installation
Including: power line, heavy duty line, P+ and P-
signal wire, ITL - A and ITL - B waterproof lines,
RS232 line, RPA and RPB lines, Main power switch
power line
P+,P-singal wire
ITL-A,ITL-B Water
protection line
RS232 line
Put the laser source into the independent cabinet
Laser power plug and heavy-duty plug connection
Connecting the power line
with laser source
Connecting the heavy duty line
with laser source
1.The RAYCUS source contain four different power line signal, L1, L2, L3, PE-8
Put
the
L1
line
into
the
L1
any
port
Line L2 is installed in the terminal block of L2on the
terminal block in the control cabinet
Put
the
L2
line
into
the
L2
any
port
Line L3 is installed in the terminal block of L3 on the
terminal block in the control cabinet
8.Pu
t the
L3
line
into
the
L3
any
port
Put the PE-8 line into the PE port
Put
the
PE-8
line
into
the
PE
any
port
P+ line is MOD+ line. Put it into the control board OUT1 port
P-Line is MOD- line. Put it into the control board OUT2 port
MOD+ MOD-
Put the ILT - A and ILT - B waterproof line into the IN7 electric reply
ILT-A
ILT-B
Put the RS232 into the back of computer mainframe port
The RPA and RPB lines are installed on the LASER key
switch on the control cabinet
RPA
RPB
The main power switch of laser source
OFF
ON
Transform the key port to REM instead of ON
Prohibit to put the START button.
Note: The laser does not emit laser when pressed, it is in alarm state,
and the red laser light will be on