You are on page 1of 1

LOCATION ASKEC OFFICE TOILET ID N/A FOR THE MONTH OF March-19

LEGEND OK – ACCEPTABLE, NOT - NOT ACCEPTABLE, ELM– EQUIPMENT LOST OF MISSING, REP – EQUIPMENT BEING REPAIRED, N/A – NOT APPLICABLE
RAISE THE ISSUES THROUGH CORRECTION REPORT (BEFORE & AFTER PHOTO) FOR ACTION TAKEN

02/03/2019

03/03/2019

04/03/2019

05/03/2019

06/03/2019

07/03/2019

09/03/2019

10/03/2019

11/03/2019

12/03/2019

13/03/2019

14/03/2019

16/03/2019

17/03/2019

18/03/2019

19/03/2019

20/03/2019

21/03/2019

23/03/2019

24/03/2019

25/03/2019

26/03/2019

27/03/2019

28/03/2019

30/03/2019
Date/
Time

General Cleaning

Lighting

No Water Leakage

Water Availability

Closet not broken/crack

No bad odours
Wash Basin Available &
Cleaning
Wash Soap & Tissue Paper
Available
Sufficient Ventilation

Toilet Flush

Signature By Cleaner

Accepted By Site
Reviewed By Safety Officer Date Sign Date Sign
Manager

PROJECT / DEPARTMENT NAME: Construction of 380Kv D/C OHTL interconnected to Dhahran South, New Dhahran Central Dhahran
Housing& Ownership(DHO) BSP
ELEMENT 1.4a
TOILET CHECKLIST

Doc. no : El.1.4a Issue Date: 01.07.18 Rev. No . 01 Page 1 of 1

You might also like