Barkley Community Forest

PLA N N I N G D EPT .

PR OD U C T IO N

F &B D EPA R T M EN T
DATE

DATE

DATE
³
1:5,000 
)
10
S3

!
(
12
10
0m

!
(
!
(

S

K3S
005
Hammer Mark
Cutblock:
Mapsheet:
Albers:
SB8
Harvest Plan Map0m

92C.093

1038546 // 437764
6
Tenure: K3S
Hammer: K3S/005
Cutting Permit: 5

S6
20m Contour Intervals 
S
9 Lat/Long: 48° 57' 17'' N 125° 28' 28'' W Revision Date: July 13, 2017

)
11
!
<
MAP LEGEND !
() !
(
44
HC

)
S 0+578
8
0+293 5% !
(

SB
Harvest Activities !
<

8-
2
0+550
!

1
Falling Boundary 
) Please refer to Riparian ( 0+514 S3
Yarding Direction Management Plan for sediment 0+490 !
( 7 Treatment of CMTs and Bear Dens

R2
12
Hoe Chuck and erosion control for SB8-1 
) 
) !
(

S4
HC 43 CMT's and Bear Dens are not to be disturbed.
Grapple G station 0+074 +/- 30m !
(
42 If an unmarked CMT or Bear Den is found, stop working,
Heli H 6 and consult site supervisor.
Heli Drop Zone HC 0+074 !
( 0+388
HC 
)
Split Line 5% !
( 5%
WTRA ( )
!  4
WTRA 13 !
(
12

S4
Focused Retention 0+365

S4

) !
( $
+ Following the Plan
TLA TLA 0+000 
) !
(
41
Adjacent Blocks 14 5
S4 STEP 1: Always read and understand your plans and maps.
Logged Blocks 
) !
(
40 STEP 2: Always match your plan and map to what you find on the ground.
R1
Stop and ask if what you find on the ground does not match the plan and map.

R2
Road Features
Rock Quarry ô
Q !
(
44 STEP 3: Check that you can do the work
Stop and ask if you cannot follow the plan and map
Spoil Site !
( 0+199 $
+ STEP 4: Know your responsibilities. Ask if you are unsure.
End Haul Section 15 
)  3
)
0m

40
Deactivated 10
S3
!
( Rainfall Shutdown Guidelines

10
Built Road 34

B
Construction 2 Operations must cease in this area when rainfall amounts reach the following levels.
Reconstruction HC 
) !
(
40
Road R/W 16 75mm during a single shift or 12 hour period.
Road Station 0+000 
) 5% 1 100mm of accumulated rainfall in a 24 hour period.

R1
S3 
) 50mm may be deducted per 24 hour period for drainage.
Culverts ( 0+000
! BM
WBC 
S 19 39B Take specific direction from the site supervisor for changing requirements.

)
CMP !
( !
(
45A
) !
Bridge 
S (
47
17
!
( Riparian Management Plan - SB8
S4

46
Riparian Management
Designated Stream Crossing !
< 45 
!
( ) SB9
18
Fish Streams (S1-S4) !
(1 S2 Riparian Classification Phase Prescriptions
Non Fish streams (S5, S6) !
(2 S6 Debris Management Requirements
S4

Non Classified Drainage


Stream - Reach FRPA Falling Yarding Loading
Gully
Class RRZ RMZ Activity in RMZ
FSZ Stream
Reach Break/Fish Barrier +
$ Portions of RMZ inside block. Leave trees shoud be selected for windfirmness.
5m Machine Free Zone 12, 34, 43 S3 20 20 Away Away N/A N/A
Retain understory vegetation, saplings and non-merch along streams.
Wetland
RMA 40(R2), 42, 44(R1), Portions of RMZ inside block. Leave trees shoud be selected for windfirmness.
S4 0 30 Away Away N/A N/A
RRZ 45A Retain understory vegetation, saplings and non-merch along streams.
Waterbody
Leave trees shoud be selected for windfirmness. Retain understory vegetation,
Other Away Away
saplings and non-merch along streams. Leave pre-existing deadfall trees and No limbing or bucking in streams. Hand
Cruise Plot (Dropped) OPERATING AREA Salmon Beach 41, 45, 46, 47 S4 0 30 where (See Note Away
!
B METHOD HA VOLUME large woody debris (See Note 1). Do not disturb stream banks. 5m machine free clean introduced debris from streams.
Cruise Plot (Measure/Count) ! 12.3 0
Possible 1.)
. ! HOE CHUCK (5% RET) zone.
CMT Stump ! ENG GRAPPLE (% RET) 0 Leave trees shoud be selected for windfirmness. Retain understory vegetation,
m³/ha
Heli Pad
Legal Line
!
( H
HAUL
CRUISE
UCLU BATO
HELI (% RET)
HARVEST AREA 12.3
0
0
saplings and non-merch along streams. Leave pre-existing deadfall trees and
large woody debris (See Note 1). Do not disturb stream banks. 5m machine free Away Away
No limbing or bucking in streams. Hand
Cruise Type Line Km. 9.5 14.3 R/W REMOVED 1.7 44(R2) S6 0 20 zone. Cross at designated crossings. Fish bearing reach downstream. SB8-1 where (See Note Away
clean introduced debris from streams.
Rock Bluff SCALE: 1:5,000 TLA 0.0 road construction at Stn 0+074 +/- 30m - do not introduce sediment to stream. Possible 1.)
SU Type Line FIELD WORK COPPER ROAD PERMIT R/W 0.0 0 Implement erosion and sediment control such as sediment fence and mulch.
Trail DATE April-17 DISPERSED RETENTION (5%) 12.3 0 Revegetate disturbance post-construction.
Wildlife Tree o CHECKED
DATE
DRF
2017 GROSS AREA
Note 1. Where felled trees bridge the stream, they may be yarded if they can be lifted vertically without disturbing the stream bank or channel.
Otherwise, leave bridged trees. Yarding approval required by RPF or RPBio.
Bear Den P
! 14.0 0

Harvest Plan Map


Geographic Midpoint:
48° 57' 17'' North
125° 28' 28'' West SB8