Cpalcohol = 1760 J/ kg k
CpMEK = 1664 J/ kg k
= 602018.14 KJ/h
= 72450.16 KJ/h
196474.73+602018.14+72450.16
= 870943.03KJ/h
= 11556.18 Kg / h
= 117751.16Kj/h
= 0.15248.80Kj/h
= 102.53Kj/h
27)
= 19424.01Kj/h
= 149565.17Kj/h
(61.354.186+1.332.299+3.142.429)(T-
300)
=267.29(T-300)Kj/h
11.07=T-300
T=311.07K
Leavesat 270C.
UNIT:-
Feed is not saturated liquid it is sub-cool liquid. Saturation temperature
is 930C
R= 2Rm = 0.76
Feed:
Total = 11.56kmol /h
XMEK = 0.32
F . HF = 366220.47 Kj/h
Distillate:-
D = 4.07kmol/hr
= 713.36Kj/h
Residue:
= 124635.72Kj/h
Condenser:-
VHv = (D + L ) . HL +Qc
Qc = V x (Hv - HL)
Qc = V x λ
V = (1 + R ) x D
D = 4.07 kmole/h
= 22.81x104kj/h
Qc = 22.81 x 104kj/h
= 3204.60Kg/h
Reboiler:-
F. HF + QB = Qc + D . HD + WHw
QB = Qc + D . HD + WHw - F. HF
QB = DHD = WHw + Qc - FHF
QB = 317228.61Kj/h