You are on page 1of 3

FORD EL CRISTO

CONSOLIDATED OFFICES & PDC FACILITY


PKS PRECAST STRUCTURE & WALLS
Safety December
Man-hours Worked
without Lost Time
Injury Historic:

82

Statistics
Key Schedul e Acti vi ti es Work Week
Items Prev Current Total to
Period Period Date
% Gap
49 50 51 01 Status Notes/ Issues/ % Complete
Activity - Construction Subs 0% 0|% 0%
0%
09 16 23 30 %
Concerns % Scheduled 0% 0% 0%

Manpower 3 +2 5
P REFA M OVIL E
SOIL MEC HANIC S ST UDY INFRA ESTRUCTURA Man-hours WLTR 82 82 82

Quality Issues
• P KS T 10 0 .0 0 %
- SE REVISAN LOS EQUIPOS DE PERFORACIÓN DE PILAS.
P REFA M OVIL E
C AISSONS INFRA ESTRUCTURA
- CAISSONS PERFORATION MACHINERY REVIEW

KO 16/12/2019 Critical Purchase


•P KS T 0%
- SE ENVIAN LOS SUBMITTALS DE ACERO DE REFUERZO EN PILAS
- SE REVISAN LOS SUBMITTALS DE CONCRETO

- STEEL REINFORCEMENT SUBMITTALS IN PILAS ARE SENT


- THE CONCRETE SUBMITTALS ARE REVISED

Hot Issues
- SEGUIMIENTO A LAS REUNIONES DE SEGURIDAD
- SEGUIMIENTO DE LAS REUNIONES DE INGENIERIA GALA-GACONSA-WALBRIDGE

- FOLLOW-UP TO SECURITY MEETINGS


- FOLLOW-UP TO THE GALA-GACONSA-WALBRIDGE ENGINEERING MEETINGS

WEEK 49
Construction Highlights
-SE REALIZA EL ESTUDIO DE MECANICA DE SUELOS

-THE STUDY OF SOIL MECHANICS IS FINISHED


FORD EL CRISTO
CONSOLIDATED OFFICES & PDC FACILITY
PKS PRECAST STRUCTURE & WALLS

ITEM DESCRIPTION VOL START END SCHEDULED COMPLETE


SOIL MECHANICS
1 1 2019 NOV 11 2019 NOV 30 1 100.00% 1 100.00%
STUDY
CAISSONS DEEP
2 151 2019 DIC 16 2019 MAR 01 151 PZA 0% 0 0.00%
FOUNDATION

WEEK 49
SEALER
SEALER
FORD EL CRISTO
CONSOLIDATED OFFICES & PDC FACILITY
PKS PRECAST STRUCTURE & WALLS

SOIL MECHANICS STUDY

WEEK 49
CAISSONS PERFORATION MACHINERY REVIEW

You might also like