0'-0" AGL 2'-0"

428'-0"

433'-4" 431'-4" 3'-4"

98'-0''
80'-6''
MAN-SIGMA (JV.)
House No 657, Road No 10, Avenue No 4, Mirpur DOHS, Dhaka-1216

As- Built Design at Goran- 10


450mm dia Housing Pipe 380'-0" ft.
Sanitary Seal 200mm dia Blind Pipe 48'-10" ft.
0'-50' Top Soil
Clay Filling 200mm dia SS Strainer 175'-2" ft.
Total Fixture Length 617'-0" ft.
Year of Installation July, 2015
50'-210' Clay/ Distance from the DTW 30'-0" ft.
Silty Clay
Static Water Level 290'-0" (2018)

210'-260' FS to Details of Execution


MS
Drilling Start on
Drilling Completed on
50'-210'
260'-400'
Clay/ Diameter of Drilling 28" & 24"
Silty Clay Total Depth of drilling 1070'-0" / 326.22 m
GPS Reading
Latitude 23º44'49''N
430'-0" 428'-0" Longitude 90º26'11''E

290'-330' Details of Installation


450 mm Φ MS Housing 430'-0" 131.10m
400'-620' Pipe
Fine to Medium
Sand 450x200 mm Φ Reducer 3'-4" 1.00 m
531'-4" 529'-4"
200 mm Φ Blind Pipe 360'-0" 109.76 m
200 mm Φ SS Strainer 185'-2" 56.45 m
589'-10" 587'-10" 58'-6" 200 mm Φ Bail Plug 10'-0" 3.05 m
Total Fixture Length 988'-6" 301.37 m
620'-640' Clay Centralizer MS 18 Nos
650'-10" 648'-10" 61'-0" SS 10 Nos
640'-685'
Medium to Fine 680'-0" 678'-0" 29'-2"
Sand

685'-855' Clay
201'-0"

881'-0" 879'-0"

855'-1050'
Medium to Fine 97'-6"
Sand 978'-6" 976'-6"

988'-6" 986'-6" 10'-0"

1040'-0" Clearance

Step Draw-Down Test Result


Manomet Discharge (Pumping Rate) Static Water Level Pumping Water Level Specific
er Drawdown
( S.W.L ) ( P.W.L) Capacity
Reading
(Inch) Cusec L/Sec US GPM m3/min Feet Meter Feet Meter Feet Meter L/S/M
18 1.50 42.48 673.32 2.55 243'-1ʺ 74.11 22ʹ-9ʺ 6.94 6.12
33 2.00 56.64 897.76 3.40 253'-0'' 77.13 32'-8'' 9.96 5.69
220'-4'' 67.17
53 2.50 70.80 1122.21 4.25 263ʹ-3ʺ 80.26 42'-11'' 13.09 5.41
72 Nearest
3.00 DTW
84.96 Information
1346.65 5.10 272ʹ-0ʺ 82.93 51'-8'' 15.75 5.39