CONSTRUCTION
PROJECT
LIFECYCLE
LESSON OUTCOMES (LO)
At the end of this module, students should be able to:
Understand the definition and concept of construction
project lifecycle.
Understand and explain the phases and construction
project lifecycle using RIBA plan of work;
i. Inception Phase / Pre-Construction Phase.
ii. Construction Phase.
iii. Completion Phase / Post-Construction Phase.
Definition & Concept
awang295@sarawak.uitm.edu.my
Definition & Concept
CONSTRUCTION PHASE
COMPLETION PHASE/Post-Construction Phase
Three main phases and construction PLC using RIBA Plan of Work
Associate Drawings (PLC) CONCEPT
Pre-Tender Phase
}
• Conceptual drawings (normally prepared by an architect)
• Preliminary drawings (various amendment)
}
Construction Phase
• Construction drawings (endorsed by architect/engineer) with
CONSTRUCTION
input from shop drawings PHASE
• Shop drawings (prepared by sub-contractor, endorsed by
consultant)
COMPLETION
}
Completion Phase/Post-Construction Phase PHASE
(Post-Construction
• As-Built (after construction completed)
Phase)
awang295@sarawak.uitm.edu.my
Definition & Concept
TWO WAYS OF
LOOKING AT PLC
BY PROJECT
PHASE (ADAMS
AND BRANDT,
1983):
awang295@sarawak.uitm.edu.my
Managerial actions
Tasks accomplish
Definition & Concept
awang295@sarawak.uitm.edu.my
Construction Phase
CONSTRUCTION PHASE:
Detail out of project planning and execution inclusive of
monitoring and controlling the project.
Converting idea from designers’ plans and specifications to the
physical structures or facilities within controlling the time, cost
and quality.
CONSTRUCTION TEAMS:
Including Project Manager Team, Specialist in design level, Main
Contractor, Sub-contractors and Suppliers.
awang295@sarawak.uitm.edu.my
( )
DETAILED OUT IN TOPIC
10 FOR SITE
ORGANIZATION
GENERAL
FLOWCHART OF
awang295@sarawak.uitm.edu.my
CONSTRUCTION
PHASE
Construction Phase
The objectives:
Deposit for loans ‒ The security deposits serves as security against the
materials or plant and machinery delivered to site; which on behalf of the
contractor, the bank had paid to the supplier.
Punishment ‒ In case the contractor does not complete the work in time, use
inferior quality materials or left the work incomplete, the security deposit is
forfeited as a punishment to the contractor and in view of getting
compensation of the damages done by the contractor to the owner.
awang295@sarawak.uitm.edu.my
Construction Phase
War, invasion, act of foreign enemy, civil war, rebellion, mutiny, riot and
civil combination.
Nuclear reaction and radiation.
Willful act or negligence of the insured.
Cessation of works when total or partial.
awang295@sarawak.uitm.edu.my
Construction Phase
awang295@sarawak.uitm.edu.my
Construction Phase
Contract drawing
Drawings embedded in the contract document with stamping imprint with the
words of “CONTRACT DRAWING” for all discipline as per agreed in early
tendering stage by consultants namely as architecture, structural, civil,
surveyor, mechanical and electrical.
Useful as a reference for any misunderstanding during the construction stage.
Construction drawing
Design drawings that have been approved by the responsible parties
(consultants) for construction stage usages.
Attached with the detailing and subjected to revision if any change has been
made by responsible parties.
The drawing is imprint with the stamping words of “CONSTRUCTION
DRAWING”.
awang295@sarawak.uitm.edu.my
Construction Phase
Shop drawing
Consists of drawings, schedules, diagrams, and other related data to illustrate
a material, a product, or a system for some portion of the work not clarified in
the Construction drawing or counter proposed detail design from contractor,
subcontractor, manufacturer, distributor or supplier.
Compulsory to seek design approval from relevant external consultant before
it is able to be used for construction after permission from existing consultant.
awang295@sarawak.uitm.edu.my
Construction Phase
Site Meeting
To coordinate site activities, monitor
awang295@sarawak.uitm.edu.my
Construction Phase
awang295@sarawak.uitm.edu.my
Construction Phase
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
GENERAL
FLOWCHART OF
POST-CONSTRUCTION
PHASE
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
FINAL INSPECTION
Before the S.O. is able to issue CPC, there is a final inspection conducted to identify
any defects for completed works.
Include the comments from relevant authorities starting from design stage to the
project completion.
Also include inspection for utilities/infrastructure such as water reticulation,
sewerage and drainage systems.
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
FINAL INSPECTION
Testing and Commissioning conducted within certain periods or times to fulfill the
function and safety. The facilities or services involves are as bellow:
• Plumbing – pressure test, etc.
• Fire Fighting System – Active and Passive
‒ Active include sprinklers, pump and etc.
‒ Passive include fire extinguishers, passage ways and etc.
• Lift System – Motor room, lift system, etc.
• A/C System – chillers, pumps, temperature, air balancing, etc.
• Electrical System – continuity and insulation test, lamps, gen-set.
After final inspection and Testing and Commissioning completed, S.O. will then issue
Schedule of Defects to the main contractor within 14 days to resolve/improve during
Defect Liability Period (DLP).
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
S.O. shall issue CPC to Main Contractor by stating the date of completion based on
agreed DLP and attached together with Schedule of Defects.
The issuance of CPC means the starting of DLP.
With the issuance of CPC, Main Contractor shall prepare the documents below:
‒ As-Built Drawing
‒ Compilation of Quantitative and Qualitative Records.
‒ Warranty roducts
‒ Final Claim
awang295@sarawak.uitm.edu.my
CERTIFICATE OF
Completion Phase/Post-Construction Phase
PRACTICAL
COMPLETION (CPC)
Compilation of Qualitative
As-Built Drawing and Quantitative Records
Including as built drawings for piling, Qualitative records include measurement
sanitary and cold water and etc. It is and observations of works related to the
pictorial record of all the works quality and behavior under test such as
completed, showing the whereabouts and result of compression tests (cube test),
dimensions of all parts as they exist at piling test, soil test and etc.
completion, their operation as described Quantitative records include measuring
in the instruction manual and their of work done with the time and rate
performance under tests. stated, together with all relevant
particulars including piling record, Claim
Warranty Products
Evaluation, Progress/Interim Payment
Warranty products are such as warranty
and etc. Warranty Products
for water proofing, painting, roofing and
etc.
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
Final Claim
The Main Contractor shall submit the Final
CERTIFICATE OF
Claim (include all variations) within 3 months
PRACTICAL affected from issuance of CPC to enable S.O.
COMPLETION (CPC) prepare the Final Account.
(CONT) After issuance of Final Claim, the contractor
shall not claim for any money.
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
HAND OVER
The issuance of CCC approval means the readiness of structure or facilities hand
over to client and ready for public usages.
awang295@sarawak.uitm.edu.my
Completion Phase/Post-Construction Phase
FINAL CERTIFICATE
awang295@sarawak.uitm.edu.my
PROJECT LIFECYCLE:
awang295@sarawak.uitm.edu.my
ACKNOWLEDGEMENTS
Ritz, G. J., Levy, S. M. (2013). Total Construction Project Management (2nd ed.).
McGraw-Hill Education.
Additional notes:
Pellicer, E., Yepes, V., Teixeira, J. C., Moura, H. P., Catalá, J. (2013). Construction
Management. Wiley-Blackwell. Chapter 1: Organising Construction Processes in
Construction Companies, Chapter 15: Project Closeout.