You are on page 1of 1

PPL 2.

50 = PROPOSED PLATFORM LEVEL


FRL 2.50 = FINISH ROAD LEVEL

= PROPOSED 300mm PIPE CULVERT

= PROPOSED 450mm PIPE CULVERT

= PROPOSED 600mm PIPE CULVERT

= PROPOSED 750mm PIPE CULVERT

= PROPOSED 900mm PIPE CULVERT

= PROPOSED 1050mm PIPE CULVERT

= PROPOSED 1200mm PIPE CULVERT

= PROPOSED 1500mm PIPE CULVERT

= PROPOSED 1650mm PIPE CULVERT

= PROPOSED 1800mm PIPE CULVERT

= PROPOSED 100mmØ SUBSOIL DRAIN RESORT HOTEL 563


= PROPOSED 150mmØ SUBSOIL DRAIN

3550
TAPAK PELUPUSAN SAMPAH

JALAN TANAH

Simpanan Jalan
KEDIAMAN
LOT
4919 KAWASAN KEBUN
KAWASAN KEBUN
KELAPA SAWIT
TERES
KELAPA SAWIT

Simpanan Jalan
PB PB
90°00'00" 207.513m 90°00'00" 617.746m Jum. 90°00'00" 410.233m (BOUNDARY LINE)
N 35761.085

PARIT TANAH SEDIADA


W 3871.060 6.0 M BULDING SETBACK LINE
S14 S15 S16 S17 S18 S19 S20
TNB S21 S22 S23

S24 S25 S26 S27


S28 S29

S47 S48 S49 CONSUMER S54


OSD 2
S13

S46 HR
S50 S51 S52 S53 S77
RS
S102 S103
HR
S94 S95 S96
S90
E E S76 S100 S99 S98 S97
S12
DATARAN HR

S135 S134 S133 S132 S131 S130 S129


GARAGE S45

HR
S75 S101
HR
S93 4
S11

Jalan Simpang Empat - Bagan Datuk


S44 S128
LABORATORIES & WORKSHOPS

180°08'00" 117.774m

180°08'00" 117.774m
S74

S7 S8 S9 S10
S92

S73 HR HR

HR
HR
S127
S34 S35 S36
S43

HR

HR
S6 HR

S33 S91
S72

KOLEJ S37 S38 S39 S40 S41 S42


MULTI
MAIN BUILDING
S126

KOMUNITI S5
S32 HR
S71 PURPOSE
10 EKAR HALL
H

HR HR

S89
TANA

HR

S139

Jalan Simpang Empat - Bagan Datuk


HR

HR
S125
S70
BUS
H

3600
TANA

BOY'S HOSTEL
HR HR HR

S31

STAND
JALAN

S4

PUMP
S69 S140
PARIT

S124

S30 HOUSE 6036


S64 S65
S55 S56 S57 S58 S59 S60 S61 S62 S63 S66 S67 S68 S141
S3
S104

S137 S123

S83
ISLAMIC S142
KAWASAN KEBUN S105 PB
S2
S87 S88 CENTRE S138
ATM
KELAPA SAWIT S144 S145
180°00'00" 293.918m

S121 S122
S82 S146 S147 S148
S78 S79 S80 S81 S143
S85
0°00'00" 291.415m

S84

S136
S106
S107
D GH OUT SEKOLAH
6.0 M BULDING SETBACK LINE

S1 S108 S109 S110 S111 S112 S113 S114 S115 S116 S117 S118 S119
S86 S149

CAFETERIA MENENGAH SAINS


S265
S242 S243 S244 S245 S246 S247 S248 S249 S250 S251 S252 S253
IN
S269
D
S285 S284 S283
BAGAN DATUK
RS
S150
S262
S263 S273 S240 S241

S223 S224 S225 S226 S227 S266

S282
SERVICE

S278
S274 S272 ROAD
S239 S255
(20 m)
PUMP
S151
S228
S267
C C
S271
HOUSE PLOT 1

S281
S277
FUTURE

(BOUNDARY LINE)
S268
S258 S259 S260 S231 S270
KAWASAN CADANGAN

12.0 M BULDING SETBACK LINE

PARIT TANAH SEDIADA


S261
S229 S230 S256

DEVELOPMENT S152 S257


S264
S232 S233 S234 S235 S236 S237
S238

PEMBANGUNAN OSD 1

S280
S276
S220
S191

5 EKAR 12.140 Ha. S190

GIRL'S HOSTEL (30.000 Ek.)

S279
S153

S275
S213
S221
S192

S189

A A S207
S154

S193 S219
S222 FIELD S212 S211 S210

S214 S215 S216 S217 S218


B
S188
S155 S203 S208
S194 S195 S196 S197 S198 S199 S200 S201 S202
1 1
S156 S157 S158 S159 S160 S161 S162 S163 S164
S204
STP
S187
B S205
S209

S165

S206 S186

S166 QUARTERS S167 S168


S169 S170 S171
2 ELEV. W/TANK
WARDEN 2
S185
& PUMP HOUSE
TNB
SUBSTATION S172 S173 S174 S175 S176 S177 S178 S179 S180 S181 S182
S183

60' REZAB JALAN MASUK


74.810m 6.0 M BULDING SETBACK LINE
PARIT TANAH 56.848m
PB PARIT TANAH SEDIADA
270°44'00"

PB
270°28'00"

BAN
41.230m

PB 270°43'30"
34.640m

PB 270°45'10" 270°44'00" PB
PARIT TANAH PARIT TANAH PB 270°33'30" 200.930m (BOUNDARY LINE)
270°44'30" 126.600m Jum. PB 270°45'00" 138.910m
PARIT TANAH SEDIADA

PARIT TANAH ROAD AND DRAIN


ROAD AND DRAIN LAYOUT PLAN

PELAN TAPAK

OH
2500 3551

SELEK
SKALA 1:1200

<< KE
AE-199/BD/CRD/P/1