Professional Documents
Culture Documents
Sub: Consultancy Services for preparation of DPR for development of Northern portion of
Hyderabad Regional Ring Road Expressway under Bharatmala Pariyojana Phase-I in the State
of Telangana.
Sr. Cl. No. Secti Existing Provision as per RFP Modified Provision
No on
. & Reference
APPENDIX-V ……….. ………….
1
Detailed Eval
uation Criteri S. Package Tentative Minimum Minimum S. Package Tentative Minimum Minimum length of
a Clause 1.1 No. No. Length Aggregate length of a No. No. Length Aggregate a Eligible Project
(a) & (b) Length Eligible Project Length (2/4/6 lane)
required=500Km (2/4/6 lane) required=160
DPR/ DPR Feasibility DPR/ DPR = Feasibility
Feasibility = = = 300 Km Feasibility = 64 Km = 96 Km
500Km 200 160Km
Km
APPENDIX-V ……….
2
Detailed Eval ………..
uation Criteri S. Package Minimum Minimum length of a Eligible S. Package Minimum Minimum length of a Eligible
a Clause 1.2 No. No. Aggregate Project (2/4/ 6 lane) No. No. Aggregate Project (2/4/ 6 lane)
(a) & (b) Length Length
required of required of
DPR/ DPR/
Feasibility Feasibility
DPR Feasibility DPR Feasibility
Lead Other Lead Other Lead Other Lead Other Lead Other Lead Other
in Partner in Partner in Partner in Partner in Partner in Partner
JV in JV JV in JV in JV JV in JV JV in JV in JV
JV JV
375 250Km 150Km 100Km 225Km 150Km 120 80Km 48Km 32Km 72Km 48Km
Km Km
Note: The contents of the uploaded RFP documents shall deem to be modified to the extent
of aforesaid corrigendum wherever applicable.