Beijing Damavand Energy Technology Co., Ltd
Tel: 0086-10-64913779 Mobile: 0086-15611816490
Fax: 0086-10-64913749 Email: Marketing@damavandenergy.com
Ade: Room 511, Tianjian Builiding, No.6 Huixinnanli, Chaoyang District, Beijing

Quotation No.: DM-2016-106

QUOTATION FOR PUMPS in RMB (SJS)

Unit price Total Price


Delivery
Item Decription Qty
Time
RMB RMB

RIG SAFE SKID, PSS-621 B DOUBLE PUMP


ACDIZINGTING UNIT, W/C15 ENGINE,
4700 OFS TRANS., TPD600 PUMP, 20BBL 3 4,750,000.00 14,250,000.00 100 Days
DISPLACEMENT TANK, STAINLESS, FMC
ORIGINAL TREATING IRONS
1
SPARE PARTS FOR PSS-620B SKID FOR
3 115,000.00 345,000.00 45 Days
ONE YEAR

OPTIONAL: Remote Control System ( Used


1 125,000.00 125,000.00 45" -�
��:..-�
for 3 units)

BCS-300-100A ACIDIZING BATCH MIXER,


1 1,490,000.00 1,490,000.00
W/C9 ENGINE, STAINLESS TANKS. 4���
2 ,., E; � .

·��
450 \.J� �
·"�I
SPARE PARTS FOR BCS 300 SKID 1 18,000.00 18,000.00

PNS-180K NITROGEN PUMPING


SKID,W/C15 ENGINE,3-GUPD PUMP,180K �c
1 2,690,000.00 2,690,000.00 100 Days
POT VAPORIZER. FMC ORIGINAL
3 TREATING RIONS ,�

SPARE PARTS FOR PNS-180K SKID 1 105,000.00 105,000.00 45 Days

4 SKID MOUNTED NITROGEN TANK, 2000GA 1 210,000.00 210,000.00 45 Days

5 DATA VAN 1 2,310,000.00 2,310,000.00 45 Days

TOTAL VALUE OF ALL UNITS 21,543,000.00

20% Prepayment by TT 4,308,600.00

The 80% Remaining Value Due Paid by UC 17 ,234,400.00

The Cost for 2-year Irrevocable Usance UC 2,527, 180.76 14.66%

Total UC Value, FOB TJ/SH Seaport, China 19,761,580.76


.i->: )
_--c

Notes

The quotation is FOB Tianjin or Shanghai, China (accoding to INCOTERMS 2010), and the
1
validity is 30 days.

2 Payment and Delivery

The buyer should pay 20% of the contract value by TfT against the signing of the contract as
2.1 prepayment. The remaining contract value should be paid by Irrevocable Usance UC with 2
Years in favor of the Seller.

2.2 Buyer should open the UC within one month after signing the agreement.

2.3 Paymet Transfer to Kunlun Bank in China.

2.4 The Delivery Time is 45-100 days to Tianjin or Shanghai Seaport after receiving the prepaymet.

3 The above quotation excludes any Bank Guarantee. If the client need it, the cost will be added.

4 The buyer should be responsible for the customs clearances in Iran.

Beijing Da

June 28th,
�-it·�
!ING DAMAVAND ENERGY
TECHNOLOGY CO.,LTD