You are on page 1of 2

Project Name

: Six Laning of Shamlaji to Motachiloda from Km. 401.200 to 494.410 (Length 93.210 Km)
Section of NH-8 in the State of Gujarat Under NHDP Phase- V (Package-VI) on Hybrid Annuity
Mode

Client : National Highways Authority of India


Independent Eng. : M/s TPF Gentisa & Sterling indotech Consultants Private Limited
Concessionaire : M/s Shamlaji Expressway Private Ltd.
EPC Contractor : M/s. Chetak Enterprises Limited
Contractor : M/s. NG Projects Limited
DAILY WORK PROGRAM SHEET ( LAB)
DATE:
Sr. Road Type of No's of
Location Source/ Layer Name of Test
No. Side Material Sample
Gradation,LL-
1 464+000 to 464+360 RSR Top layer WMM 1
PL,FI&EI,AIV
Gradation,LL-
2 464+350 to 464+380 LSR Top layer WMM 1
PL,FI&EI,AIV

Contractor's Concessionaire's
Representative Representative
to 494.410 (Length 93.210 Km)
e- V (Package-VI) on Hybrid Annuity

Limited

B)
21.12.2020

Remarks

IE's
Representative