Presentation Outlines
• Background
• Objective
• Methodology
• Blackout data Analysis
• Modeling and Simulation
• System Vulnerabilities
• Mitigation Methods
• Conclusions and Recommendations
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 2
1. Background
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 3
1. Background…
EEP
• Installed capacity = 4390 MW
• Peak load = 2164 MW
• National Load Dispatch Center (NLDC) Has
jurisdiction to control the HV
• Substations
• Transmission lines
• Power plants
• Transnational exchange
• Sudan
• Djibouti
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 4
1. Background…
• EEP has been operating & managing the ICS with:
– Dispersed and geographically isolated generators,
– Complex transmission lines,
– Aged and scattered infrastructure combined with an increasing
demand in electricity consumption:
» Industrialization
» Rural electrification through UEAP
» EPS has suffered wide spread blackouts and become vulnerable
to cascading events, even for minor disturbances.
• Blackouts [Ethiopian context]:
– When the loss of electricity covers one or more regions: “Partial
Blackout” [40-80 %].
– when the loss of electricity encompasses more than 80 % of the
country: “Total Blackouts”
– 49 blackouts occurred since 2013 to mid of 2016.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 5
1. Background…
Problem statement
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 7
3. Methodology
Data Collection Data Analysis
- Obtain blackout data from NLDC • Analysis and systematic collation of
archive. blackouts data
- Interviewing and review of • For each Blackout (specific date, time,
records/reports. etc..)
- Data collected from Feb 2016 to mid of Review of operational policies
July 2016. Sequence of events
The effects of the faults – the scope
Perform Computer Simulations and extent of the disturbance.
The cause of the disturbance
Modeling
Identify system vulnerabilities Modeling of SLD of the interconnected
power system
Modeling of network components
Propose mitigation methods and draw (transmission lines, transformers,
conclusions generators, loads, etc…) using
DIgSILENT PowerFactory
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 8
4. Blackout Data Analysis
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 9
4. Blackout Data Analysis…
Pre-disturbance conditions
• System condition was stressful during peak hours
• Some important components out of service and/or
planned outages.
• Aging equipment, loosely reconnect conductors & out-
dated relay settings.
• Natural reasons such as drought, Lack of trimming, fire,
landslide, etc…
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 10
4. Blackout Data Analysis…
Initiating Events
• Short circuits (51.35 %)
• Loss of power plants (16.22 %)
• Overloads (13.51 %)
• Switching and temporary transients
(10.81 %)
• Protection & communication failures
(8.11 %)
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 11
4. Blackout Data Analysis…
Blackouts Trend
• It is the average number of blackouts
happening per year.
• Blackout trend of EEP is 14 blackouts per year.
• E. Bombard et al [71] had analysed the
blackout trends (from 1965 to 2011).
• USA = 1.13 blackouts per year
• UCTE grid = 0.81 blackouts per year.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 12
4. Blackout Data Analysis…
Blackout Indices
• Four significant blackout indices.
• Numbers of customers without service: (2015 &
2016: maximum being 4.2 million (100 %))
• Lost load (MW): largest lost load being 1401.04 MW
(Nov 28th 2015) & the lowest being 455 MW (15th Jan
2015).
• Blackout time duration: ranges from 2 hours to 22
hours.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 13
4. Blackout Data Analysis …
𝐸𝑛𝑒𝑟𝑔𝑦 𝑛𝑜𝑡 𝑠𝑒𝑟𝑣𝑒𝑑 𝑀𝑊ℎ
𝑆𝑒𝑣𝑒𝑟𝑖𝑡𝑦 𝑆𝑦𝑠𝑡𝑒𝑚 − 𝑀𝑖𝑛𝑢𝑡𝑒 =
𝐵𝑎𝑠𝑒 𝑜𝑓 𝑃𝑜𝑤𝑒𝑟 (𝑀𝑊)
Components List
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 16
5. Modeling & Simulation …
• PowerFactory has an inbuilt model of:
– Transmission lines, Generators, transformers, loads, etc…
• Input parameters:
Component(s) Parameters
Transmission lines Rated I, V, f; length & type; Parameters: R, X, C.
Generators Rated: V & capacity in MVA, PF , LF type, P & Q
limits, sub-transient & transient reactances.
Transformers No. of phases, rated MVA & frequency, rated voltage
(HV & LV), positive & zero sequence impedance, X/R
ratio, vector group, Tap settings (if any).
Loads P, V, PF, scaling factor, balanced/unbalanced, No. of
phases, AC/DC load.
Shunt compensators Nominal voltage, rated reactive power, # of steps,
Type and shunt controller
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 17
5. Modelling & Simulation…
The following technical analyses have
been carried out in the simulation:
• Power flow simulations to analyse system
performance under steady state conditions. The
aim is to determine:
• Voltage magnitude at the buses under steady
state and contingency conditions.
• Line, transformer and generator loadings under
steady state and contingency conditions.
• Time domain simulations (RMS) to analyse
system performance under transient conditions.
• To study the stability issues of the generating
units for disturbances.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 18
January 6th 2016 Blackout
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 19
Figure 4-7 Voltages of critical buses prior to disturbance
1.08
1.06
1.06
1.04
1.04 1.03
1.02 1.01 1.01 1.01
VOLTAGE IN P.U
1.01
1 1
1 1
1 0.99 0.99
0.98
0.98 0.97
0.96 0.96 0.96
0.96
0.94
0.92
0.9
BUS NAME
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 20
b) Initiating Event
• A 3-phase to ground SC fault (3L-G) on GG II_Sekoru 400kV line at a
distance 7.8km from Sekoru s/s.
• Simulation is performed to see system behavior before, during and
after the disturbance has been cleared.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 21
i) Before the disturbance
• The synchronous speed (𝜔𝑠 ) was synchronised to 1.0 pu
• The rotor angles of HPP generators prior to the initiating event
• No generator was overloaded.
• The terminal voltages & reactive powers of HPP generators were within limits
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 22
ii) During the disturbance
Generally, speed of HPP generators
increased
GG I & GG II
• GG I & GG II HPP generators were
accelerating fast (1.011 pu =
50.55 Hz)
• GG III and Awash III HPP gen
speeds’ not much (1.003 pu =
50.15 Hz)
• Those generators near to the
disturbance were accelerating
faster than remote generators.
• The same logic applies for the
terminal voltage.
𝟐𝑯𝒊 𝒅𝝎
= 𝑷𝒎𝒊 − 𝑷𝒆𝒊 ,
𝝎𝒔 𝒅𝒕
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 23
ii) During the disturbance…
• The terminal voltages of GG I & GG II HPP generators were dipped below 0.4 pu
• The voltages at GG III, Awash III & Melkawakena HPP generators were sagged below
0.7 pu.
• Voltages at Tekeze, Fincha & Beles HPP gene terminals were declined to 0.86 pu
• Reactive power exceeds limit.
a) Terminal voltage b) Reactive power
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 24
ii) During the disturbance…
• The electrical power output (𝑃𝑒𝑖 )
of each HPP generator
decreasing drastically.
• The turbine power input (𝑃𝑚𝑖 ) of
each generator was constant.
• 𝑃𝑚𝑖 > 𝑃𝑒𝑖 for each HPP
generators, the generator’s
speed was increased.
𝟐𝑯𝒊 𝒅𝝎
= 𝑷𝒎𝒊 − 𝑷𝒆𝒊 ,
𝝎𝒔 𝒅𝒕
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 25
ii) During the disturbance:
• The voltages at Sekoru & GG II 400kV were collapsed (0.015 pu)
• The voltages at critical buses found at AA region were dipped below 0.60 pu
• The voltages at Tekeze 230kV, B/Dar II 230kV and Beles 400kV buses were
sagged to 0.84 pu.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 26
January 6th 2016 Blackout ….
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 27
iii) After the fault has been cleared with 150 ms
• The speed of generators were recovered to the normal
operating ranges with damped oscillations.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 28
• The terminal voltages were recovered to steady state
values.
• The reactive powers supplied were also within limits.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 29
• The voltages at critical buses were returned to the acceptable
operating ranges.
• The frequency deviation observed were within limits.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 30
• The voltages across and the currents through GG II_Sebeta II
400kV and GG I _Sekoru 230kV lines within the ranges
a) Currents b) Voltages
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 31
c) Cascading Events
• For a fault clearing time of 150 ms:
– No overloaded equipment was observed on the system
– The parameters of each component (generators, lines, etc.)
and buses are within limits
• The system survivability was up to a fault clearing time of 400ms
(obtained from the simulation results).
• However, if the fault clearance time reached to 450ms, the
system would no longer be survived.
• The sequence of cascading events observed on the SCADA and
the simulation result obtained are synonymous for a fault clearing
time of 450ms.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 32
c) Cascading Events….cont’d
After SE-1,
• As GG II HPP generators had tripped, the system
lost 27 % of the total generation.
• The balance between the load and the generated
power had been violated
• The system frequency had been deteriorated
• The voltages at critical buses (load buses) were
depressed
• The system entered into the emergency
conditions
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 34
After SE-1,
Figure 4-17 Speed and rotor angle profiles of HPP generators after SE-1
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 35
After SE-1,
• The remaining generators were overloaded (exceeds 1.0 pu).
• Reverse power flow on GG I HPP (- 0.616 pu at 1.106 sec). (Figure b)
SE-2 • The voltage across GG II_Sebeta II 400kV line was increased to 1.172
pu after 1.651 seconds. ( Figure a) (b)
(a) GG II_Sebeta II 400kV
Overload
GG I (P = - 0.616 pu)
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 36
c) Cascading Events….
After SE-2:
• The remaining generators were
overloaded
• Their speed reached 0.925 pu
(46.25 Hz)
– MW tripped by OC
– Koka tripped by UF
– The remaining generators
tripped by UF
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 37
c) Cascading Events….
After SE-2…
• The voltages at critical buses
were worsened.
– Kality I 230kV, Legetafo 230 kV,
Sekoru 400kV & Gefersa 230kV Voltage sag
bus voltages were decreased
below 0.90 pu.
– At this condition there was no
way to restore the system.
– The cascade tripping continued
till the system was collapsed
within 60 seconds.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 38
c) Cascading Events…..
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 39
Summary of Simulation Results
N.B: More simulation results and discussions are included in the
study.
• From the analysis, most of the causes were linked to the ff technical problems:
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 41
Active power Performance Index (PIp )
𝑵𝒍 𝟐𝒏
𝑾 𝑷𝒍
𝐏𝐈𝐏 =
𝟐𝒏 𝑷𝒎𝒂𝒙
𝒍
𝒍=𝟏
• Where:
• 𝑃𝑙 is the MW flow of line 𝑙
• 𝑃𝑙𝑚𝑎𝑥 - is the MW capacity limit of line 𝑙
• 𝑊 – Real power weighting factor (in general, 𝑊 = 1)
• n- a positive number (n = 1, 2, 3… etc...). If n is a large number,
the 𝑃𝐼𝑃 will be a small number if flows are within limits and it
will be large if one or more lines are overloaded
𝐈𝐟 𝐏𝐈𝐩 ≥ 𝟏. 𝟎 𝒑𝒖, 𝒕𝒉𝒆 𝒍𝒊𝒏𝒆 𝒊𝒔 𝒔𝒂𝒊𝒅 𝒕𝒐 𝒃𝒆 𝒔𝒆𝒗𝒆𝒓𝒆
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 42
Voltage Performance Index (PIv )
𝑵𝑩 𝒔𝒑 𝟐𝒏
𝑽𝒊 − 𝑽𝒊
𝐏𝐈𝐯 = 𝒘ൗ𝟐𝒏 𝒔𝒑
𝑽𝒊
𝒊=𝟏
• Where:
• 𝑉𝑖 is the voltage magnitude corresponding to bus i
𝑠𝑝
• 𝑉𝑖 Specified voltage magnitude corresponding to bus i
• 𝑁𝐵 - Number of buses in the system voltage magnitude
either below a specified minimum or above a specified
maximum
• 𝑤 - Real non-negative weighting factor (in general 𝑤 = 1)
𝑰𝒇 𝐏𝐈𝐯 ≥ 𝟎. 𝟎𝟐 𝒑𝒖, 𝒕𝒉𝒆 𝒍𝒊𝒏𝒆 𝒊𝒔 𝒔𝒆𝒗𝒆𝒓𝒆
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 43
6. System Vulnerabilities…cont’d
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 44
Figure 5-1 Line outages ranked in terms of 𝐏𝐈𝐩
8
7.3238
4 3.591
3.523
3.169
3 2.537
2.381
1.83
2 1.641
1.559
1.337
1.15
1.093 1.045 1.023
1
0.08
0.065
0.06 0.055
0.0472
0.0433
0.04 0.0374 0.0356
0.034
0.0313
0.0261 0.0261 0.0254 0.0254 0.0254
0.022
0.02
10
9 9
6 6 6
6
5 5 5
4 4 4
4
3
2 2 2
2
1 1 1
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 48
Table 5-3 Vulnerabilities ranked based on number of outages lead to overloads
Overloaded elements Number of outages lead to overload Highest percentage loading
Combolcha _Tr (230/132kV) 12 204.1
Kality I_Akaki I 132kV line I 12 119.9
Kality I_Akaki I 132kV line II 12 119.9
Gefersa_Addis North 132kV line 6 129.9
Cotobie_Weregenu TP 132kV Lin 5 141.9
Sebeta I_Mekanisa 132kV line 4 164.2
Gefersa_Kality I 132kV line 3 109.6
Ghedo_230/132/15kV Tr 2 213.7
Legetafo_Ayat GIS 132kV line 2 137.6
Cotobie_Ayat GIS 132kV line 2 137
Sekoru_230/132kV Tr 2 133.1
Alamata_Combolcha 230kV line 1 149.7
D/Markos 400/230kV Tr 1 135.7
Cotobie_Addis East II 132kV line 1 124.4
Sululta 400/230kV Tr1 1 117.6
Sululta 400/230kV Tr2 1 117.6
Combolcha_Legetafo 230kV line 1 107.7
BDR_TR1 (400/230kV) 1 102
BDR_TR2 (400/230kV) 1 102
Metu_230/66/15kV Tr 1 101.5
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 49
6. System Vulnerabilities…cont’d
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 50
7. Mitigation Methods
• The vulnerability analysis and the blackout simulation studies
proved that most of the system collapses were linked to the ff
problems :
– Poor protection system coordination, Breaker not fast enough to clear
the fault, Poor planned outages, and
– Violation of the N-1 criterion and other security rules outlined in the
operating policy guidelines of EEP.
• not having additional paths (double circuit lines) for the major lines.
• Not using EMS/SCADA at major s/s (e.g. Sebeta I & Gefersa).
• Therefore, the better way of mitigating the impacts of the
disturbances are:
– High-speed fault clearing, Fine protection system coordination,
proper planned interruptions, and adhering to the security rules.
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 51
7. Mitigation Methods……
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 53
• The voltage across Sebeta I _Mekanisa 132kV line once dipped to 0.5 pu during
the disturbance and returned well above 0.92 pu.
• The current through it was returned to 0.85 pu.
• No overloaded line was seen after the fault has cleared
29-Oct-17 AAiT, School of Elect. & Comp. Engineering, Addis Ababa, Ethiopia 54
7. Mitigation Methods…cont’d
• The currents through and the voltages across
transformers were within acceptable ranges.
• No power system parameters would exceed
limits.
• Hence the planned interruptions of 11th
December 2015 was bad decision