The document provides a budget for skilled workers and materials for a construction project. It lists the daily rates for various roles like foreman, electrician, and plumber. It also gives the total labor budget of 1.1 million pesos. Material costs are outlined for doors, windows, and other items totaling 300,000 pesos for materials and 500,000 pesos for furniture. The project timeline is also summarized which includes 1 week for budget approval, 1 week for contracting, 7 months for construction, and 1 day for blessing.
The document provides a budget for skilled workers and materials for a construction project. It lists the daily rates for various roles like foreman, electrician, and plumber. It also gives the total labor budget of 1.1 million pesos. Material costs are outlined for doors, windows, and other items totaling 300,000 pesos for materials and 500,000 pesos for furniture. The project timeline is also summarized which includes 1 week for budget approval, 1 week for contracting, 7 months for construction, and 1 day for blessing.
The document provides a budget for skilled workers and materials for a construction project. It lists the daily rates for various roles like foreman, electrician, and plumber. It also gives the total labor budget of 1.1 million pesos. Material costs are outlined for doors, windows, and other items totaling 300,000 pesos for materials and 500,000 pesos for furniture. The project timeline is also summarized which includes 1 week for budget approval, 1 week for contracting, 7 months for construction, and 1 day for blessing.
633.00 pesos Heavy Equipment Operator Highly Skilled Operator 633.00 pesos
Driver 538.87 pesos
Skilled Laborer 538.87 pesos
Professional Home Designer 20,592 pesos per month
Total: 1,110,428.44 or 1.5 mil
for unwanted problems John Christopher E. Cayabyab 12 materials price
Door/wall/windows/bulbs/ 300,000 pesos
Total: 300,00
Furniture 500,000 pesos
Total: 500,000 pesos
Blessing 12,000 pesos
Total: 12,000 pesos
PLANO NG DAPAT GAWIN:
John Christopher E. Cayabyab 12 1. PAGPASA, PAG- AAPROBA, AT PAGLABAS NANG BADYET AT PAG BILI NANG MATERYALES (ISANG LINGGO) 2. MANGONGONTRATA (ISANG LINGGO)